Opendata, web and dolomites

ECWRTI SIGNED

ECOLORO: Reuse of Waste Water from the Textile Industry

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ECWRTI project word cloud

Explore the words cloud of the ECWRTI project. It provides you a very rough idea of what is the project "ECWRTI" about.

water    textile    technological    market    roll    containerized    suitable    stakeholders    economically    purification    materials    ecwrti    balanced    electro    rapid    proof    inotex    brownfield    optimized    resource    flexible    fresh    total    48    advantages    colorants    greenfield    locations    tools    consists    flotation    euratex    attractive    scalable    ecoloro    puts    membrane    downstream    team    energy    coagulation    full    board    engineering    retro    extraction    intake    critical    enabler    remove    morselt    trl    feedback    use    vito    streams    footprint    uses    demand    optimizing    producing    modular    pollutants    industry    efficiency    commercial    re    manufacturing    guidance    months    ready    chemicals    ispt    innovation    fit    pavese    75    tintoria    ultrafiltration    sme    vital    reducing    reuse    scarce    sectors    industrial    flocculants    osmosis    concentrated    constant    utexbel    waste    least    run    ec    proven    advisory    reverse    combined   

Project "ECWRTI" data sheet

The following table provides information about the project.

Coordinator
STICHTING S-ISPT 

Organization address
address: GROEN VAN PRINSTERERLAAN 37
city: AMERSFOORT
postcode: 3818 JN
website: www.ispt.eu

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website http://ecwrti.eu/
 Total cost 4˙822˙849 €
 EC max contribution 3˙748˙967 € (78%)
 Programme 1. H2020-EU.3.5.4. (Enabling the transition towards a green economy and society through eco-innovation)
 Code Call H2020-WATER-2014-two-stage
 Funding Scheme IA
 Starting year 2015
 Duration (year-month-day) from 2015-06-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    STICHTING S-ISPT NL (AMERSFOORT) coordinator 581˙537.00
2    ECOLORO BV NL (HILVERSUM) participant 1˙731˙291.00
3    VLAAMSE INSTELLING VOOR TECHNOLOGISCH ONDERZOEK N.V. BE (MOL) participant 579˙955.00
4    UTEXBEL NV BE (RONSE) participant 526˙601.00
5    INOTEX SPOL SRO CZ (DVUR KRALOVE NAD LABEM) participant 147˙700.00
6    EUROPEAN APPAREL AND TEXTILE CONFEDERATION BE (BRUXELLES) participant 81˙750.00
7    TINTORIA PAVESE SPA IT (PAVIA) participant 54˙490.00
8    MORSELT BORNE BV NL (BORNE) participant 45˙641.00

Map

 Project objective

Constant extraction of increasingly scarce fresh water puts a vital demand on increasing water-use efficiency in all sectors. The ECWRTI project will demonstrate the EColoRO concept on full industrial scale in two locations in the European textile industry.

The EColoRO concept uses electro-coagulation (EC) combined with flotation to remove pollutants, colorants and chemicals from waste water very effectively. This unique feature enables using ultrafiltration and reverse osmosis membrane processes downstream in an optimized way. The key advantages are: - Total reuse of waste-water in textile industry reducing fresh-water intake by at least 75% - Low-cost and economically highly attractive - Very flexible, containerized and modular, easy scalable, low footprint, suitable for retro-fit, brownfield or greenfield application - Low energy use, no use of chemicals or flocculants, producing concentrated waste streams with very high re-use potential - Enabler for optimizing use of water, allowing for advanced energy and resource efficiency in the textile manufacturing processes

EC and the EColoRO concept are currently proven at TRL 6. The ECWRTI project will run for 48 months and will deliver technological proof at TRL 8, ready for commercial uptake. It will further deliver the materials, analysis and tools needed for rapid commercial roll-out. The consortium consists of a focused and well-balanced team. The project is SME driven with EColoRO as coordinator and 6 partners from 3 EU member states with key know-how on waste water purification (VITO, EColoRO), textile technology and production (Inotex, Utexbel, Tintoria Pavese), electro-coagulation and engineering (Morselt), process technology, open innovation and project support (ISPT) and EU wide market access in the textile sector (Euratex). An advisory board with stakeholders from textile, process industry and waste water sectors will provide guidance, critical feedback and dissemination support.

 Deliverables

List of deliverables.
Project website and PR materials Other 2019-05-30 17:37:55

Take a look to the deliverables list in detail:  detailed list of ECWRTI deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ECWRTI" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ECWRTI" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.4.)

PROMPT (2019)

PRemature Obsolescence Multi-Stakeholder Product Testing Program

Read More  

CE2019 (2019)

The sustainable transition to a low carbon, climate-resilient circular economy: Creating the knowledge base

Read More  

CarE-Service (2018)

Circular Economy Business Models for innovative hybrid and electric mobility through advanced reuse and remanufacturing technologies and services

Read More