Explore the words cloud of the JIVE 2 project. It provides you a very rough idea of what is the project "JIVE 2" about.
The following table provides information about the project.
Coordinator |
ELEMENT ENERGY LIMITED
Organization address contact info |
Coordinator Country | United Kingdom [UK] |
Project website | https://www.fuelcellbuses.eu/ |
Total cost | 107˙398˙381 € |
EC max contribution | 25˙000˙000 € (23%) |
Programme |
1. H2020-EU.3.4.6.1. (Reduce the production cost of fuel cell systems to be used in transport applications, while increasing their lifetime to levels which can compete with conventional technologies) |
Code Call | H2020-JTI-FCH-2017-1 |
Funding Scheme | FCH2-IA |
Starting year | 2018 |
Duration (year-month-day) | from 2018-01-01 to 2023-12-31 |
Take a look of project's partnership.
The spotlight on health impacts of poor air quality and the renewed focus on reducing GHG emissions in recent years provide a strong impetus for cities to seek clean, low carbon transport solutions. When it comes to meeting growing demands for public transport and addressing environmental issues, hydrogen fuel cell (FC) buses offer significant potential.
A commercialisation process for FC buses is underway, through which a shared vision has been agreed between vehicle suppliers and their customers. This is based on reducing costs through scale via a phased approach of pre-commercial demonstrations that will provide the evidence for wider uptake of these vehicles in the 2020s.
The first step in upscaling FC bus deployment is underway through the JIVE project, which began in January 2017. JIVE 2 is its successor and is Europe’s most ambitious FC bus project to date: 152 buses in 14 cities across seven countries. JIVE 2 involves regions with experience of the technology scaling up fuel cell bus fleets (e.g. Cologne), and those seeking to build their knowledge and experience by demonstrating FC buses in small fleets for the first time (e.g. Auxerre, Gävleborg). All deployment locations in JIVE 2 share an ambition to increase the size of their FC bus fleets following successful initial demonstrations, hence the participating cities/regions will be natural locations for larger scale roll-out of the technology in the 2020s.
A comprehensive data monitoring and assessment exercise will capture the relevant evidence to inform next steps for the sector, and the project’s impacts will be maximised by a high-impact dissemination campaign. This will involve reaching wide audiences via various channels, including a series of international Zero Emission Bus Conferences.
The JIVE and JIVE 2 projects together will see the deployment and operation of nearly 300 FC buses in 22 European cities/regions, thus providing a sound basis for further development of this sector.
Operators’ guide to fuel cell bus deployment – version 1 | Documents, reports | 2020-04-24 05:45:06 |
Template documents for HRS consenting phase | Documents, reports | 2020-04-24 05:45:06 |
Website available | Websites, patent fillings, videos etc. | 2020-04-24 05:45:05 |
Log of European-wide fuel cell deployment plans (website based) | Websites, patent fillings, videos etc. | 2020-04-24 05:45:05 |
Performance Assessment Handbook | Documents, reports | 2020-04-24 05:45:05 |
Take a look to the deliverables list in detail: detailed list of JIVE 2 deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "JIVE 2" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "JIVE 2" are provided by the European Opendata Portal: CORDIS opendata.