Opendata, web and dolomites

ELECTROU TERMINATED

MW Fuel Cell micro grid and district heating at King’s Cross

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ELECTROU project word cloud

Explore the words cloud of the ELECTROU project. It provides you a very rough idea of what is the project "ELECTROU" about.

re    full    plant    positively    electrou    form    regulations    scaling    carbon    deployment    times    buildings    prevented    install    micro    emissions    complexity    ventilation    site    decision    space    spatial    cooling    standards    extends    water    negligible    profile    fuel    near    public    power    market    prove    makers    mw    installed    stakeholders    cross    integration    grade    critical    influence    redevelopment    cell    networks    subsidy    simplified    heat    return    commercially    technologies    valid    safe    cells    efficiency    performed    designed    london    codes    electricity    route    efficient    building    multiple    promotes    campaign    grid    installations    kings    investors    benefits    egress    investment    modules    local    financiers    supporting    barriers    environmental    mature    massively    tech    emission    commercial    smaller    capital    indoor    entry    share    first    installation    capacity    break    outdoor   

Project "ELECTROU" data sheet

The following table provides information about the project.

Coordinator
METROPOLITAN KING'S CROSS LIMITED 

Organization address
address: DRISCOLL 2 ELLEN STREET
city: CARDIFF
postcode: CF10 4BP
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 10˙329˙628 €
 EC max contribution 6˙000˙000 € (58%)
 Programme 1. H2020-EU.3.3.8.1. (Increase the electrical efficiency and the durability of the different fuel cells used for power production to levels which can compete with conventional technologies, while reducing costs)
 Code Call H2020-JTI-FCH-2016-1
 Funding Scheme FCH2-IA
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2023-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    METROPOLITAN KING'S CROSS LIMITED UK (CARDIFF) coordinator 558˙427.00
2    FUELCELL ENERGY SOLUTIONS GMBH DE (DRESDEN) participant 4˙659˙385.00
3    FUEL CELL SYSTEMS LTD UK (HUNGERFORD) participant 374˙937.00
4    POLITECNICO DI MILANO IT (MILANO) participant 203˙750.00
5    UNIVERSITA DEGLI STUDI DI PERUGIA IT (PERUGIA) participant 112˙500.00
6    BUUK INFRASTRUCTURE NO 2 LIMITED UK (BURY ST EDMUNDS) participant 91˙000.00

Map

 Project objective

ELECTROU will install the first MW fuel cell in Europe fully integrated into a building at the high profile redevelopment at Kings Cross, London. This includes the full use of power & heat generated by the fuel cell within the local building, the site wide heat, power and cooling networks, and extends to water re-use and support of the micro grid.

ELECTROU will prove that the multi-MW installation due to operational efficiency and negligible emissions will massively improve local and EU wide carbon emission targets. Designed to be an outdoor installation the plant will be adapted to indoor requirements e.g. space, ventilation, and safe access and egress. Up-scaling more than 3 times the installed capacity compared to current indoor installations is a critical step for large scale deployment within building applications.

The use of fuel cells in this critical sector is currently prevented due to the high spatial requirements of multiple smaller modules, high capital cost compared to other technologies, and complexity of integration. ELECTROU will break all of these barriers. The project will demonstrate to key decision makers, investors and financiers that there is a near term route to produce electricity and heat in a highly efficient way by a technology which is commercially viable today.

ELECTROU will prove through funding support that multi-MW installations within buildings can make an investment grade return without the need for any form of local or EU subsidy, this is a critical step in making the sector viable. A targeted dissemination campaign will be performed to share all of the results with stakeholders and the general public that promotes the technical, commercial and environmental benefits of this mature but high tech technology. We will develop one valid process for all fuel cell installations in Europe by supporting the set-up of simplified regulations, codes and standards that as a result will positively influence market entry throughout the EU.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ELECTROU" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ELECTROU" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.8.1.)

LOWCOST-IC (2019)

Low Cost Interconnects with highly improved Contact Strength for SOC Applications

Read More  

RUBY (2020)

Robust and reliable general management tool for performance and dUraBility improvement of fuel cell stationarY units

Read More  

RoRePower (2019)

Robust and Remote Power Supply

Read More