Explore the words cloud of the BOOST 4.0 project. It provides you a very rough idea of what is the project "BOOST 4.0" about.
The following table provides information about the project.
Coordinator |
ASOCIACION DE EMPRESAS TECNOLOGICAS INNOVALIA
Organization address contact info |
Coordinator Country | Spain [ES] |
Total cost | 18˙675˙091 € |
EC max contribution | 14˙983˙516 € (80%) |
Programme |
1. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)) |
Code Call | H2020-ICT-2017-1 |
Funding Scheme | IA |
Starting year | 2018 |
Duration (year-month-day) | from 2018-01-01 to 2020-12-31 |
Take a look of project's partnership.
EFFRA recommendations on Factories 4.0 and Beyond (Sept 2016) clearly stated the need for development of large scale experimentation and demonstration of data-driven “connected smart” Factories 4.0, to retain European manufacturing competitiveness. BOOST 4.0 will address this need, by demonstrating in a measurable and replicable way, an open standardised and transformative shared data-driven Factory 4.0 model through 10 lighthouse factories. BOOST 4.0 will also demonstrate how European industry can build unique strategies and competitive advantages through big data across all phases of product and process lifecycle (engineering, planning, operation, production and after-market services) building upon the connected smart Factory 4.0 model to meet the Industry 4.0 challenges (lot size one distributed manufacturing, operation of zero defect processes & products, zero break down sustainable operations, agile customer-driven manufacturing value network management and human centred manufacturing). Our chief objectives include: (1) Establish 10 big data lighthouse smart connected factories (VW, FILL, AutoEuropa, GF, FIAT, Phillips, Volvo, GESTAMP, Benteler, Whirlpool). (2) Provide the RAMI 4.0 and IDS based BOOST 4.0 open EU framework and governance model, for both services and data assets. (3) Put together methodologies, assets, models and communities in order to maximise visibility, mobilization, replication potential, and impact (business, financial, standardization) of BOOST 4.0 The investment leveraging factor of BOOST 4.0 will be well above the 4:1 ratio, up to 10:1. In terms of exploitation, in 5-years horizon after the project end, just only the participating lighthouse factories will make a direct follow-on investment above 33Meuro (ROI 10,61), while the commercialisation of the BOOST 4.0 products in the market is expected to generate some 96Meuro cumulative profits (ROI 4,73) for the rest of the partners.
Annual communication plan and actions v1 | Documents, reports | 2020-03-19 15:48:40 |
Interim Progress Report V1 | Documents, reports | 2020-03-19 15:48:41 |
BOOST 4.0 standardization & certification v1 | Documents, reports | 2020-03-19 15:48:40 |
BOOST 4.0 Reference Architecture Specification v1 | Documents, reports | 2020-03-19 15:48:40 |
Project management plan and fact sheet | Documents, reports | 2020-03-19 15:48:41 |
Pilots description, adaptations and execution plans v1 | Documents, reports | 2020-03-19 15:48:41 |
Risk Management Plan v1 | Documents, reports | 2020-03-19 15:48:41 |
Big Data Models and Analytics Platform v1 | Other | 2020-03-19 15:48:40 |
Annual communication plan and actions v2 | Documents, reports | 2020-03-19 15:48:41 |
Pilot Requirements and Use Cases Specification v1 | Documents, reports | 2020-03-19 15:48:40 |
Risk Management Plan v2 | Documents, reports | 2020-03-19 15:48:41 |
Industrial Data Space v1 | Other | 2020-03-19 15:48:40 |
Annual demonstration plan and actions v1 | Documents, reports | 2020-03-19 15:48:41 |
Risk Management Plan v3 | Documents, reports | 2020-03-19 15:48:41 |
Take a look to the deliverables list in detail: detailed list of BOOST 4.0 deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2020 |
Roxana-Maria Holom, Katharina Rafetseder, Stefanie Kritzinger, Harald Sehrschön Metadata management in a big data infrastructure. published pages: , ISSN: , DOI: |
2020-03-19 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "BOOST 4.0" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "BOOST 4.0" are provided by the European Opendata Portal: CORDIS opendata.