Opendata, web and dolomites

PNR SIGNED

OPTIMISATION, OPERATIONAL ENVIRONMENT TESTING AND APPROVAL FOR USE OF NOZZLE RRZ IN HIGHWAY TUNNELS AS AN ACTIVE FIREFIGHTING SYSTEM

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PNR project word cloud

Explore the words cloud of the PNR project. It provides you a very rough idea of what is the project "PNR" about.

fighting    44    ph2    hotter    130    size    5m    generate    market    fires    construction    longer    delay    players    44m    resistant    insufficient    move    billion    feasibility    operations    indicated    cover    hence    rrz    finalise    materials    2016    1755mj    jobs    active    fire    102mj    water    post    000oc    126    injuries    spread    last    energy    area    litres    fast    capacity    installation    caused    rescue    highway    damage    create    hospitalized    protected    ph1    validation    hours    boost    bars    1620    larger    slow    demonstration    temperatures    grow    italy    79    company    consumption    53    cagr    difficult    36    people    first    commercial    spray    drop    minute    tests    coverage    economy    according    tunnel    meters    3100    nozzle    commercialisation    jet    financial    prompt    tunnels    160bars    rail    budget    conduct    validations    industry    24    italian    investment    pnr    asymp    34    turnover    seek    500microns    pressure       adoption    protection    normal    extinguishment    initiate    lpm    2022    reduce    incidents    validate    tend    passive    pace    severe   

Project "PNR" data sheet

The following table provides information about the project.

Coordinator
P N R ITALIA SRL 

Organization address
address: VIA L GANDINI 2
city: VOGHERA PV
postcode: 27058
website: www.pnr.eu

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.pnr.eu/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    P N R ITALIA SRL IT (VOGHERA PV) coordinator 50˙000.00

Map

 Project objective

According to the European Commission, 70,000 people are hospitalized due to severe injuries caused by fire with an estimated damage of €126.3 billion every year. Highway tunnels are currently protected by passive fire systems such as fire-resistant construction materials that slow down the spread of a fire. However, this can be insufficient during major fires hence need for active fire protection systems. The analysis of fire incidents has indicated that fires in tunnels tend to be hotter with temperatures over 1,000oC, last longer even up to 53 hours making rescue operations and fire extinguishment more difficult. The Fire Protection System Market is growing at a fast pace, expected to grow from €44.36 billion in 2016 to €79.44 billion in 2022, at a CAGR of 9.7%. PNR is an Italian company company with 50 years’ experience in the fire protection industry. PNR has developed Nozzle RRZ, a tunnel fire fighting nozzle that can produce a high capacity jet at 130 litres per minute (lpm) with a 6 meters spray coverage operating at normal installation level. Nozzle RRZ will reduce energy consumption in fire fighting in tunnels by ≈1620%, from 1755MJ to 102MJ; reduce operating pressure by ≈3100%, from current 60 -160bars to 2-5 bars; improve water economy and fire delay due to wide drop size range of 50 – 500microns and larger spray area cover. Through this PH1 we seek to validate the technical, commercial and financial feasibility of Nozzle RRZ. Post validation of the project feasibility we will move on to the PH2 through which we seek to finalise the technical developments of Nozzle RRZ, conduct demonstration and validations tests to prompt industry adoption and initiate commercial adoption by players in highway tunnels and rail tunnels. Making use of a PH2 budget of €1.5m and post project investment of €0.5m to bring Nozzle RRZ to market we will boost our turnover and generate €34.44m in our first five years of commercialisation and create 24 new jobs at PNR Italy.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PNR" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PNR" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More