Opendata, web and dolomites

GFF SIGNED

Green Fast Ferry - the world’s first 30 knots battery powered Air Supported commuter ferry

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GFF project word cloud

Explore the words cloud of the GFF project. It provides you a very rough idea of what is the project "GFF" about.

endurance    meet    components    craft    hull    port    documentation    300    gff    ferries    hours    emissions    prototype    cars    sheltered    recharge    alternative    emission    market    sea    prepare    routes    40    customers    reduce    pay    inland    pressurized    asv    substitution    reduces    purchased    waters    advantage    introduction    north    ferry    gt    speed    knots    conventional    tests    manufacturing    lt    zero    26    full    energy    commuters    electric    suitable    55    route    underneath    life    supports    stakeholders    diesel    driving    operation    city    patented    vessel    performances    revenues    ec    15    corresponding    air    commuting    restrictions    time    km    fast    32    500    roadshow    chain    demonstrated    baltic    green    autonomy    financial    subject    huge    erosions    thanks    economical    rest    passenger    engineer    min    wash    profit    tested    sweden    technologies    logged    wake    consumption    validate    covered    back    commercialization    cushion    allowed   

Project "GFF" data sheet

The following table provides information about the project.

Coordinator
ECHANDIA MARINE SWEDEN AB 

Organization address
address: PO BOX 30019
city: STOCKHOLM
postcode: 104 25
website: www.echandiamarine.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.bbgreen.info
 Total cost 1˙739˙375 €
 EC max contribution 1˙217˙562 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ECHANDIA MARINE SWEDEN AB SE (STOCKHOLM) coordinator 614˙862.00
2    SURFACE EFFECT SHIPS EUROPE AS NO (SANDEFJORD) participant 578˙637.00
3    BJB LV (RIGA) participant 24˙062.00

Map

 Project objective

The Green Fast Ferry (GFF) is a full-electric, high speed passenger craft, which will be the only zero emission ferry on the market to meet performances of high speed diesel commuters: 30 knots (55 km/h) speed, large autonomy (26 km routes in 30 min) and fast recharge at port < 20 min. GFF is based on a the patented technology Air Supported Vessel (ASV), that thanks to a pressurized air cushion underneath the hull, reduces energy consumption of > 40%. GFF is suitable for substitution of existing diesel commuters and introduction in sheltered waters and inland where conventional fast ferries are not allowed due to cost erosions, due to strongly reduce wake wash. GFF has a huge market potential in Emission Control Areas in EU (Baltic and North Sea). Objective of the project is to engineer, validate and demonstrate the GFF with potential customers and prepare it for the commercialization. In particular the prototype, developed within an EC funded European project and already tested in real scale, will be demonstrated through logged endurance tests (> 500 hours of operation) to get the technical documentation and engineer the components and manufacturing. The prototype will be demonstrated to the target stakeholders under real-life conditions through a “roadshow” in Sweden: one existing route and two potential high speed city commuting routes subject to speed restrictions due to wake wash problems. The operation of GFF will result in economical advantage of about 300 k€ per year to alternative diesel ferries, with a pay-back-time of 3 years, even less under financial supports. Each vessel will avoid consumption and emissions corresponding to 500 diesel cars each driving 15.000 km per year. The value chain is covered by the 3 partners, providing the key technologies and know-how, while the rest of components is purchased from the market. The overall revenues are estimated to reach 100 M€ after 5 years with a profit of 32 M€.

 Deliverables

List of deliverables.
Report on demonstration activities Documents, reports 2019-07-22 16:59:35

Take a look to the deliverables list in detail:  detailed list of GFF deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GFF" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GFF" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More