Opendata, web and dolomites

ABRACADABRA

Assistant Buildings’ addition to Retrofit, Adopt, Cure And Develop the Actual Buildings up to zeRo energy, Activating a market for deep renovation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ABRACADABRA project word cloud

Explore the words cloud of the ABRACADABRA project. It provides you a very rough idea of what is the project "ABRACADABRA" about.

reaching    financial    characterised    actual    substantial    efficiency    quality    deep    stock    time    assistant    market    times    creation    create    demonstrating    fa    concerted    public    assisted    nearly    intended    grading    transformation    payback    interventions    risk    renovation    proven    sources    launch    ccedil    actions    aside    jobs    investors    degree    prior    central    fact    additions    benefits    excessively    stakeholders    synergy    assumption    building    confidence    play    front    gap    attractiveness    buildings    punctual    consist    zero    goals    strategy    private    funds    generally    environment    harmonized    acceleration    ultimately    pay    rooftop    investments    investment    energy    initial    addictions    estate    renewable    europe    ade    allocated    entire    policy    densification    unlock    extensions    re    reducing    abra    adore    abracadabra    construction    back    architectural    fill    innovative   

Project "ABRACADABRA" data sheet

The following table provides information about the project.

Coordinator
ALMA MATER STUDIORUM - UNIVERSITA DI BOLOGNA 

Organization address
address: VIA ZAMBONI 33
city: BOLOGNA
postcode: 40126
website: www.unibo.it

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.abracadabra-project.eu
 Total cost 1˙993˙168 €
 EC max contribution 1˙993˙168 € (100%)
 Programme 1. H2020-EU.3.3.7. (Market uptake of energy innovation - building on Intelligent Energy Europe)
 Code Call H2020-EE-2015-3-MarketUptake
 Funding Scheme CSA
 Starting year 2016
 Duration (year-month-day) from 2016-03-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ALMA MATER STUDIORUM - UNIVERSITA DI BOLOGNA IT (BOLOGNA) coordinator 217˙825.00
2    UNION INTERNATIONALE DE LA PROPRIETE IMMOBILIERE BE (BRUSSELS) participant 171˙218.00
3    RENESCO SIA LV (RIGA) participant 162˙131.00
4    ICLEI EUROPEAN SECRETARIAT GMBH (ICLEI EUROPASEKRETARIAT GMBH) DE (FREIBURG IM BREISGAU) participant 146˙131.00
5    CONSEIL DES ARCHITECTES D'EUROPE BE (BRUXELLES) participant 135˙562.00
6    NORSK TRETEKNISK INSTITUTT FORENING NO (OSLO) participant 133˙500.00
7    RINA CONSULTING SPA IT (GENOVA) participant 132˙375.00
8    BANCA MONTE PASCHI BELGIO SA BE (BRUXELLES) participant 123˙500.00
9    ECUBA SNC IT (BOLOGNA) participant 119˙125.00
10    TECHNISCHE UNIVERSITEIT DELFT NL (DELFT) participant 116˙725.00
11    ETHNIKO KAI KAPODISTRIAKO PANEPISTIMIO ATHINON EL (ATHINA) participant 96˙000.00
12    KNOWLEDGE INNOVATION MARKET S.L. ES (BARCELONA) participant 92˙812.00
13    ENERGYPRO LIMITED UK (LONDON) participant 82˙575.00
14    SOCIEDAD ARAGONESA DE GESTION AGROAMBIENTAL SL ES (ZARAGOZA) participant 77˙975.00
15    COMITE EUROPEEN DE COORDINATION DE L'HABITAT SOCIAL AISBL BE (BRUXELLES) participant 55˙481.00
16    CHERNOMORSKA REGIONALNA AGENZIA ZA UPRAVLENIE NA ENERGIYATA BG (VARNA) participant 54˙750.00
17    PARTENAIRES EUROPEENS POUR L'ENVIRONNEMENT BE (BRUXELLES) participant 51˙406.00
18    MUNICIPIUL BRASOV RO (BRASOV) participant 24˙075.00

Map

 Project objective

ABRACADABRA is based on the prior assumption that non-energy-related benefits play a key role in the deep renovation of existing buildings. In particular, ABRA actions will focus on the creation of a substantial increase of the real estate value of the existing buildings through a significant energy and architectural transformation. The central goals of the proposal consist of an important reduction of the pay back time of the interventions, a strengthening of the key investors’ confidence, increasing quality and attractiveness of the existing buildings’ stock and, finally, reaching a concrete market acceleration towards the Nearly Zero Energy Buildings target. The actual investment gap in the deep renovation sector is due to the fact that high investments are required up-front and they are generally characterised by an excessively high degree of risk and long payback times. It is therefore necessary to develop harmonized, concerted and innovative actions to unlock the needed public and private funds, fill the energy efficiency investment gap and ultimately contribute to re-launch the construction market and create new jobs. Therefore, ABRA aims at demonstrating to the key stakeholders and financial investors the attractiveness of a new renovation strategy based on AdoRe, intended as one (or a set of) Assistant Building unit(s) - like aside or façade addictions, rooftop extensions or even an entire new building construction - that adopt the existing buildings (the Assisted Buildings). The creation of these new Assistant Buildings’ Additions integrated with Renewable Energy Sources aims at reducing the initial investment allocated for the deep renovation of the existing building creating an up-grading synergy between old and new. The ABRA strategy results in the implementation of a punctual densification policy that has been proven capable of fostering the investments in deep renovation of the existing built environment throughout Europe

 Deliverables

List of deliverables.
First Issue of Communication and dissemination plan Documents, reports 2020-01-15 12:41:08
Tool Kit Regulatory, preliminary report Documents, reports 2020-01-15 12:41:08
Initial List of stakeholders engaged Documents, reports 2020-01-15 12:41:08
Web Portal Websites, patent fillings, videos etc. 2020-01-15 12:41:08
Tool Kit Financing, preliminary report Documents, reports 2020-01-15 12:41:08
Past, running and future projects on add-ons Documents, reports 2020-01-15 12:41:08
Past and running projects on add-ons, Challenges & opportunities Documents, reports 2020-01-15 12:41:08
Project flyers and Banners Websites, patent fillings, videos etc. 2020-01-15 12:41:08
First Update of the List of stakeholders engaged Documents, reports 2020-01-15 12:41:08
Case Studies, selection criteria Documents, reports 2020-01-15 12:41:08
Tool Kit Technical, preliminary report Documents, reports 2020-01-15 12:41:08
First periodic Update of Communication and dissemination plan Documents, reports 2020-01-15 12:41:08

Take a look to the deliverables list in detail:  detailed list of ABRACADABRA deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Annarita Ferrante; Anastasia Fotopoulou; Lorna Dragonetti; Giovanni Semprini
DEEP RENOVATION IN SUSTAINABLE CITIES: ZERO ENERGY, ZERO URBAN SPRAWL AT ZERO COSTS IN THE ABRACADABRA STRATEGY
published pages: , ISSN: , DOI:
2020-01-15
2017 Submitted by: Dimitra Papadaki (National & Kapodistrian University of Athens (NKUA))
ABRACADABRA project- Past, running and future projects on Add-ons
published pages: , ISSN: , DOI:
BUILD UP -Portal 2020-01-15
2017 Submitted by: Dimitra Papadaki (National & Kapodistrian University of Athens (NKUA))
ABRACADABRA project: Regulatory Toolkit
published pages: , ISSN: , DOI:
BUILD UP - Portal 2020-01-15
2017 Submitted by: Dimitra Papadaki (National & Kapodistrian University of Athens (NKUA))
ABRACADABRA project- Technical Toolkit
published pages: , ISSN: , DOI:
BUILD UP -Portal 2020-01-15
2017 Dimitra Papadaki
OVERVIEW | Increasing the real estate value of existing buildings to counterbalance an energy retrofit
published pages: , ISSN: , DOI:
BUILD UP - Portal 2020-01-15
2016 Agatha Rogala
\"\"\"2nd ABRACADABRA Workshop\"\"\"
published pages: 10, ISSN: , DOI:
UIPI Regular Update (Internal Newsletter) No. 10, 01/11/2016 2020-01-15
2017 Giovanni Semprini, Annarita Ferrante, Elena Cattani, Anastasia Fotopolulou
New strategies towards nearly zero energy in existing buildings: the ABRACADABRA project
published pages: 151-158, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2017.11.131
Energy Procedia 140 2020-01-15
2017 A. Ferrante, A. Fotopoulou, E. Cattani, G. Semprini
Deep renovation in changing cities:Densification and real-estate value for cost-effective energy targets in the ABRACADABRA strategy
published pages: 1935-1947, ISSN: , DOI:
Proceedings of the International Conference on Changing Cities III: Spatial, Design, Landscape & Socio-Economic dimensions 2020-01-15
2017 Agatha Rogala
\"\"\"Tackling Practical and Regulatory Challanges to Energy Efficiency Retrofitting - 3rd ABRACADABRA International Workshop\"\"\"
published pages: , ISSN: , DOI:
UIPI Property Insider - Quarterly News form Brussels (External Newsletter) No. 1, 01/07/2017 2020-01-15
2018 RINA
RINA invites near-zero upgrade case studiesLocal authorities have been invited to enter building renovation projects as case studies into the pan-European ABRACADABRA project.
published pages: , ISSN: , DOI:
2020-01-15
2018 Architects\' Council of Europe
Why not add space to your building to pay for the energy renovation?
published pages: , ISSN: , DOI:
2020-01-15
2018 James Drinkwater, Director of WorldGBC\'s Europe Regional Network; Judit Kimpian, Chair - Sustainability Group​ at the Architects\' Council of Europe
How to Make Money from Climate-Proofing Your Property
published pages: , ISSN: , DOI:
2020-01-15
2018 Ms. Giulia Obinu and Dr. Veronika Schröpfer, Architects’ Council of Europe (ACE)
Renovating your home and fighting climate change at the same time is now affordable and more convenient thanks to the EU-funded ABRACADABRA project
published pages: , ISSN: , DOI:
BUILD UP portal 2020-01-15
2016 RINA
ABRACADABRA Nearly Zero Energy Buildings
published pages: , ISSN: , DOI:
2020-01-15
2018 M.N. Assimakopoulos, R.De Masi, D. Papadaki, S. Ruggiero, G.Vanoli,
Energy audit and performance optimization of a residential university building in heating dominated climates of Italian backcountry
published pages: , ISSN: 2421-4574, DOI: 10.17410/tema.v4i3.202
TEMA technologies, engineering, materials, architecture Vol. 4, No. 3 (2018) - Special 2020-01-15

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ABRACADABRA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ABRACADABRA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.7.)

PremiumLight_Pro (2016)

Next-level energy efficient lighting systems in the service sector

Read More  

INTAS (2016)

INdustrial and tertiary product Testing and Application of Standards

Read More  

EU-MERCI (2016)

EU-MERCI - EU coordinated MEthods and procedures based on Real Cases for the effective implementation of policies and measures supporting energy efficiency in the Industry

Read More