WINDRIVE

Industrialization of a 3 MW Medium-Speed Brushless DFIG Drivetrain for Wind Turbine Applications

 Coordinatore WIND TECHNOLOGIES LIMITED 

 Organization address address: ST JOHN'S INNOVATION CENTRE - COWLEY ROAD
city: CAMBRIDGE
postcode: CB4 0WS

contact info
Titolo: Mr.
Nome: Ehsan
Cognome: Abdi
Email: send email
Telefono: 447774000000

 Nazionalità Coordinatore United Kingdom [UK]
 Totale costo 1˙998˙133 €
 EC contributo 1˙586˙998 €
 Programma FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs
 Code Call FP7-SME-2012
 Funding Scheme BSG-SME
 Anno di inizio 2012
 Periodo (anno-mese-giorno) 2012-11-01   -   2015-04-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    WIND TECHNOLOGIES LIMITED

 Organization address address: ST JOHN'S INNOVATION CENTRE - COWLEY ROAD
city: CAMBRIDGE
postcode: CB4 0WS

contact info
Titolo: Mr.
Nome: Ehsan
Cognome: Abdi
Email: send email
Telefono: 447774000000

UK (CAMBRIDGE) coordinator 763˙557.00
2    ROMAX TECHNOLOGY LIMITED

 Organization address address: RUTHERFORD HOUSE NOTTINGHAM SCIENCE AND TECHNOLOGY PARK
city: NOTTINGHAM
postcode: NG7 2PZ

contact info
Titolo: Dr.
Nome: Andy
Cognome: Poon
Email: send email
Telefono: 441160000000

UK (NOTTINGHAM) participant 400˙072.00
3    MITA-TEKNIK AS

 Organization address address: HANDVAERKERVEJ 1
city: RODKAERSBRO
postcode: 8840

contact info
Titolo: Mr.
Nome: Kristian
Cognome: Kjærholm
Email: send email
Telefono: +45 87514307

DK (RODKAERSBRO) participant 287˙611.00
4    SPEEDGOAT GMBH

 Organization address address: LANGSTRASSE 13
city: COURGEVAUX
postcode: 1796

contact info
Titolo: Mr.
Nome: Martin
Cognome: Stoller
Email: send email
Telefono: +41 266707550

CH (COURGEVAUX) participant 135˙758.00
5    SENVION SE

 Organization address address: UBERSEERING 10 OVAL OFFICE
city: Hamburg
postcode: 22297

contact info
Titolo: Dr.
Nome: Jan
Cognome: Kruse
Email: send email
Telefono: +49 4331 13139647

DE (Hamburg) participant 0.00
6    TECHNISCHE UNIVERSITEIT DELFT

 Organization address address: Stevinweg 1
city: DELFT
postcode: 2628 CN

contact info
Titolo: Mr.
Nome: Nils
Cognome: Meijer
Email: send email
Telefono: 31152785303
Fax: 31151787022

NL (DELFT) participant 0.00
7    THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF CAMBRIDGE

 Organization address address: The Old Schools, Trinity Lane
city: CAMBRIDGE
postcode: CB2 1TN

contact info
Titolo: Ms.
Nome: Renata
Cognome: Schaeffer
Email: send email
Telefono: +44 1223 333543
Fax: +44 1223 332988

UK (CAMBRIDGE) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

mw    brushless    wtdt    reliability    kw    optimized    rated    monitoring    prototype    designed    demonstrated    speed    size    performance    gearbox    stage    converter    turbine    highest    wind    excluding    turbines    dfig    drivetrain    rate    components    industrial    integration    medium    generator   

 Obiettivo del progetto (Objective)

'This project is for the development and industrialization of a novel medium-speed wind turbine drivetrain (WTDT) designed to have an intrinsically higher reliability than the current most widely used high-speed WTDT, which employs a 3-stage gearbox and doubly-fed induction generator (DFIG) with partially-rated converter. The reason that this existing WTDT is so widely employed is that it is cost-effective because it makes use of widely available industrial components and adopts a low-cost partially-rated converter. The proposed medium-speed WTDT leverages the advantages of the existing DFIG WTDT, but also improves upon the intrinsic reliability by adopting: a) Medium-speed Brushless DFIG, excluding brush-gear and slip-rings, known to be the highest failure rate components in the generator; b) Partially-rated converter, identical to the high-speed WTDT; c) 2-stage gearbox, excluding the third high-speed stage, known to be the highest failure rate section of the gearbox. The project aims to move the Brushless DFIG technology from being a promising and proven concept, demonstrated in small-scale, to an optimized industrial-scale drivetrain for multi-MW wind turbines. The Brushless DFIG has been demonstrated on a 20 kW wind turbine and most recently, a 250 kW prototype generator on a test bed. However, in order to make the generator commercially attractive, its performance must be optimized to industrial levels and be demonstrated on a real size drivetrain. Further, its mechanical and electrical integration within a wind turbine system must be optimized with respect to cost, weight and size, including converter, generator, gearbox, controller and associated Condition Monitoring System (CMS). The project will study several aspects of the Brushless DFIG including its design, operation, grid connection, control and condition monitoring with an aim to optimize and improve the drivetrain performance for wind generation. Furthermore, its integration into a WTDT and optimization on a system-level will be carried out. A 3 MW medium-speed Brushless DFIG drivetrain will be designed which will be utilized the follow-on exploitation phase to build and test a 3 MW prototype system.'

Introduzione (Teaser)

Wind turbines will become more reliable and cost effective thanks to an EU-funded initiative that is developing a new generator system for the wind power industry.

Altri progetti dello stesso programma (FP7-SME)

ULTRATENDER (2013)

Non-Invasive high power ultrasound (HPU) processing method for meat tenderization

Read More  

WELD-IT (2010)

Welding process planning and parametric pricing software solution for SMEs

Read More  

HI-FRE (2009)

Efficient membrane filtration units with integrated High Frequency Backpulsing device

Read More