Opendata, web and dolomites

SULTAN SIGNED

European Training Network for the remediation and reprocessing of sulfidic mining waste sites

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SULTAN project word cloud

Explore the words cloud of the SULTAN project. It provides you a very rough idea of what is the project "SULTAN" about.

discarding    extractive    cements    eit    cu    green    reprocessing    careers    esrs    rawmaterials    develops    resource    contain    intersectoral    skilled    hazard    wp6    provides    professionals    opportunity    launched    pb    valorises    metal    companies    ups    recovers    zn    raw    tailing    transform    eip    etn    additionally    ed    wp4    wp3    ceramics    clean    chemicals    mitigate    edge    estimates    world    circular    29    chemical    families    explores    mining    maximise    talent    members    skills    surveys    chain    output    benefit    force    training    kick    inorganic    polymers    incl    sites    public    expertise    scientific    shortage    drainage    teaching    mine    poorly    starts    materials    interdisciplinary    first    remediation    economy    sulfidic    wp1    arms    environmental    28    extraction    geological    economically    valuable    tailings    pose    risks    methodology    15    suggest    managed    residues    bodies    prone    wp2    acute    warned    employable    recover    cutting    metals    wp5    waste    acid    for    sultan    industries    recovery    pooled    soft    links    eco   

Project "SULTAN" data sheet

The following table provides information about the project.

Coordinator
KATHOLIEKE UNIVERSITEIT LEUVEN 

Organization address
address: OUDE MARKT 13
city: LEUVEN
postcode: 3000
website: www.kuleuven.be

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Belgium [BE]
 Total cost 3˙910˙958 €
 EC max contribution 3˙910˙958 € (100%)
 Programme 1. H2020-EU.1.3.1. (Fostering new skills by means of excellent initial training of researchers)
 Code Call H2020-MSCA-ITN-2018
 Funding Scheme MSCA-ITN-ETN
 Starting year 2018
 Duration (year-month-day) from 2018-09-01   to  2022-08-31

 Partnership

Take a look of project's partnership.

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

For more than 100 years the EU mining industries have been discarding their extractive-waste residues. Estimates suggest this represents 29% of the EU-28’s current waste output. When poorly managed these residues are a significant environmental hazard. Sulfidic Cu-Zn, Zn-Pb and Cu-Zn-Pb tailings pose the largest challenge, as they are prone to acid mine drainage. However, these tailings also contain valuable metals. Recently, the EIP Raw Materials launched a “call to arms” to transform the “extractive-waste problem” into a “resource-recovery opportunity”. Additionally, the EIP has warned about the acute shortage of talent in this sector. In order to develop a highly skilled work force, to mitigate environmental risks and to economically recover valuable raw materials, the ETN for the remediation and reprocessing of sulfidic mining waste sites (SULTAN) provides the first-ever training programme dedicated to the reprocessing of tailings. SULTAN has pooled the interdisciplinary and intersectoral expertise of leading EIT RawMaterials members, world-leading mining and chemical companies, covering all links in the tailings-reprocessing value chain. SULTAN develops cutting-edge methodologies to assess the resource potential of Europe’s main tailings families (WP1) and explores eco-friendly mining chemicals for advanced metal-extraction/recovery set-ups (WP2). SULTAN not only recovers the metals but also valorises the clean(ed) tailing residues in circular-economy applications, incl. inorganic polymers, green cements and ceramics (WP3). In WP4 a novel environmental assessment methodology is developed. The 15 SULTAN ESRs benefit from a unique soft-skills training programme (WP5) and maximise the impact of their research through dissemination & exploitation (WP6). This kick-starts their careers as highly employable professionals in the EU’s tailings reprocessing/remediation sector, as well as for geological surveys, teaching and scientific organisations, and public bodies.

 Deliverables

List of deliverables.
Project animation video 1 Websites, patent fillings, videos etc. 2019-11-25 12:36:36
Website (external part) Websites, patent fillings, videos etc. 2019-11-08 11:14:29

Take a look to the deliverables list in detail:  detailed list of SULTAN deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SULTAN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SULTAN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.1.3.1.)

Shape-IT (2019)

Supporting the interaction of Humans and Automated vehicles: Preparing for the EnvIronment of Tomorrow

Read More  

EVIDENCE (2020)

Erythrocytes properties and viability in dependence of flow and extra-cellular environment

Read More  

ORBITAL (2019)

Ocular Research By Integrated Training And Learning

Read More