Opendata, web and dolomites

ProGeo

ProGeo

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ProGeo project word cloud

Explore the words cloud of the ProGeo project. It provides you a very rough idea of what is the project "ProGeo" about.

ipp    industrialization    fast    potentialities    25    synthetic    plan    thermoelectric    substations    source    amount    mwh    small    additional    flexibility    consequent    company    emissions    position    benefits    turnover    producer    time    independent    preliminary    precision    shut    gas    progeo    pay    competitive    managers    power    technicians    capacity    methane    patented    acting    commercialization    ebitda    carbon    market    construction    reduce    price    italian    engineers    supplier    energy    peak    clear    plant    divide    fabricate    minimum    producing    emission    thanks    pilot    ch4    business    customers    scope    install    staff    framework    revenue    electrical    2015    mvp    natural    ton    85    kwel    store    converting    500    plants    medium    demonstrated    tax    downs    ups    teg    figures    consolidated    engineering    generation    active    strategic    managerial    lamep    owners    35    prototype    mwth    mainly    possibility    start    kw    epc    plc    mwel    lt    electricity    dioxide    fuelled    allowed    back    sale    10    modular    co2   

Project "ProGeo" data sheet

The following table provides information about the project.

Coordinator
PLC SYSTEM - SRL 

Organization address
address: ZONA INDUSTRIALE INDUSTRIALE LOC. PANTANO
city: ACERRA NA
postcode: 80011
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.plcgroupspa.com/it/plc-system-progeo.php
 Total cost 3˙493˙750 €
 EC max contribution 2˙443˙875 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    PLC SYSTEM - SRL IT (ACERRA NA) coordinator 2˙026˙886.00
2    LA. ME. P. DI CAMPOLUCCI ERINO & C.SOCIETA IN NOME COLLECTIVO IT (ROMA) participant 416˙988.00

Map

 Project objective

PLC System is an Italian medium company acting as a EPC and/or supplier for electrical plants/substations engineering and construction and as a IPP (independent power producer). The high technical and managerial capacity allowed to PLC to reach a consolidated position in the European energy sector, with a 2015 turnover of 35 M€ and a 85 figures staff, mainly composed by engineers and high level technicians. PLC is very active in the energy R&D, with the clear scope to fabricate and install its own products to be offered in the very competitive energy market. Within this framework, PLC developed ProGeo, a 500 kW Power-to-Gas modular unit able to store electricity by converting carbon dioxide (CO2) into synthetic methane (CH4) with high flexibility thanks to fast start-ups and shut-downs. The patented product will be offered to owners and managers of small Thermoelectric Generation (s-TEG, < 50 MWth) plants, who will have the possibility to store energy and avoid the sale of low-price electricity during low peak requirements (electricity market price < 20-30 €/MWh) and to reduce the CO2 emissions and the consequent carbon tax amount (5 ÷ 20 €/ton of CO2), producing an additional revenue source from the synthetic-CH4 generation. ProGeo will provide customers with the following benefits: • increasing of average electricity sale price = 25% • reduction of CO2 emission and tax = -10% • increasing of TEG plant EBITDA = up to 1 M€/y for a 20 MWel natural gas fuelled power plant • ProGeo pay-back time = 3 ÷ 4.5 years • reduced start-ups / shut-downs of the TEG PLC has developed a pilot prototype of 30 kWel, by which the technology potentialities have been demonstrated, has identified a strategic partner (LAMEP, a company operating in the field of precision engineering) and has defined a business plan with the assessment of the minimum viable product (MVP), the production cost and market price, a preliminary industrialization and commercialization plan.

 Deliverables

List of deliverables.
Certification, HAZOP & LCA Documents, reports 2019-11-22 10:57:43
Preliminary tests Documents, reports 2019-11-22 10:57:43

Take a look to the deliverables list in detail:  detailed list of ProGeo deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PROGEO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PROGEO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

iDriver (2015)

iDriver

Read More  

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More