source    engineers    engineering    gas    clear    acting    figures    patented    co2    thanks    commercialization    synthetic    power    ton    sale    time    pilot    independent    reduce    small    back    consequent    kwel    technicians    framework    25    progeo    mainly    preliminary    store    supplier    fuelled    fabricate    market    natural    business    mvp    teg    start    electricity    energy    producer    lt    substations    mwh    dioxide    mwth    managers    85    plants    precision    500    owners    construction    generation    minimum    flexibility    kw    amount    ipp    benefits    industrialization    turnover    medium    peak    converting    position    ebitda    competitive    emission    ups    scope    2015    plant    methane    allowed    plan    price    divide    consolidated    modular    shut    potentialities    active    managerial    tax    pay    install    electrical    strategic    thermoelectric    downs    italian    35    revenue    additional    epc    customers    company    lamep    possibility    ch4    staff    prototype    fast    emissions    mwel    capacity    demonstrated    carbon    producing    10    plc   

Project "ProGeo" data sheet

The following table provides information about the project.

Coordinator
PLC SYSTEM - SRL 

Organization address
address: ZONA INDUSTRIALE INDUSTRIALE LOC. PANTANO
city: ACERRA NA
postcode: 80011
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.plcgroupspa.com/it/plc-system-progeo.php
 Total cost 3˙493˙750 €
 EC max contribution 2˙443˙875 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    PLC SYSTEM - SRL IT (ACERRA NA) coordinator 2˙026˙886.00
2    LA. ME. P. DI CAMPOLUCCI ERINO & C.SOCIETA IN NOME COLLECTIVO IT (ROMA) participant 416˙988.00

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

PLC System is an Italian medium company acting as a EPC and/or supplier for electrical plants/substations engineering and construction and as a IPP (independent power producer). The high technical and managerial capacity allowed to PLC to reach a consolidated position in the European energy sector, with a 2015 turnover of 35 M€ and a 85 figures staff, mainly composed by engineers and high level technicians. PLC is very active in the energy R&D, with the clear scope to fabricate and install its own products to be offered in the very competitive energy market. Within this framework, PLC developed ProGeo, a 500 kW Power-to-Gas modular unit able to store electricity by converting carbon dioxide (CO2) into synthetic methane (CH4) with high flexibility thanks to fast start-ups and shut-downs. The patented product will be offered to owners and managers of small Thermoelectric Generation (s-TEG, < 50 MWth) plants, who will have the possibility to store energy and avoid the sale of low-price electricity during low peak requirements (electricity market price < 20-30 €/MWh) and to reduce the CO2 emissions and the consequent carbon tax amount (5 ÷ 20 €/ton of CO2), producing an additional revenue source from the synthetic-CH4 generation. ProGeo will provide customers with the following benefits: • increasing of average electricity sale price = 25% • reduction of CO2 emission and tax = -10% • increasing of TEG plant EBITDA = up to 1 M€/y for a 20 MWel natural gas fuelled power plant • ProGeo pay-back time = 3 ÷ 4.5 years • reduced start-ups / shut-downs of the TEG PLC has developed a pilot prototype of 30 kWel, by which the technology potentialities have been demonstrated, has identified a strategic partner (LAMEP, a company operating in the field of precision engineering) and has defined a business plan with the assessment of the minimum viable product (MVP), the production cost and market price, a preliminary industrialization and commercialization plan.

 Deliverables

List of deliverables.
Certification, HAZOP & LCA Documents, reports 2019-11-22 10:57:43
Preliminary tests Documents, reports 2019-11-22 10:57:43

Take a look to the deliverables list in detail:  detailed list of ProGeo deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PROGEO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PROGEO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

iDriver (2015)

iDriver

Read More  

MirrorPV (2015)

MirrorPV - Balanced growth photovoltaic generation with Roof PV mirrors

Read More