Opendata, web and dolomites

Optium

Smart charger device to increase smartphones’ battery lifetime, prevent fire accidents, and provide cross-brand flexibility

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Optium project word cloud

Explore the words cloud of the Optium project. It provides you a very rough idea of what is the project "Optium" about.

batteries    explosion    investment    quality    730    demand    improvements    worried    eliminate    longevity    consumers    risk    profits    accidents    respondents    unmet    demanded    fire    smartphone    foresee    accelerating    improperly    insurance    protects    46    longer    optimise    safety    charged    delay    drained    fail    intelligent    times    charging    satisfy    cumulative    huge    projection    companies    surprisingly    sales    resistant    chargeguard    deterioration    direct    estimates    charger    demonstrates    device    business    screens    day    patented    optimising    profiles    distributors    recharge    14m    charge    procedure    yearly    3rd    phone    2024    poor    featured    monitoring    solution    cameras    mobile    technological    battery    smart    smartphones    forecast    20m    lithium    replace    retailers    prefer    ones    keep    party    overheating    compatible    surveys    agreements    people    life    temperature    return    exclusive    prolongs    young    improves    owners    earn    optium    voltage    market    consequently    last    profit    parents    lifespan   

Project "Optium" data sheet

The following table provides information about the project.

Coordinator
CHARGE GUARD AS 

Organization address
address: RADYRVEGEN 16
city: HORNNES
postcode: 4737
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website https://www.getchargeguard.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2019
 Duration (year-month-day) from 2019-05-01   to  2019-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CHARGE GUARD AS NO (HORNNES) coordinator 50˙000.00

Map

 Project objective

Longer battery life is the most demanded feature by smartphone users. Surprisingly, surveys show that 46% of respondents would prefer longer battery life rather than better smartphone cameras or more resistant screens. Current lithium-based batteries fail to keep up with smartphone technological improvements. As a result, batteries do not last long during the day. Moreover, users recharge their smartphones improperly accelerating battery deterioration. Consequently, batteries get drained quickly and users must replace their mobile phone or replace old batteries with poor low-quality new ones. ChargeGuard has developed and patented an intelligent device for optimising charging, increasing battery lifespan and monitoring system and battery temperature and voltage for improved safety. Optium is a smart charge management system that protects and prolongs battery life. The objective of this project is to provide consumers with a 3rd party charger device able to optimise the way batteries get charged and delay the deterioration of batteries by three times. Optium project will satisfy the high unmet demand of consumers for a product that improves smartphone charging procedure, eliminate risk of fire/ battery explosion and increase battery longevity, by providing a 3rd party intelligent charger featured with unique characteristics and fully compatible with any smartphone on the market. We will target different users’ profiles, such as young smartphone owners, business people, large companies and parents worried about fire accidents due to battery overheating. We will market Optium through direct sales, distributors & retailers as well as through exclusive agreements with insurance companies. The potential market is huge. Our projection clearly demonstrates the potential of our solution. By 2024, we foresee to earn more than €14m profit yearly. Our forecast estimates cumulative profits of €20m by 2024 with a return on investment of 730%.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "OPTIUM" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "OPTIUM" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

VINOQUANT11SUPERPLUS (2019)

A digital based system for measuring, showing and regulation of the complexe system of wine feremtation with high precision via a Bluetooth -Refractometer, a Software and a Bluetooth Thermostat

Read More  

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More