Opendata, web and dolomites

tCat SIGNED

Disrupting the rail maintenance sector thanks to the most cost-efficient solution to auscultate railways overhead lines reducing costs up to 80%

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 tCat project word cloud

Explore the words cloud of the tCat project. It provides you a very rough idea of what is the project "tCat" about.

accurately    meters    npv    workstation    faster    prototype    total    on    lower    infrastructure    accounts    tcat    opex    14    innovative    savings    speed    drastically    12    expenses    2019    performed    perform    600    laser    site    bim    time    reducing    launch    demonstrated    automatically    walking    respectively    80    times    board    actions    competitiveness    reduce    created    profitability    2023    detect    payback    electrification    downtime    services    works    railways    investment    network    solutions    sensors    model    indicators    correlation    market    thanks    distance    inspections    10    25    spends    accuracy    captured    markets    operators    operations    saas    geometric    kilometre    jobs    predictive    irr    39    tested    usa    overhead    adif    installation    77    q4    rail    8m    competitors    models    eur    evaluation    company    maintenance    data    track    preventive    disruptive    38    solution    estimation    line    trolley    moved    integrates   

Project "tCat" data sheet

The following table provides information about the project.

Coordinator
TELEFONOS LINEAS Y CENTRALES SA 

Organization address
address: CALLE ANABEL SEGURA 11 EDIF A 3 PL
city: ALCOBENDAS
postcode: 28108
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.tcat.es
 Total cost 1˙948˙500 €
 EC max contribution 1˙363˙950 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TELEFONOS LINEAS Y CENTRALES SA ES (ALCOBENDAS) coordinator 1˙363˙950.00

Map

 Project objective

On average, the rail sector spends 39,600 EUR per kilometre of track on rail infrastructure maintenance, which accounts for 38% of total operating expenses. For the rail sector it is crucial to reduce OPEX costs to increase its competitiveness. tCat workstation is an innovative rail trolley that will contribute to drastically reduce maintenance costs related to overhead line equipment. tCat integrates, among other sensors, two laser distance meters (Competitors only use one laser) having lower and higher accuracy and being moved, in correlation, at respectively higher and lower speed. Thanks to its on-board technology tCat is able to automatically and accurately detect any overhead line elements and measure track geometric parameters. In addition, tCat allows on-site data processing including BIM predictive maintenance services offered through SaaS model and therefore immediate maintenance actions can be taken during walking inspections, which will reduce infrastructure downtime. As result, thanks to tCat the overhead line maintenance processes will be performed between 5 and 6 times faster reducing costs up to 80%. This makes tCat a disruptive and unique solution in terms of cost savings and preventive maintenance operations. In this project, the current prototype will be evolved and adapted to main markets and infrastructure characteristics. Evolved tCat models will be tested and demonstrated by some of the largest rail infrastructure operators in the EU and USA (Network Rail and ADIF). Our estimation is that 5 years after the launch of the product (estimated by Q4 of 2019) we will have captured about 12-14% of the EU market and 10% of USA market, becoming one of the main solutions used to perform installation, electrification and maintenance works in railways. Most important investment evaluation data are: By 2023, the company will have created more than 25 jobs and get profitability indicators as IRR 77%, NPV 2,8M€, payback time 3 years.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TCAT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TCAT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More  

SAFESEAT (2017)

SAFESEAT: the next generation, Smart Child Restraint Seat

Read More  

SPEED-EU (2018)

Damping device to solve the pantograph-line capture problems, especially for the EU high-speed railways lines

Read More