Opendata, web and dolomites

tCat SIGNED

Disrupting the rail maintenance sector thanks to the most cost-efficient solution to auscultate railways overhead lines reducing costs up to 80%

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 tCat project word cloud

Explore the words cloud of the tCat project. It provides you a very rough idea of what is the project "tCat" about.

services    eur    accurately    investment    operators    usa    12    tested    geometric    solutions    lower    actions    operations    faster    8m    reduce    on    q4    80    performed    accounts    14    reducing    rail    npv    payback    workstation    preventive    created    overhead    railways    speed    saas    solution    irr    predictive    infrastructure    market    trolley    39    kilometre    total    accuracy    600    works    company    meters    walking    2023    profitability    markets    network    automatically    innovative    disruptive    drastically    models    board    jobs    estimation    tcat    correlation    2019    captured    savings    track    times    spends    respectively    maintenance    thanks    line    opex    moved    indicators    expenses    prototype    10    25    downtime    77    laser    evaluation    model    demonstrated    sensors    time    electrification    launch    detect    site    data    inspections    installation    perform    distance    competitiveness    adif    integrates    bim    competitors    38   

Project "tCat" data sheet

The following table provides information about the project.

Coordinator
TELEFONOS LINEAS Y CENTRALES SA 

Organization address
address: CALLE ANABEL SEGURA 11 EDIF A 3 PL
city: ALCOBENDAS
postcode: 28108
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.tcat.es
 Total cost 1˙948˙500 €
 EC max contribution 1˙363˙950 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TELEFONOS LINEAS Y CENTRALES SA ES (ALCOBENDAS) coordinator 1˙363˙950.00

Map

 Project objective

On average, the rail sector spends 39,600 EUR per kilometre of track on rail infrastructure maintenance, which accounts for 38% of total operating expenses. For the rail sector it is crucial to reduce OPEX costs to increase its competitiveness. tCat workstation is an innovative rail trolley that will contribute to drastically reduce maintenance costs related to overhead line equipment. tCat integrates, among other sensors, two laser distance meters (Competitors only use one laser) having lower and higher accuracy and being moved, in correlation, at respectively higher and lower speed. Thanks to its on-board technology tCat is able to automatically and accurately detect any overhead line elements and measure track geometric parameters. In addition, tCat allows on-site data processing including BIM predictive maintenance services offered through SaaS model and therefore immediate maintenance actions can be taken during walking inspections, which will reduce infrastructure downtime. As result, thanks to tCat the overhead line maintenance processes will be performed between 5 and 6 times faster reducing costs up to 80%. This makes tCat a disruptive and unique solution in terms of cost savings and preventive maintenance operations. In this project, the current prototype will be evolved and adapted to main markets and infrastructure characteristics. Evolved tCat models will be tested and demonstrated by some of the largest rail infrastructure operators in the EU and USA (Network Rail and ADIF). Our estimation is that 5 years after the launch of the product (estimated by Q4 of 2019) we will have captured about 12-14% of the EU market and 10% of USA market, becoming one of the main solutions used to perform installation, electrification and maintenance works in railways. Most important investment evaluation data are: By 2023, the company will have created more than 25 jobs and get profitability indicators as IRR 77%, NPV 2,8M€, payback time 3 years.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TCAT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TCAT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

SAFECHILD (2016)

SAFECHILD: Innovative Safety System for Children Transported in Vehicles

Read More