Opendata, web and dolomites

MaxiMem SIGNED

Dramatic hardware and energy savings in computer servers by doubling memory capacity and bandwidth using novel general-purpose compression

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 MaxiMem project word cloud

Explore the words cloud of the MaxiMem project. It provides you a very rough idea of what is the project "MaxiMem" about.

sme    time    storing    architecture    readily    50    university    internal    slow    gas    consumption    business       customer    commercialisation    technology    potentially    chip    2025    programs    net    tools    limited    manufacturers    simulate    greenhouse    25    return    memory    halving    32    speed    direct    created    installed    computer    155    chips    bottlenecks    unsustainable    executed    save    world    20    patented    layout    ours    rate    random    data    ebitda       hardware    ip    performance    2016    instrument    normally    ram    smartphones    consume    installation    electricity    cheaply    triple    capacity    costly    servers    densely    energy    reduce    maximem    participating    tablets    computers    emissions    socs    23    bandwidth    saving    innovations    decade    though    launch    block    supply    massive    server    solution    doubling    spinout    expenditure    centres    chalmers    amounts    market    realistically    transporting    total    zeropoint    compression    global    euroexa   

Project "MaxiMem" data sheet

The following table provides information about the project.

Coordinator
ZEROPOINT TECHNOLOGIES AB 

Organization address
address: FALKENBERGSGATAN 3
city: GOTEBORG
postcode: 412 85
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Total cost 1˙387˙462 €
 EC max contribution 971˙223 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2019
 Duration (year-month-day) from 2019-05-01   to  2021-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ZEROPOINT TECHNOLOGIES AB SE (GOTEBORG) coordinator 971˙223.00

Map

 Project objective

Technology and computer applications require the use of massive and growing amounts of data. Random Access Memory (RAM) has a direct impact on how many programs can be executed at the same time and how much data is readily available. Advanced applications may be limited by memory bottlenecks. More (effective) memory capacity is needed, more cheaply.

Data centres now consume 3% of the global electricity supply and account for 2% of total greenhouse gas emissions. This consumption is expected to triple in the next decade and may even reach 20% of the world’s energy in 2025. This is unsustainable.

MaxiMem is the solution. It is a patented compression technology that is capable of storing and transporting information in computer memory as densely as possible, doubling memory capacity, bandwidth, speed and performance and potentially halving current energy expenditure.

It is an IP block that can be installed on the System on Chips (SoCs) of servers, smartphones, tablets, computers and high-performance computers. Servers are our main (though not only) targets at market launch due to the sector growth and high cost saving potential. Server manufacturers could save up to 50% of memory costs and 25% of total hardware costs.

Chip innovations like ours are normally evaluated through installation of hardware or a layout design on a chip, which is costly and slow. ZeroPoint will use its experience to develop business-enabling tools to realistically simulate a chip implementation of our IP within the customer’s architecture. These tools will be crucial to bring our IP technology to market.

ZeroPoint was created in 2016 as a spinout from Chalmers University of Technology. We are now participating in the important EuroEXA project. SME Instrument support will greatly reduce our time-to-market of the MaxiMem project, which has an internal return rate of 155% (4 years), a Net Present Value of €32.3 in Year 4 of commercialisation, and an EBITDA the same year of €23.6 m.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MAXIMEM" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MAXIMEM" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Woodywood pickering (2019)

Bio-based (fully renewable) cost effective Polymer for new generation of ecological Coatings leveraging a disruptive innovation in the use of Pickering emulsion.

Read More  

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

DeltaQon (2019)

IOT and cloud computing for online medical analysis service platform

Read More