Opendata, web and dolomites

PEA SIGNED

aluminium Portable Element Analyzer

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PEA project word cloud

Explore the words cloud of the PEA project. It provides you a very rough idea of what is the project "PEA" about.

line    ofounded    century    company    precisely    redefining    ton    commercialization    cooperation    plan    yearly    indicates    69    perform    iceland    intensive    worker    dte    efficiency    innovation    tinto    founded    full    secondary    limits    experts    engineering    maximized    2013    meets    reykjav    repeatability    21    adjust    optimum    2020    close    global    constantly    chemical    generating    thinking    units    aluminum    safe    accumulated    consolidated    strategic    analytical    savings    business    box    13    environmental    solutions    customer    synergy    grow    accuracy    customers    optimal    energy    instrumentation    creative    industrialization    producers    university    positions    aluminium    lease    molten    rio    alcoa    team    cryolite    iacute    revolutionary    philosophy    primary    generation    sell    sme    profit    entire    reykjavik    center    extremely    profitability    safety    demand    million    regarding    84    seeking    industry    quality    pea    sustainably    performance    community    2025    committed    time    23    outside    limitations   

Project "PEA" data sheet

The following table provides information about the project.

Coordinator
DT EQUIPMENT EHF 

Organization address
address: ARLEYNI 8
city: REYKJAVIK
postcode: 112
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Iceland [IS]
 Project website https://www.pea-project.eu/
 Total cost 2˙007˙812 €
 EC max contribution 1˙405˙468 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DT EQUIPMENT EHF IS (REYKJAVIK) coordinator 1˙405˙468.00

Map

 Project objective

Founded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development oFounded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development of high technology equipment and systems for process and quality control in the aluminium industry. We have maximized the synergy between our team of experts and the aluminium sector through close cooperation with end users – global producers of primary aluminium Century Aluminum, Alcoa and Rio Tinto – and strategic collaboration with the research and engineering community – such as Reykjavik University and the Innovation Center Iceland. To sustainably grow, we are committed in redefining problems to opportunities and providing creative solutions to our customers by thinking outside the box. Our philosophy: safe, reliable and high performance equipment that meets the customer's demand. Our project, PEA, is based on the industrialization and commercialization of the next generation of process analytical instrumentation: Capable to perform in-line real-time chemical analyses of molten aluminium and cryolite with optimum accuracy and repeatability, PEA allows to precisely adjust the process parameters to their optimal limits. Our plan is to offer our PEA systems to primary and secondary aluminium producers, who are constantly seeking solutions regarding process efficiency, operating costs, worker safety and environmental impact. Our revolutionary technology is set to change the entire industry, as it addresses the current limitations of a process known to be extremely energy intensive. Furthermore, while leading to long-term profitability for our customers, with potential yearly savings of €13.6 per produced ton of aluminium, our consolidated business plan indicates that we will lease and sell 84 system units from 2020-2025, generating €20.69 million of accumulated profit and creating 21-23 full-time positions in our company.

 Deliverables

List of deliverables.
Project website Websites, patent fillings, videos etc. 2019-08-29 13:30:36

Take a look to the deliverables list in detail:  detailed list of PEA deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PEA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PEA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More  

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More