Opendata, web and dolomites

Matrix Charging SIGNED

Matrix Charging: Novel, automated charging infrastructure for electric vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Matrix Charging project word cloud

Explore the words cloud of the Matrix Charging project. It provides you a very rough idea of what is the project "Matrix Charging" about.

market    roi    autonomous    gross    batteries    density    million    life    projected    yr1    competitor    cs    disadvantages    primarily    points    impacts    400    additional    44m    continuing    transmission    giving       leadership    cities    whilst    power    2010    valid    nearest    living    fold    grow    performance    charging    profit    parts    few    decarbonised    innovation    2022    ev    2018    resistance    electro    112    energy    road    competitive    efficient    8bn    though    evs    forecasts    surge    24m    9m    public    stations    cagr    return    q2    km    demand    max    efficiency    hours    slowing    technologies    validated    reduce    electric    920    global    period    bmw    vehicles    quality    vehicle       solution    innovations    sales    electrification    500    mobility    tend    world    30    semi    arguments    inclusive    lower    anxiety    individual    outside    reg    driving    yr5    people    adverse    times    moving    investment    first    revolutionize    attractive    refuelling    over    29    disruptive    direct    delivering    99    15    met    conductive    sprawl    automated    transport    urbanisation    traffic    matrix    sustainable    charge   

Project "Matrix Charging" data sheet

The following table provides information about the project.

Coordinator
EASE-LINK GMBH 

Organization address
address: MUNZGRABENSTRASSE 94
city: GRAZ
postcode: 8010
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website https://easelink.com/
 Total cost 2˙934˙062 €
 EC max contribution 2˙053˙843 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EASE-LINK GMBH AT (GRAZ) coordinator 2˙053˙843.00

Map

 Project objective

Over the next 15 years continuing growth of urbanisation & sprawl will increase the demand for individual mobility & the increase of traffic density will produce many adverse impacts that have direct effects on the quality of life for people living in cities. To lead Europe into a sustainable & competitive future, novel innovations are essential to increase transport efficiency. Vehicle electrification & autonomous driving are two promising new technologies that have disruptive potential for individual mobility whilst giving support “Towards an energy-efficient, decarbonised transport sector”. Sales of Electric Vehicles (EV) tend to be met with high resistance primarily due to range anxiety (max. 100-400 km), variable power costs & long refuelling times (5-8 hours to charge) thus slowing down leadership in electro-mobility. Though these arguments may be valid now, future batteries and charging stations (CS) will reduce these disadvantages. The EV market is projected to grow at a CAGR of 29% & 20 million EVs are going to be on the road by 2022. In 2010, public charging points for EVs were few. Today, there are 112,500 public or semi-public charging points in Europe and is expected to surge at CAGR of 29.8% and reach €10.8Bn global market by 2022.As EV’s become more autonomous there will be greater importance on automated charging. With Matrix Charging® we will have the potential to revolutionize automated EV charging by being the world’s first fully automated conductive charging technology that has no moving parts outside the vehicle. The key innovation is delivering the solution with 99% transmission efficiency, at 30% lower cost than nearest competitor and a 6-fold higher performance with 9% additional efficiency, as we validated with BMW. With a phase 2 cost of €2.9M in early Q2 2018 Matrix Charging® forecasts a €24M gross profit in Yr5 (€44M gross profit Yr1 to Yr5 inclusive period), with a return on investment (ROI) is a very attractive 920% (9.2).

 Deliverables

List of deliverables.
website area www.easelink.com Websites, patent fillings, videos etc. 2020-02-07 15:50:29

Take a look to the deliverables list in detail:  detailed list of Matrix Charging deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MATRIX CHARGING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MATRIX CHARGING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

RoboSynFarm (2019)

Robotic Synthesis Farm

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More