Opendata, web and dolomites

z-BURN

Zero-Emission Catalytic Burner for heating in Electric and Hybrid Vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 z-BURN project word cloud

Explore the words cloud of the z-BURN project. It provides you a very rough idea of what is the project "z-BURN" about.

forecasts    monoxide    brand    94    78    burner    phevs    92    levels    easily    emissions    vs    normal    delivering    trl6    oems    reductions    offers    ab    first    hydrocarbon    60    fall    engines    market    fuel    delivers    pm    catalytic    sales    yrs    decrease    carbon    opportunity    insufficient    zero    global    evs    100    13    units    efficiency    heat    nox    63    validated    issue    solutions    emission    auxiliary    plan    climates    battery    innovation    270k    heating    regulations    trials    vehicle    forecast    pioneers    heavy    cabin    zemission    oem    shown    benefits    climate    burn    validate    popularity    successful    draw    waste    cover    32m    manufacturing    depleting    internal    acute    operated    cabins    either    km    mg    euro6    heaters    phev    37    centre    powered    suffer    audi    500k    electric    combustion    90    co    11    plug    temperatures    roi    6m    vehicles    geely    business    profits    degrees    cold    volvo    power    lynk    8m    cevt    suitability    18       appealing    hybrid   

Project "z-BURN" data sheet

The following table provides information about the project.

Coordinator
ZEMISSION AB 

Organization address
address: OLE ROMERS VAG 12
city: LUND
postcode: 223 70
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.zemission.se/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2017-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ZEMISSION AB SE (LUND) coordinator 50˙000.00

Map

 Project objective

The increasing popularity of Electric Vehicles (EVs) and Plug-in Hybrid Electric Vehicles (PHEVs) is creating a growing need for auxiliary cabin heaters since the waste heat typically used to heat cabins from Internal Combustion Engines is either not available or insufficient. The need for auxiliary heaters are particularly acute for cold climates - Studies have shown EVs in normal cold climate temperatures (-7 degrees C) suffer a range decrease of up to 60%. However, cabin heating is also a very important issue even in normal temperatures. Increasing sales of EVs and PHEVs are therefore creating a need for either fuel-operated or electric-powered auxiliary heaters. Current fuel-operated heaters are emission heavy and do not fall within current emissions regulations. Electric heaters draw power from the main battery, depleting vehicle range. We are Zemission AB, pioneers of a market leading catalytic combustion burner for heaters: ‘z-BURN’. z-BURN offers a market first, multi-fuel, zero-emission burner delivering up to 92% efficiency vs 78% of current solutions. z-BURN delivers 100% reductions of Hydrocarbon and Carbon Monoxide, 94.5% reduction of PM(0.11 mg/km) and 90% reduction of NOx(4.5 mg/km). These levels go far beyond current Euro6 regulations and will easily achieve future emissions regulations. Successful trials with Volvo and Audi have validated z-BURN at TRL6 and market suitability. Geely (Global Vehicle OEM) is interested in z-BURN for the new Lynk&Co brand PHEVs. With support from Geely’s Innovation Centre CEVT this opportunity will cover 270k units of our overall 500k unit PHEV forecast over 7-yrs. The benefits of Z-BURN are widely appealing to many OEMs for their PHEVs and eventually EVs. This Phase 1 project will help validate the z-BURN business case and fully define our manufacturing scale-up plan. 5-yr forecasts show: sales of €32m & profits of €18.8m, with ROI of 6.3:1. 7-yr forecasts show: sales of €63.8m & profits of €37.6m with ROI of 13.6:1.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "Z-BURN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "Z-BURN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

REFITT (2018)

Rare Earth Free Innovative Truck Traction

Read More  

SIRENA (2018)

Novel electric stair climber to break barriers in transport of disabled people and goods through a safe, quick and comfortable movement

Read More  

SAFESEAT (2017)

SAFESEAT: the next generation, Smart Child Restraint Seat

Read More