Opendata, web and dolomites

z-BURN

Zero-Emission Catalytic Burner for heating in Electric and Hybrid Vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 z-BURN project word cloud

Explore the words cloud of the z-BURN project. It provides you a very rough idea of what is the project "z-BURN" about.

hybrid    issue    power    validate    32m    trials    6m    zero    pioneers    climates    roi    carbon    global       delivering    catalytic    90    sales    zemission    temperatures    270k    phev    suffer    validated    first    heavy    oems    fall    draw    mg    decrease    volvo    units    hydrocarbon    60    successful    business    climate    powered    37    battery    profits    brand    nox    normal    vehicles    ab    94    8m    geely    63    operated    acute    easily    manufacturing    vehicle    km    vs    levels    cover    delivers    popularity    forecast    engines    combustion    cevt    cabins    500k    emissions    heaters    yrs    regulations    reductions    insufficient    internal    monoxide    offers    depleting    18    lynk    either    degrees    suitability    heat    cold    euro6    centre    waste    11    co    emission    market    appealing    solutions    electric    13    100    plan    phevs    shown    plug    pm    innovation    benefits    fuel    burn    efficiency    evs    opportunity    92    auxiliary    trl6    forecasts    78    heating    cabin    oem    burner    audi   

Project "z-BURN" data sheet

The following table provides information about the project.

Coordinator
ZEMISSION AB 

Organization address
address: OLE ROMERS VAG 12
city: LUND
postcode: 223 70
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.zemission.se/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2017-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ZEMISSION AB SE (LUND) coordinator 50˙000.00

Map

 Project objective

The increasing popularity of Electric Vehicles (EVs) and Plug-in Hybrid Electric Vehicles (PHEVs) is creating a growing need for auxiliary cabin heaters since the waste heat typically used to heat cabins from Internal Combustion Engines is either not available or insufficient. The need for auxiliary heaters are particularly acute for cold climates - Studies have shown EVs in normal cold climate temperatures (-7 degrees C) suffer a range decrease of up to 60%. However, cabin heating is also a very important issue even in normal temperatures. Increasing sales of EVs and PHEVs are therefore creating a need for either fuel-operated or electric-powered auxiliary heaters. Current fuel-operated heaters are emission heavy and do not fall within current emissions regulations. Electric heaters draw power from the main battery, depleting vehicle range. We are Zemission AB, pioneers of a market leading catalytic combustion burner for heaters: ‘z-BURN’. z-BURN offers a market first, multi-fuel, zero-emission burner delivering up to 92% efficiency vs 78% of current solutions. z-BURN delivers 100% reductions of Hydrocarbon and Carbon Monoxide, 94.5% reduction of PM(0.11 mg/km) and 90% reduction of NOx(4.5 mg/km). These levels go far beyond current Euro6 regulations and will easily achieve future emissions regulations. Successful trials with Volvo and Audi have validated z-BURN at TRL6 and market suitability. Geely (Global Vehicle OEM) is interested in z-BURN for the new Lynk&Co brand PHEVs. With support from Geely’s Innovation Centre CEVT this opportunity will cover 270k units of our overall 500k unit PHEV forecast over 7-yrs. The benefits of Z-BURN are widely appealing to many OEMs for their PHEVs and eventually EVs. This Phase 1 project will help validate the z-BURN business case and fully define our manufacturing scale-up plan. 5-yr forecasts show: sales of €32m & profits of €18.8m, with ROI of 6.3:1. 7-yr forecasts show: sales of €63.8m & profits of €37.6m with ROI of 13.6:1.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "Z-BURN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "Z-BURN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

GMP (2017)

Green Marine Propulsion

Read More