Opendata, web and dolomites

PEA SIGNED

aluminium Portable Element Analyzer

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PEA project word cloud

Explore the words cloud of the PEA project. It provides you a very rough idea of what is the project "PEA" about.

ofounded    customers    safe    million    environmental    optimum    redefining    solutions    cooperation    team    committed    generating    sustainably    philosophy    adjust    lease    pea    aluminium    company    69    innovation    engineering    customer    entire    close    analytical    profit    13    outside    ton    intensive    performance    commercialization    reykjav    chemical    constantly    21    business    sme    profitability    limitations    2025    iacute    aluminum    demand    accumulated    primary    grow    efficiency    industrialization    extremely    meets    reykjavik    molten    consolidated    84    instrumentation    quality    limits    founded    full    revolutionary    seeking    community    indicates    2020    cryolite    creative    positions    regarding    iceland    rio    energy    experts    repeatability    center    synergy    dte    accuracy    industry    plan    tinto    optimal    alcoa    global    thinking    23    time    yearly    units    century    strategic    precisely    producers    sell    secondary    savings    safety    2013    maximized    box    generation    line    perform    worker    university   

Project "PEA" data sheet

The following table provides information about the project.

Coordinator
DT EQUIPMENT EHF 

Organization address
address: ARLEYNI 8
city: REYKJAVIK
postcode: 112
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Iceland [IS]
 Project website https://www.pea-project.eu/
 Total cost 2˙007˙812 €
 EC max contribution 1˙405˙468 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DT EQUIPMENT EHF IS (REYKJAVIK) coordinator 1˙405˙468.00

Map

 Project objective

Founded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development oFounded in 2013 in Reykjavík (Iceland), our company DTE is an innovation-driven European SME dedicated to the development of high technology equipment and systems for process and quality control in the aluminium industry. We have maximized the synergy between our team of experts and the aluminium sector through close cooperation with end users – global producers of primary aluminium Century Aluminum, Alcoa and Rio Tinto – and strategic collaboration with the research and engineering community – such as Reykjavik University and the Innovation Center Iceland. To sustainably grow, we are committed in redefining problems to opportunities and providing creative solutions to our customers by thinking outside the box. Our philosophy: safe, reliable and high performance equipment that meets the customer's demand. Our project, PEA, is based on the industrialization and commercialization of the next generation of process analytical instrumentation: Capable to perform in-line real-time chemical analyses of molten aluminium and cryolite with optimum accuracy and repeatability, PEA allows to precisely adjust the process parameters to their optimal limits. Our plan is to offer our PEA systems to primary and secondary aluminium producers, who are constantly seeking solutions regarding process efficiency, operating costs, worker safety and environmental impact. Our revolutionary technology is set to change the entire industry, as it addresses the current limitations of a process known to be extremely energy intensive. Furthermore, while leading to long-term profitability for our customers, with potential yearly savings of €13.6 per produced ton of aluminium, our consolidated business plan indicates that we will lease and sell 84 system units from 2020-2025, generating €20.69 million of accumulated profit and creating 21-23 full-time positions in our company.

 Deliverables

List of deliverables.
Project website Websites, patent fillings, videos etc. 2019-08-29 13:30:36

Take a look to the deliverables list in detail:  detailed list of PEA deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PEA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PEA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

PRIVATETRACK (2019)

PRIVATETRACK: Privacy-friendly, low-power intelligent room occupancy detection and people counting.

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More