Opendata, web and dolomites

X-MINE SIGNED

Real-Time Mineral X-Ray Analysis for Efficient and Sustainable Mining

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 X-MINE project word cloud

Explore the words cloud of the X-MINE project. It provides you a very rough idea of what is the project "X-MINE" about.

sustainability    energy    scientific    options    estimation    germanium    copper    hours    ing    economic    feasible    operations    smaller    association    academic    sensing    months    chosen    supports    gallium    characterization    ec    downstream    rare    worker    suppliers    bulgaria    lower    requested    vision    critical    minerals    automated    cyprus    sites    earth    sizes    deposits    resource    companies    xrf    mineral    platinum    raw    performances    software    efficiency    ore    mining    transmission    sorting    zinc    small    3m    group    metals    deploy    extraction    environmental    economically    greece    planning    silver    concentration    integration    mine    water    3d    45    pilots    stage    gold    exploration    demonstrators    contribution    industrial    selectivity    lifecycle    men    efficient    safety    materials    chemicals    generating    exposure    context    blasting    indium    sweden    illustrate    fluorescence    adverse    xrt    socio    technologies    health    ray   

Project "X-MINE" data sheet

The following table provides information about the project.

Coordinator
Teknologian tutkimuskeskus VTT Oy 

Organization address
address: VUORIMIEHENTIE 3
city: Espoo
postcode: 2150
website: www.vtt.fi

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Finland [FI]
 Project website http://www.xmine.eu/
 Total cost 12˙064˙712 €
 EC max contribution 9˙318˙197 € (77%)
 Programme 1. H2020-EU.3.5.3. (Ensuring the sustainable supply of non-energy and non-agricultural raw materials)
 Code Call H2020-SC5-2016-TwoStage
 Funding Scheme IA
 Starting year 2017
 Duration (year-month-day) from 2017-06-01   to  2021-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    Teknologian tutkimuskeskus VTT Oy FI (Espoo) coordinator 1˙899˙900.00
2    OREXPLORE AB SE (KISTA) participant 1˙271˙462.00
3    SVERIGES GEOLOGISKA UNDERSOKNING SE (UPPSALA) participant 795˙625.00
4    HELLAS GOLD S.A. EL (ATHENS) participant 691˙096.00
5    LOVISAGRUVAN AB SE (STORA) participant 638˙260.00
6    ADVACAM OY FI (ESPOO) participant 601˙475.00
7    ADVACAM SRO CZ (PRAHA 7) participant 558˙250.00
8    ASAREL MEDET AD BG (PANAGYURISHTE) participant 557˙156.00
9    COMEX POLSKA SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA PL (KRAKOW) participant 553˙752.00
10    HELLENIC COPPER MINES LIMITED CY (NICOSIA) participant 477˙750.00
11    ANTMICRO SP ZOO PL (POZNAN) participant 470˙750.00
12    UPPSALA UNIVERSITET SE (UPPSALA) participant 326˙875.00
13    INSTITUTUL GEOLOGIC AL ROMANIEI RO (Bucharest) participant 251˙845.00
14    BERGSKRAFT BERGSLAGEN AB SE (KUMLA) participant 224˙000.00
15    SWICK MINING SERVICES LTD AU (PERTH) participant 0.00

Map

 Project objective

The X-MINE project supports better resource characterization and estimation as well as more efficient ore extraction in existing mine operations, making the mining of smaller and complex deposits economically feasible and increasing potential European mineral resources (specifically in the context of critical raw materials) without generating adverse environmental impact. The project will implement large-scale demonstrators of novel sensing technologies improving the efficiency and sustainability of mining operations based on X-Ray Fluorescence (XRF), X-Ray Transmission (XRT) technologies, 3D vision and their integration with mineral sorting equipment and mine planning software systems. The project will deploy these technologies in 4 existing mining operations in Sweden, Greece, Bulgaria and Cyprus. The sites have been chosen to illustrate different sizes (from small-scale to large-scale) and different target minerals (zinc-lead-silver-gold, copper-gold, gold) including the presence of associated critical metals such as indium, gallium, germanium, platinum group metals and rare earth elements. The pilots will be evaluated in the context of scientific, technical, socio-economic, lifecycle, health and safety performances. The sensing technologies developed in the project will improve exploration and extraction efficiency, resulting in less blasting required for mining. The technologies will also enable more efficient and automated mineral-selectivity at extraction stage, improving ore pre-concentration options and resulting in lower use of energy, water, chemicals and men hours (worker exposure) during downstream processing. The consortium includes 6 industrial suppliers, 4 research/academic organizations, 4 mining companies and 1 mining association. The project has a duration of 45 months and a requested EC contribution of €9.3M.

 Deliverables

List of deliverables.
Mineral-sorting algorithm test report - existing sensors Documents, reports 2020-02-14 11:40:18
Test report of on-line sensor performance Documents, reports 2020-02-14 11:40:18
Sensor data specifications Documents, reports 2020-02-14 11:40:18
Dissemination progress update M12 Documents, reports 2020-02-14 11:40:18
External project website Websites, patent fillings, videos etc. 2020-02-14 11:40:18
Sorting research prototype ready for mineral testing Demonstrators, pilots, prototypes 2020-02-14 11:40:17
3D sensor test report Documents, reports 2020-02-14 11:40:18

Take a look to the deliverables list in detail:  detailed list of X-MINE deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Gilljam Päärt, Oscar
Petrophysic of the Host-rock to the Ore in the Lovisa Mine, Bergslagen
published pages: 50, ISSN: , DOI:
Bachelor Programme in Earth Science/Independent Project at the Department of Earth Sciences 2018:26 2020-02-14
2018 Cioaca Mihaela-Elena, Ivanov Desislav, Iorga-Pavel Adina, Stoilov Ventsislav, Milu Viorica, Barbu Oana, Bîrgăoanu Daniel, Costin Gelu, Edward P. Lynch, Munteanu Marian
Au-Ag-Bi mineralization at the Assarel porphyry copper deposit (Srednogorie metallogenic zone, Bulgaria)
published pages: , ISSN: , DOI:
Advances of Geology in southeast European mountain belts 276 2020-02-14
2018 S. Polansky, D. Doubravova, J. Jakubek, M. Jakubek, P. Soukup, D. Turecek
High-sensitivity on-line imaging analysis of mining ore extraction by X-ray multichannel transmission radiography
published pages: , ISSN: , DOI:
2020-02-14

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "X-MINE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "X-MINE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.3.)

CEWASTE (2018)

Voluntary certification scheme for waste treatment

Read More  

TARANTULA (2019)

Recovery of Tungsten, Niobium and Tantalum occurring as by-products in mining and processing waste streams

Read More  

RE-SOURCING (2019)

Global Stakeholder Platform for Responsible Sourcing

Read More