Opendata, web and dolomites

GFF SIGNED

Green Fast Ferry - the world’s first 30 knots battery powered Air Supported commuter ferry

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GFF project word cloud

Explore the words cloud of the GFF project. It provides you a very rough idea of what is the project "GFF" about.

introduction    gff    reduces    financial    life    sheltered    pressurized    purchased    ec    pay    waters    validate    26    40    routes    documentation    tests    hull    reduce    300    tested    vessel    performances    commercialization    emission    knots    passenger    speed    prototype    chain    market    ferries    patented    underneath    customers    profit    full    restrictions    emissions    operation    back    consumption    north    supports    components    endurance    commuting    thanks    economical    alternative    asv    conventional    recharge    covered    hours    erosions    suitable    advantage    ferry    sea    autonomy    km    wash    logged    stakeholders    driving    air    demonstrated    commuters    lt    green    sweden    corresponding    craft    technologies    prepare    allowed    engineer    huge    cushion    gt    city    wake    baltic    fast    zero    roadshow    port    energy    substitution    diesel    15    subject    32    500    rest    revenues    electric    manufacturing    meet    time    inland    route    min    55    cars   

Project "GFF" data sheet

The following table provides information about the project.

Coordinator
ECHANDIA MARINE SWEDEN AB 

Organization address
address: PO BOX 30019
city: STOCKHOLM
postcode: 104 25
website: www.echandiamarine.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.bbgreen.info
 Total cost 1˙739˙375 €
 EC max contribution 1˙217˙562 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ECHANDIA MARINE SWEDEN AB SE (STOCKHOLM) coordinator 614˙862.00
2    SURFACE EFFECT SHIPS EUROPE AS NO (SANDEFJORD) participant 578˙637.00
3    BJB LV (RIGA) participant 24˙062.00

Map

 Project objective

The Green Fast Ferry (GFF) is a full-electric, high speed passenger craft, which will be the only zero emission ferry on the market to meet performances of high speed diesel commuters: 30 knots (55 km/h) speed, large autonomy (26 km routes in 30 min) and fast recharge at port < 20 min. GFF is based on a the patented technology Air Supported Vessel (ASV), that thanks to a pressurized air cushion underneath the hull, reduces energy consumption of > 40%. GFF is suitable for substitution of existing diesel commuters and introduction in sheltered waters and inland where conventional fast ferries are not allowed due to cost erosions, due to strongly reduce wake wash. GFF has a huge market potential in Emission Control Areas in EU (Baltic and North Sea). Objective of the project is to engineer, validate and demonstrate the GFF with potential customers and prepare it for the commercialization. In particular the prototype, developed within an EC funded European project and already tested in real scale, will be demonstrated through logged endurance tests (> 500 hours of operation) to get the technical documentation and engineer the components and manufacturing. The prototype will be demonstrated to the target stakeholders under real-life conditions through a “roadshow” in Sweden: one existing route and two potential high speed city commuting routes subject to speed restrictions due to wake wash problems. The operation of GFF will result in economical advantage of about 300 k€ per year to alternative diesel ferries, with a pay-back-time of 3 years, even less under financial supports. Each vessel will avoid consumption and emissions corresponding to 500 diesel cars each driving 15.000 km per year. The value chain is covered by the 3 partners, providing the key technologies and know-how, while the rest of components is purchased from the market. The overall revenues are estimated to reach 100 M€ after 5 years with a profit of 32 M€.

 Deliverables

List of deliverables.
Report on demonstration activities Documents, reports 2019-07-22 16:59:35

Take a look to the deliverables list in detail:  detailed list of GFF deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GFF" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GFF" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

STYLUS (2017)

Sustainable urban mobiliTY: ELectric double decker bUS

Read More  

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More