Opendata, web and dolomites

CLUG SIGNED

CERTIFIABLE LOCALISATION UNIT WITH GNSS IN THE RAILWAY ENVIRONMENT

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CLUG project word cloud

Explore the words cloud of the CLUG project. It provides you a very rough idea of what is the project "CLUG" about.

performance    caf    goods    ec    interoperable    stars    perform    changer    companies    report    era    perspective    consisting    rail    confirmed    preliminary    localisation    mitigate    location    capitalising    gsa    entire    signaling    space    eraccording    fdc    prove    sensor    naventik    railway    localization    sensors    airbus    ertms    efficient    former    agile    feasibility    identification    map    certification    minimal    network    compatible    mission    failsafe    continuous    tachometer    safe    imu    specialists    expert    navcert    evolutions    board    netz    longer    ultimately    industries    track    mobility    observations    2015    according    collaborating    points    train    speed    provides    sncf    clug    game    trackside    campaigns    citizen    digitalisation    gt    ing    defense    db    transport    dynamics    tsi    sbb    navigation    leveraging    automation    green    follow    reference    proof    local    core    enac    gnss    siemens    achievements    fusion   

Project "CLUG" data sheet

The following table provides information about the project.

Coordinator
SNCF 

Organization address
address: 2 PLACE AUX ETOILES
city: SAINT DENIS
postcode: 93200
website: www.sncf.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Total cost 3˙811˙527 €
 EC max contribution 2˙759˙313 € (72%)
 Programme 1. H2020-EU.2.1.6.3. (Enabling exploitation of space data)
 Code Call H2020-SPACE-EGNSS-2019
 Funding Scheme IA
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2021-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SNCF FR (SAINT DENIS) coordinator 338˙296.00
2    SIEMENS MOBILITY GMBH DE (MUNCHEN) participant 589˙174.00
3    AIRBUS DEFENCE AND SPACE SAS FR (TOULOUSE CEDEX) participant 354˙751.00
4    FDC SARL FR (VINCENNES) participant 308˙420.00
5    DB NETZ AG DE (FRANKFURT AM MAIN) participant 306˙031.00
6    NAVENTIK GMBH DE (CHEMNITZ) participant 212˙712.00
7    ECOLE NATIONALE DE L AVIATION CIVILE FR (TOULOUSE) participant 212˙625.00
8    NAVCERT GMBH DE (BRAUNSCHWEIG) participant 183˙009.00
9    Construcciones y Auxiliar de Ferrocarriles, S.A. ES (Beasain) participant 151˙322.00
10    SCHWEIZERISCHE BUNDESBAHNEN SBB CH (BERN) participant 102˙970.00

Map

 Project objective

According to the ERAccording to the ERA 2015 Report on ERTMS Longer Term Perspective, GNSS could prove a game changer for the European railway network by enabling a significant reduction of trackside equipment and by improving localisation performance. The conclusions of the STARS project have confirmed this potential. However, fusion with other sensors will be necessary to mitigate the known impact of local effects on GNSS performance.

Capitalising on the achievements of EC and GSA funded projects, collaborating railway companies, i.e. SBB, DB and SNCF, would like to propose the project CLUG. This project will perform a mission analysis/needs identification and a preliminary feasibility study of an on-board localisation unit with the following characteristics: > failsafe on-board multi-sensor localisation unit consisting of a navigation core (IMU, tachometer, etc.) brought in reference using GNSS, track map and a minimal number of reference points; > on-board continuous localisation system that provides location, speed and other dynamics of the train; > operational and interoperable across the entire European rail network; > compatible with the current ERTMS TSI or with its future evolutions.

To achieve its objectives,the CLUG's management and the design and development of the localization unit will follow agile processes taking into account former projects results – especially STARS – as well as observations resulting from new test campaigns. The CLUG consortium comprises railway companies (SNCF, DB Netz and SBB), railway signaling industries (CAF and Siemens), navigation specialists (Airbus Defense & Space, Naventik, FDC), a research institute (ENAC) and a certification expert (Navcert).

Ultimately, this project is the key enabling technology for the future-proof development of train digitalisation and automation to respond to the increased mobility needs of all European citizen and goods by leveraging the train, a green safe and efficient means of transport.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CLUG" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CLUG" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.6.3.)

REDDCopernicus (2019)

Capacity for Copernicus REDD+ and Forest Monitoring Services

Read More  

CERTO (2020)

Copernicus Evolution – Research for Transitional-water Observation

Read More  

AMPERE (2020)

ASSET MAPPING PLATFORM FOR EMERGING COUNTRIES ELECTRIFICATION

Read More