Opendata, web and dolomites

PEA SIGNED

aluminium Portable Element Analyzer

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PEA project word cloud

Explore the words cloud of the PEA project. It provides you a very rough idea of what is the project "PEA" about.

global    energy    tinto    84    redefining    experts    seeking    line    analytical    time    69    2020    repeatability    adjust    plan    limitations    profit    safe    2025    close    industrialization    indicates    optimum    intensive    iacute    alcoa    demand    ton    million    entire    sme    13    committed    strategic    meets    chemical    aluminum    grow    cryolite    engineering    business    iceland    limits    environmental    quality    thinking    positions    customers    aluminium    cooperation    industry    2013    extremely    box    pea    customer    rio    perform    instrumentation    generation    worker    performance    maximized    consolidated    lease    university    commercialization    efficiency    philosophy    sell    team    company    accumulated    dte    ofounded    reykjavik    solutions    yearly    generating    century    innovation    reykjav    optimal    safety    full    profitability    primary    secondary    constantly    creative    regarding    revolutionary    units    23    outside    accuracy    founded    center    synergy    community    savings    sustainably    precisely    producers    21    molten   

Project "PEA" data sheet

The following table provides information about the project.

Coordinator
DT EQUIPMENT EHF 

Organization address
address: ARLEYNI 8
city: REYKJAVIK
postcode: 112
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Iceland [IS]
 Project website https://www.pea-project.eu/
 Total cost 2˙007˙812 €
 EC max contribution 1˙405˙468 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DT EQUIPMENT EHF IS (REYKJAVIK) coordinator 1˙405˙468.00

Map

 Project objective

Founded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development oFounded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development of high technology equipment and systems for process and quality control in the aluminium industry. We have maximized the synergy between our team of experts and the aluminium sector through close cooperation with end users – global producers of primary aluminium Century Aluminum, Alcoa and Rio Tinto – and strategic collaboration with the research and engineering community – such as Reykjavik University and the Innovation Center Iceland. To sustainably grow, we are committed in redefining problems to opportunities and providing creative solutions to our customers by thinking outside the box. Our philosophy: safe, reliable and high performance equipment that meets the customer's demand. Our project, PEA, is based on the industrialization and commercialization of the next generation of process analytical instrumentation: Capable to perform in-line real-time chemical analyses of molten aluminium and cryolite with optimum accuracy and repeatability, PEA allows to precisely adjust the process parameters to their optimal limits. Our plan is to offer our PEA systems to primary and secondary aluminium producers, who are constantly seeking solutions regarding process efficiency, operating costs, worker safety and environmental impact. Our revolutionary technology is set to change the entire industry, as it addresses the current limitations of a process known to be extremely energy intensive. Furthermore, while leading to long-term profitability for our customers, with potential yearly savings of €13.6 per produced ton of aluminium, our consolidated business plan indicates that we will lease and sell 84 system units from 2020-2025, generating €20.69 million of accumulated profit and creating 21-23 full-time positions in our company.

 Deliverables

List of deliverables.
Project website Websites, patent fillings, videos etc. 2019-08-29 13:30:36

Take a look to the deliverables list in detail:  detailed list of PEA deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PEA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PEA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

RoboSynFarm (2019)

Robotic Synthesis Farm

Read More