Opendata, web and dolomites

Matrix Charging SIGNED

Matrix Charging: Novel, automated charging infrastructure for electric vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Matrix Charging project word cloud

Explore the words cloud of the Matrix Charging project. It provides you a very rough idea of what is the project "Matrix Charging" about.

refuelling    cities    inclusive    99    road    performance    stations    gross    primarily    hours    delivering    disadvantages    sustainable    investment    sales    global    automated    vehicle    grow    adverse    conductive    autonomous    market    competitor    moving    profit    though    innovations    life    q2    tend    matrix    energy    44m    8bn       whilst    innovation    individual    validated    driving    leadership    500    cs    electric    traffic    resistance    anxiety    attractive    15    ev    continuing    living    world    112    public    mobility    decarbonised    outside    evs    electro    times    period    920    transport    technologies    first    solution    charge    quality    arguments    vehicles    electrification    roi    reduce    direct    reg    batteries    2010    yr1    few    parts    transmission    forecasts    giving    slowing    people    bmw    lower    efficiency    disruptive    return    max    efficient    29    additional    met    nearest    sprawl    2018    urbanisation    revolutionize    cagr    density    semi    valid    24m    impacts    projected    surge    points    400    charging       demand    2022    30    fold    yr5    competitive    km    power    over    million    9m   

Project "Matrix Charging" data sheet

The following table provides information about the project.

Coordinator
EASE-LINK GMBH 

Organization address
address: MUNZGRABENSTRASSE 94
city: GRAZ
postcode: 8010
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website https://easelink.com/
 Total cost 2˙934˙062 €
 EC max contribution 2˙053˙843 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EASE-LINK GMBH AT (GRAZ) coordinator 2˙053˙843.00

Map

 Project objective

Over the next 15 years continuing growth of urbanisation & sprawl will increase the demand for individual mobility & the increase of traffic density will produce many adverse impacts that have direct effects on the quality of life for people living in cities. To lead Europe into a sustainable & competitive future, novel innovations are essential to increase transport efficiency. Vehicle electrification & autonomous driving are two promising new technologies that have disruptive potential for individual mobility whilst giving support “Towards an energy-efficient, decarbonised transport sector”. Sales of Electric Vehicles (EV) tend to be met with high resistance primarily due to range anxiety (max. 100-400 km), variable power costs & long refuelling times (5-8 hours to charge) thus slowing down leadership in electro-mobility. Though these arguments may be valid now, future batteries and charging stations (CS) will reduce these disadvantages. The EV market is projected to grow at a CAGR of 29% & 20 million EVs are going to be on the road by 2022. In 2010, public charging points for EVs were few. Today, there are 112,500 public or semi-public charging points in Europe and is expected to surge at CAGR of 29.8% and reach €10.8Bn global market by 2022.As EV’s become more autonomous there will be greater importance on automated charging. With Matrix Charging® we will have the potential to revolutionize automated EV charging by being the world’s first fully automated conductive charging technology that has no moving parts outside the vehicle. The key innovation is delivering the solution with 99% transmission efficiency, at 30% lower cost than nearest competitor and a 6-fold higher performance with 9% additional efficiency, as we validated with BMW. With a phase 2 cost of €2.9M in early Q2 2018 Matrix Charging® forecasts a €24M gross profit in Yr5 (€44M gross profit Yr1 to Yr5 inclusive period), with a return on investment (ROI) is a very attractive 920% (9.2).

 Deliverables

List of deliverables.
website area www.easelink.com Websites, patent fillings, videos etc. 2020-02-07 15:50:29

Take a look to the deliverables list in detail:  detailed list of Matrix Charging deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MATRIX CHARGING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MATRIX CHARGING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DNA DS (2019)

DNA Data storage

Read More  

LTS (2020)

LEARNING TO SLEEP: INCREASING HEALTH THROUGH BETTER SLEEP

Read More  

ERGOVIAkinematix (2018)

New wearable measurement devices for Industry 4.0 based on gaming motion-capture system

Read More