Opendata, web and dolomites

PNR SIGNED

OPTIMISATION, OPERATIONAL ENVIRONMENT TESTING AND APPROVAL FOR USE OF NOZZLE RRZ IN HIGHWAY TUNNELS AS AN ACTIVE FIREFIGHTING SYSTEM

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PNR project word cloud

Explore the words cloud of the PNR project. It provides you a very rough idea of what is the project "PNR" about.

first    prompt    nozzle    litres    size    feasibility    24    jet    damage    delay    boost    water    44m       130    coverage    injuries    fires    longer    materials    validate    normal    severe    conduct    spray    adoption    indicated    consumption    jobs    79    protection    ph1    fast    caused    capacity    investment    commercial    hospitalized    cagr    move    players    according    160bars    post    lpm    fighting    meters    34    italian    protected    insufficient    drop    create    126    budget    2016    billion    minute    commercialisation    larger    pressure    rrz    bars    temperatures    102mj    slow    hence    rail    passive    fire    demonstration    last    construction    3100    tunnels    finalise    36    asymp    hotter    ph2    operations    resistant    1755mj    grow    pace    spread    incidents    validation    industry    highway    generate    economy    tests    53    500microns    energy    difficult    area    active    italy    extinguishment    market    rescue    pnr    hours    tend    tunnel    seek    cover    44    reduce    000oc    validations    financial    2022    initiate    people    company    5m    1620    installation    turnover   

Project "PNR" data sheet

The following table provides information about the project.

Coordinator
P N R ITALIA SRL 

Organization address
address: VIA L GANDINI 2
city: VOGHERA PV
postcode: 27058
website: www.pnr.eu

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.pnr.eu/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    P N R ITALIA SRL IT (VOGHERA PV) coordinator 50˙000.00

Map

 Project objective

According to the European Commission, 70,000 people are hospitalized due to severe injuries caused by fire with an estimated damage of €126.3 billion every year. Highway tunnels are currently protected by passive fire systems such as fire-resistant construction materials that slow down the spread of a fire. However, this can be insufficient during major fires hence need for active fire protection systems. The analysis of fire incidents has indicated that fires in tunnels tend to be hotter with temperatures over 1,000oC, last longer even up to 53 hours making rescue operations and fire extinguishment more difficult. The Fire Protection System Market is growing at a fast pace, expected to grow from €44.36 billion in 2016 to €79.44 billion in 2022, at a CAGR of 9.7%. PNR is an Italian company company with 50 years’ experience in the fire protection industry. PNR has developed Nozzle RRZ, a tunnel fire fighting nozzle that can produce a high capacity jet at 130 litres per minute (lpm) with a 6 meters spray coverage operating at normal installation level. Nozzle RRZ will reduce energy consumption in fire fighting in tunnels by ≈1620%, from 1755MJ to 102MJ; reduce operating pressure by ≈3100%, from current 60 -160bars to 2-5 bars; improve water economy and fire delay due to wide drop size range of 50 – 500microns and larger spray area cover. Through this PH1 we seek to validate the technical, commercial and financial feasibility of Nozzle RRZ. Post validation of the project feasibility we will move on to the PH2 through which we seek to finalise the technical developments of Nozzle RRZ, conduct demonstration and validations tests to prompt industry adoption and initiate commercial adoption by players in highway tunnels and rail tunnels. Making use of a PH2 budget of €1.5m and post project investment of €0.5m to bring Nozzle RRZ to market we will boost our turnover and generate €34.44m in our first five years of commercialisation and create 24 new jobs at PNR Italy.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PNR" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PNR" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

ALR4000 (2019)

Automated LCD Recycling series 4000

Read More  

Proteus 25 (2018)

Developing the world’s first food wrapping machine with organic film

Read More  

Preemie (2019)

Personalised nutrition of low-birth-weight infants

Read More