Opendata, web and dolomites

ProGeo

ProGeo

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ProGeo project word cloud

Explore the words cloud of the ProGeo project. It provides you a very rough idea of what is the project "ProGeo" about.

thermoelectric    fabricate    source    consequent    emission    business    supplier    engineering    flexibility    ch4    co2    mwel    capacity    demonstrated    independent    industrialization    minimum    strategic    acting    shut    italian    tax    pilot    scope    position    generation    consolidated    substations    dioxide    electricity    carbon    amount    possibility    ipp    peak    emissions    sale    commercialization    managers    active    engineers    competitive    kwel    methane    store    mvp    time    35    back    customers    plc    install    thanks    ups    epc    price    2015    technicians    precision    electrical    reduce    energy    ton    company    preliminary    revenue    benefits    managerial    converting    small    fast    downs    ebitda    producer    progeo    kw    plant    teg    staff    natural    start    500    framework    25    divide    patented    prototype    pay    mwth    10    owners    construction    fuelled    figures    market    lamep    medium    mainly    plants    plan    clear    mwh    modular    synthetic    power    allowed    producing    turnover    gas    85    potentialities    lt    additional   

Project "ProGeo" data sheet

The following table provides information about the project.

Coordinator
PLC SYSTEM - SRL 

Organization address
address: ZONA INDUSTRIALE INDUSTRIALE LOC. PANTANO
city: ACERRA NA
postcode: 80011
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.plcgroupspa.com/it/plc-system-progeo.php
 Total cost 3˙493˙750 €
 EC max contribution 2˙443˙875 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    PLC SYSTEM - SRL IT (ACERRA NA) coordinator 2˙026˙886.00
2    LA. ME. P. DI CAMPOLUCCI ERINO & C.SOCIETA IN NOME COLLECTIVO IT (ROMA) participant 416˙988.00

Map

 Project objective

PLC System is an Italian medium company acting as a EPC and/or supplier for electrical plants/substations engineering and construction and as a IPP (independent power producer). The high technical and managerial capacity allowed to PLC to reach a consolidated position in the European energy sector, with a 2015 turnover of 35 M€ and a 85 figures staff, mainly composed by engineers and high level technicians. PLC is very active in the energy R&D, with the clear scope to fabricate and install its own products to be offered in the very competitive energy market. Within this framework, PLC developed ProGeo, a 500 kW Power-to-Gas modular unit able to store electricity by converting carbon dioxide (CO2) into synthetic methane (CH4) with high flexibility thanks to fast start-ups and shut-downs. The patented product will be offered to owners and managers of small Thermoelectric Generation (s-TEG, < 50 MWth) plants, who will have the possibility to store energy and avoid the sale of low-price electricity during low peak requirements (electricity market price < 20-30 €/MWh) and to reduce the CO2 emissions and the consequent carbon tax amount (5 ÷ 20 €/ton of CO2), producing an additional revenue source from the synthetic-CH4 generation. ProGeo will provide customers with the following benefits: • increasing of average electricity sale price = 25% • reduction of CO2 emission and tax = -10% • increasing of TEG plant EBITDA = up to 1 M€/y for a 20 MWel natural gas fuelled power plant • ProGeo pay-back time = 3 ÷ 4.5 years • reduced start-ups / shut-downs of the TEG PLC has developed a pilot prototype of 30 kWel, by which the technology potentialities have been demonstrated, has identified a strategic partner (LAMEP, a company operating in the field of precision engineering) and has defined a business plan with the assessment of the minimum viable product (MVP), the production cost and market price, a preliminary industrialization and commercialization plan.

 Deliverables

List of deliverables.
Certification, HAZOP & LCA Documents, reports 2019-11-22 10:57:43
Preliminary tests Documents, reports 2019-11-22 10:57:43

Take a look to the deliverables list in detail:  detailed list of ProGeo deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PROGEO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PROGEO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

iDriver (2015)

iDriver

Read More  

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More