Opendata, web and dolomites

PNR SIGNED

OPTIMISATION, OPERATIONAL ENVIRONMENT TESTING AND APPROVAL FOR USE OF NOZZLE RRZ IN HIGHWAY TUNNELS AS AN ACTIVE FIREFIGHTING SYSTEM

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PNR project word cloud

Explore the words cloud of the PNR project. It provides you a very rough idea of what is the project "PNR" about.

53    longer    initiate    grow    market    create    litres    rescue    injuries    nozzle    italy    industry    according    coverage    36    fires    000oc    slow    consumption    2022    rail    tests    active    generate    conduct    hence    44m    rrz    fighting    protected    resistant    extinguishment    larger    insufficient    pnr    billion    asymp    tunnel    hospitalized    bars    highway    difficult    cagr    finalise    160bars    materials    pressure    protection    meters    boost    lpm    demonstration    financial    italian    validate    company    installation    passive    tunnels    130    adoption    79    severe    commercial    people    investment    ph2    indicated    spray    construction    1755mj    hotter    5m    players    spread    operations    44    fast    jobs    seek    incidents    size    feasibility    energy    tend    economy    turnover    pace    cover    ph1    minute    validations    126    post    fire    1620    normal    102mj    first    delay    caused    jet    area    water    last    reduce       24    capacity    temperatures    drop    2016    34    commercialisation    hours    prompt    validation    damage    budget    500microns    move    3100   

Project "PNR" data sheet

The following table provides information about the project.

Coordinator
P N R ITALIA SRL 

Organization address
address: VIA L GANDINI 2
city: VOGHERA PV
postcode: 27058
website: www.pnr.eu

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.pnr.eu/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    P N R ITALIA SRL IT (VOGHERA PV) coordinator 50˙000.00

Map

 Project objective

According to the European Commission, 70,000 people are hospitalized due to severe injuries caused by fire with an estimated damage of €126.3 billion every year. Highway tunnels are currently protected by passive fire systems such as fire-resistant construction materials that slow down the spread of a fire. However, this can be insufficient during major fires hence need for active fire protection systems. The analysis of fire incidents has indicated that fires in tunnels tend to be hotter with temperatures over 1,000oC, last longer even up to 53 hours making rescue operations and fire extinguishment more difficult. The Fire Protection System Market is growing at a fast pace, expected to grow from €44.36 billion in 2016 to €79.44 billion in 2022, at a CAGR of 9.7%. PNR is an Italian company company with 50 years’ experience in the fire protection industry. PNR has developed Nozzle RRZ, a tunnel fire fighting nozzle that can produce a high capacity jet at 130 litres per minute (lpm) with a 6 meters spray coverage operating at normal installation level. Nozzle RRZ will reduce energy consumption in fire fighting in tunnels by ≈1620%, from 1755MJ to 102MJ; reduce operating pressure by ≈3100%, from current 60 -160bars to 2-5 bars; improve water economy and fire delay due to wide drop size range of 50 – 500microns and larger spray area cover. Through this PH1 we seek to validate the technical, commercial and financial feasibility of Nozzle RRZ. Post validation of the project feasibility we will move on to the PH2 through which we seek to finalise the technical developments of Nozzle RRZ, conduct demonstration and validations tests to prompt industry adoption and initiate commercial adoption by players in highway tunnels and rail tunnels. Making use of a PH2 budget of €1.5m and post project investment of €0.5m to bring Nozzle RRZ to market we will boost our turnover and generate €34.44m in our first five years of commercialisation and create 24 new jobs at PNR Italy.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PNR" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PNR" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

MindTrack (2019)

Analysis of eye vergence responses for the early detection and monitoring of cognitive and mental disorders

Read More  

COPI (2020)

Carbon Offset Plug-in

Read More  

MACCO (2019)

Bring social robots into reality with the first real world leading bartender (MACCO)

Read More