Opendata, web and dolomites

z-BURN

Zero-Emission Catalytic Burner for heating in Electric and Hybrid Vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 z-BURN project word cloud

Explore the words cloud of the z-BURN project. It provides you a very rough idea of what is the project "z-BURN" about.

heavy    acute    reductions    issue    catalytic    draw    operated    validated    carbon    60    centre    opportunity    oems    11    cabin    ab    insufficient    volvo    100    appealing    cold    co    forecasts    32m    validate    combustion    cover    suitability    euro6    phevs    temperatures    heat    8m    plug    levels    phev    roi    nox    zero    heating    mg    oem    climate    successful    monoxide    trl6    forecast    trials    climates    km       global    270k    first    6m    vs    delivering    delivers    63    depleting    auxiliary    emissions    waste    evs    regulations    90    zemission    92    decrease    78    shown    business    cevt    hydrocarbon    popularity    brand    heaters    manufacturing    innovation    easily    pm    solutions    internal    37    sales    profits    offers    market    vehicle    units    geely    pioneers    94    burner    power    audi    benefits    13    engines    electric    suffer    cabins    fuel    battery    efficiency    500k    18    emission    lynk    plan    normal    burn    vehicles    degrees    either    yrs    fall    powered    hybrid   

Project "z-BURN" data sheet

The following table provides information about the project.

Coordinator
ZEMISSION AB 

Organization address
address: OLE ROMERS VAG 12
city: LUND
postcode: 223 70
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.zemission.se/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2017-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ZEMISSION AB SE (LUND) coordinator 50˙000.00

Map

 Project objective

The increasing popularity of Electric Vehicles (EVs) and Plug-in Hybrid Electric Vehicles (PHEVs) is creating a growing need for auxiliary cabin heaters since the waste heat typically used to heat cabins from Internal Combustion Engines is either not available or insufficient. The need for auxiliary heaters are particularly acute for cold climates - Studies have shown EVs in normal cold climate temperatures (-7 degrees C) suffer a range decrease of up to 60%. However, cabin heating is also a very important issue even in normal temperatures. Increasing sales of EVs and PHEVs are therefore creating a need for either fuel-operated or electric-powered auxiliary heaters. Current fuel-operated heaters are emission heavy and do not fall within current emissions regulations. Electric heaters draw power from the main battery, depleting vehicle range. We are Zemission AB, pioneers of a market leading catalytic combustion burner for heaters: ‘z-BURN’. z-BURN offers a market first, multi-fuel, zero-emission burner delivering up to 92% efficiency vs 78% of current solutions. z-BURN delivers 100% reductions of Hydrocarbon and Carbon Monoxide, 94.5% reduction of PM(0.11 mg/km) and 90% reduction of NOx(4.5 mg/km). These levels go far beyond current Euro6 regulations and will easily achieve future emissions regulations. Successful trials with Volvo and Audi have validated z-BURN at TRL6 and market suitability. Geely (Global Vehicle OEM) is interested in z-BURN for the new Lynk&Co brand PHEVs. With support from Geely’s Innovation Centre CEVT this opportunity will cover 270k units of our overall 500k unit PHEV forecast over 7-yrs. The benefits of Z-BURN are widely appealing to many OEMs for their PHEVs and eventually EVs. This Phase 1 project will help validate the z-BURN business case and fully define our manufacturing scale-up plan. 5-yr forecasts show: sales of €32m & profits of €18.8m, with ROI of 6.3:1. 7-yr forecasts show: sales of €63.8m & profits of €37.6m with ROI of 13.6:1.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "Z-BURN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "Z-BURN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

WOOLF (2017)

An advanced and wearable solution to increase motorcyclists’ safety

Read More  

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

SAFESEAT (2017)

SAFESEAT: the next generation, Smart Child Restraint Seat

Read More