SEAM4US

Sustainable Energy mAnageMent for Underground Stations

 Coordinatore COFELY ITALIA SPA 

 Organization address address: Via della Travicella 61
city: Rome
postcode: 179

contact info
Titolo: Dr.
Nome: Giovanni
Cognome: Pescatori
Email: send email
Telefono: 390651000000
Fax: 390651000000

 Nazionalità Coordinatore Italy [IT]
 Totale costo 4˙153˙587 €
 EC contributo 2˙877˙287 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Code Call FP7-2011-NMP-ENV-ENERGY-ICT-EeB
 Funding Scheme CP
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-10-03   -   2014-10-02

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    COFELY ITALIA SPA

 Organization address address: Via della Travicella 61
city: Rome
postcode: 179

contact info
Titolo: Dr.
Nome: Giovanni
Cognome: Pescatori
Email: send email
Telefono: 390651000000
Fax: 390651000000

IT (Rome) coordinator 0.00
2    ALMENDE B.V.

 Organization address address: WESTERSTRAAT
city: ROTTERDAM
postcode: 3016 DJ

contact info
Titolo: Dr.
Nome: Alfons Hermanus
Cognome: Salden
Email: send email
Telefono: +31 6 15091347
Fax: +31 10 4047773

NL (ROTTERDAM) participant 0.00
3    CNET SVENSKA AB

 Organization address address: SVARDVAGEN
city: DANDERYD
postcode: 18233

contact info
Titolo: Mr.
Nome: Ulf
Cognome: Wingstedt
Email: send email
Telefono: 46856890110
Fax: 46856890117

SE (DANDERYD) participant 0.00
4    FERROCARRIL METROPOLITA DE BARCELONA SA

 Organization address address: CARRER 60 ZONA FRANCA
city: BARCELONA
postcode: 8040

contact info
Titolo: Mr.
Nome: Michael
Cognome: PELLOT
Email: send email
Telefono: +34 93 298 74 64
Fax: +34 93 298 72 22

ES (BARCELONA) participant 0.00
5    FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V

 Organization address address: Hansastrasse
city: MUNCHEN
postcode: 80686

contact info
Titolo: Ms.
Nome: Diana
Cognome: Polewka
Email: send email
Telefono: +49 2241 14 15 75
Fax: +49 2241 14 23 86

DE (MUNCHEN) participant 0.00
6    TEKNOLOGIAN TUTKIMUSKESKUS VTT

 Organization address address: TEKNIIKANTIE
city: ESPOO
postcode: 02044 VTT

contact info
Titolo: Mr.
Nome: Jouni
Cognome: Hiltunen
Email: send email
Telefono: 358407000000
Fax: +358 20 722 2320

FI (ESPOO) participant 0.00
7    UNIVERSITA POLITECNICA DELLE MARCHE

 Organization address address: PIAZZA ROMA
city: ANCONA
postcode: 60121

contact info
Titolo: Dr.
Nome: Alberto
Cognome: Giretti
Email: send email
Telefono: 390712000000
Fax: 390712000000

IT (ANCONA) participant 0.00
8    UNIVERSITAET KASSEL

 Organization address address: MOENCHEBERGSTRASSE
city: KASSEL
postcode: 34109

contact info
Titolo: Prof.
Nome: Klaus
Cognome: David
Email: send email
Telefono: 495618000000
Fax: 495618000000

DE (KASSEL) participant 0.00
9    UNIVERSITAT POLITECNICA DE CATALUNYA

 Organization address address: Jordi Girona
city: BARCELONA
postcode: 8034

contact info
Titolo: Ms.
Nome: Silvia
Cognome: Vallve
Email: send email
Telefono: 34937398554
Fax: 34934017130

ES (BARCELONA) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

consumption    seam    subsystems    networks    experts    metro    stations    electricity    environmental    optimal    data    energy    saving    transportation    scheduling    us    middleware   

 Obiettivo del progetto (Objective)

Underground transportation systems are big energy consumers (e.g. 63,1 millions of kWh / year), and have significant impacts on energy consumption at a regional scale. One third of the networks' energy is required for operating the subsystems of metro stations and surroundings, such as ventilation, vertical transportation and lightning. Although a relatively small percentage of energy can be saved with an optimal management of these subsystems, a large energy saving in absolute terms can be obtained. The objective of SEAM4US is to develop advanced technologies for optimal and scalable control of metro stations that will produce a 5% saving in non-traction electricity consumption in one year, which is equivalent to the electricity consumed in more than 700 households. The project's main outcomes will be the creation of systems for optimized integrated energy management, and the development of a decision support system to drive mid-term investments. SEAM4US will integrate additional energy metering and sensor-actuator networks with the existing systems (e.g. surveillance, passenger information and train scheduling), by means of middleware as abstraction layer, to acquire grounded user, environmental and scheduling data. The data set will update and enable a set of adaptive energy consumption and environmental models to proactively and optimally control the metro stations. The consortium consists of a large metro network operator, TMB; a major player in energy-efficient system management sector, COFELY; building and environmental physics and construction experts UNIVPM and UPC, respectively; R&D experts in middleware, FhG FIT and VTT; R&D experts in user and agent-based scheduling modeling, ALMENDE and UNIK; system integrator, CNET.

Altri progetti dello stesso programma (FP7-ICT)

Apple-CORE (2007)

Architecture Paradigms and Programming Languages for Efficient programming of multiple CORES

Read More  

MONDO (2013)

Scalable Modelling and Model Management on the Cloud

Read More  

GIGAWAM (2008)

Giga bit access passive optical network using wavelength division multiplexing

Read More