Progetti FP7 coordinati da "Union des industries ferroviaires europeennes - unife"

# progetto  anno  totale costo  contributi 
1 CLEANER-D Clean European Rail - Diesel 2009 12˙924˙840.00 7˙787˙411.00
2 DYNOTRAIN Railway Vehicle Dynamics and Track Interactions Total Regulatory Acceptance for the Interoperable Network 2009 5˙545˙222.00 3˙258˙795.00
3 PMNIDEA Predictive Maintenance employing Non-intrusive Inspection & Data Analysis 2009 4˙849˙576.00 3˙199˙725.00
4 PANTOTRAIN PANTOgraph and catenary interaction Total Regulatory Acceptance for the Interoperable Network 2009 3˙534˙166.00 2˙166˙370.00
5 AEROTRAIN AEROdynamics Total Regulatory Acceptance for the Interoperable Network 2009 4˙042˙239.00 2˙499˙998.00
6 EURAXLES EURAXLES: Minimizing the risk of fatigue failure of railway axles 2010 4˙721˙150.00 2˙899˙998.00
7 ACOUTRAIN Virtual certification of acoustic performance for freight and passenger trains 2011 3˙211˙175.00 2˙091˙220.00
8 EUREMCO European Railway Electromagnetic Compatibility 2011 3˙699˙809.00 2˙144˙829.00
9 OSIRIS Optimal Strategy to Innovate and Reduce energy consumption In urban rail Systems 2012 7˙390˙177.00 4˙299˙951.00
10 MERLIN Sustainable and intelligent management of energy for smarter railway systems in Europe: an integrated optimisation approach 2012 6˙948˙156.00 4˙499˙325.00
11 REFRESCO Towards a REgulatory FRamework for the usE of Structural new materials in railway passenger and freight CarbOdyshells 2013 4˙617˙321.00 2˙897˙359.00
12 NGTC Next Generation Train Control 2013 10˙927˙955.00 6˙361˙033.00

Altri progetti

L'Ente union des industries ferroviaires europeennes - unife partecipato anche in questi progetti.