Opendata, web and dolomites

WheelWatcher

Advanced wheel measuring system for greater rail sector’s profitability

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 WheelWatcher project word cloud

Explore the words cloud of the WheelWatcher project. It provides you a very rough idea of what is the project "WheelWatcher" about.

quality    displacements    mechanical    service    actions    drive    stability    distance    precision    enhanced    locations    25    monitoring    boost    weather    deep    costly    irrespective    premature    excellence    conducting    hoc    jobs    rely    consequence    dramatic    improvements    mechatronic    reprofiling    platform    subsequent    aggregate    industrial    cell    maintenance    23    laser    thermoelectric    profitability    wheels    regarding    created    positive    normal    power    outdoor    watcher    producing    works    placement    self    added    moving    faced    density    50    economic    environmental    km    impacts    diagnosis    tool    wayside    spare    software    remote    co2    profit    avoiding    extreme    35    speeds    status    preventive    automated    replacement    speed    thermal    scrap    guaranteeing    disruption    comprising    wheel    measuring    cut    frequency    wheelwatcher    trains    operators    ad    wear    inspection    time    life    railway    tracks    progresses    final    accurate    operator    doubling   

Project "WheelWatcher" data sheet

The following table provides information about the project.

Coordinator
DANOBAT 

Organization address
address: POLIGONO INDUSTRIAL ARRIAGA 21
city: ELGOIBAR
postcode: 20870
website: www.danobat.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.wheelwatcher.eu/
 Total cost 2˙718˙723 €
 EC max contribution 2˙065˙331 € (76%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2015-1
 Funding Scheme IA
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2018-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DANOBAT ES (ELGOIBAR) coordinator 698˙372.00
2    IDEKO S COOP ES (ELGOIBAR) participant 540˙750.00
3    PROPHOTONIX LIMITED UK (HATFIELD BROAD OAK) participant 361˙932.00
4    DR NEUMANN PELTIER-TECHNIK GMBH DE (NEURIED) participant 343˙176.00
5    SOCIEDAD PUBLICA EUSKO TRENBIDEAK FERROCARRILES VASCOS S.A. ES (BILBAO) participant 121˙100.00

Map

 Project objective

The final aim of Wheel Watcher project is to boost the profitability of the railway sector by means of an advanced wheel status monitoring and control system, providing railway operators with accurate and real-time information on wheel wear to drive preventive maintenance actions thus avoiding premature replacement of this equipment. Main industrial impact of the project is to achieve a wheel life increase of 50%, and an increase of 25% of distance between wheel reprofiling actions, allowing the railway operator for conducting a remote but in-depth inspection of wheels. This industrial impact involves a subsequent relevant economic impact, targeting a cost reduction of 25% in maintenance-related costs as a result of less spare wheels and less low value-added works needed. These industrial impacts rely on relevant technical progresses: a high precision mechatronic platform addressing mechanical challenges derived of its wayside placement, a remote measuring unit comprising an ad-hoc thermoelectric cell guaranteeing thermal stability under potential extreme weather conditions, and a novel laser system doubling current power density available, able to measure trains moving at high speeds in outdoor locations, and a user-friendly control software including a self-diagnosis tool. WheelWatcher will have a deep impact on project’s partners, producing an aggregate profit of 23 M€ with more than 35 new jobs expected to be created, and a positive environmental impact due to less CO2 and less scrap. Excellence of the project will allow for dramatic improvements regarding the more relevant challenges faced by railway operators, as compared to the current state-of-the-art: automated high frequency wheel measuring, enhanced quality of measurements at normal speed (100 km/h) irrespective of weather conditions, remote monitoring without costly displacements to the tracks, no need of service disruption during measuring processes, and as consequence of all, a cut on operating costs.

 Deliverables

List of deliverables.
Final (public) project report Documents, reports 2019-05-31 11:51:33

Take a look to the deliverables list in detail:  detailed list of WheelWatcher deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WHEELWATCHER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WHEELWATCHER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

DynaHUBS (2016)

DynaHUBs is a new application designed to kick start the development of the Physical Internet using a crowd-sourced approach

Read More