Opendata, web and dolomites

E6 Evolution

Dual Fuel Euro6 Engine Conversion Feasibility Study

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 E6 Evolution project word cloud

Explore the words cloud of the E6 Evolution project. It provides you a very rough idea of what is the project "E6 Evolution" about.

road    particulate    euro6    prototype    dual    provides    innovate    chain    producing    savings    territories    acceptable    heavy    items    marketing    nox    heavily    controls    comply    engineer    oem    expectations    led    gv    demonstrated    uk    reductions    arising    suitable    accelerate    basis    quality    ancilliary    carbon    sizes    safety    acceptance    truck    worldwide    intends    strategic    engines    plan    fuel    routes    sales    demanded    transport    operators    reporting    itself    supply    world    ip    professional    examine    refuelling    vehicles    invested    markets    company    haulage    solution    last    vehicle    asia    refine    usa    inventory    infrastructure    penetration    route    patented    least    daily    homologation    standards    reducing    commercially    trl    initial    business    components    retrofit    re    trial    continents    model    15    volution    meet    installed    commercial    reliability    market    feasibility    co2    emissions    consequent    intent    carry    fleets    territory    line    pioneer    certification    ready    qualities    first   

Project "E6 Evolution" data sheet

The following table provides information about the project.

Coordinator
G-VOLUTION LTD 

Organization address
address: VENTURE HOUSE 4TH FLOOR 27/29 GLASSHOUSE STREET
city: LONDON
postcode: W1B 5DB
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.g-volution.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-07-01   to  2015-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    G-VOLUTION LTD UK (LONDON) coordinator 50˙000.00

Map

 Project objective

G-Volution has been a pioneer of the use of dual fuel technology in heavy road haulage vehicles in the UK and Europe, with current operators using dual fuel on a daily basis reporting real world CO2 emissions reduction of at least 15%, with consequent reductions in NOx and particulate emissions. The Company has invested heavily in development for more than 8 years, producing a range of patented technology. The new Euro 6 solution has been developed from GV’s patented Euro 5 solution, itself installed on a significant number of vehicle fleets, and demonstrated as part of the current Innovate UK Low carbon truck and refuelling infrastructure trial. Commercial developments over the last year or so have led to initial sales success through the acceptance of the technology as a solution that provides the qualities demanded for future transport Worldwide The objective of the overall project is to develop the current prototype Euro 6 prototype vehicle to provide the first commercially available retrofit solution for Euro6 engines. The strategic intent is to accelerate growth and increase penetration across Europe, USA and Asia by reducing the cost & increasing the reliability of the system while developing strategic partners in key European and World markets. This first part proposal intends to examine the feasibility and route to: Refine design for components and controls in line with OEM quality standards. Re-engineer ancilliary items to comply with OEM acceptable safety and other standards. Set targets for cost reduction based on market sizes and expectations and operating cost savings. Investigate, and set up, a suitable professional supply chain to meet cost targets and quality. Investigate certification and homologation routes for various territories/continents. Produce a marketing and delivery plan that addresses business model by territory. Carry out an IP inventory, both current and arising. Raise TRL from 5-6 to 8-9, market ready.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "E6 EVOLUTION" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "E6 EVOLUTION" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

ROBOCOAT (2016)

HARD CHROME REPLACEMENT FOR AUTOMOTIVE MOULDS

Read More  

GT WHR system (2015)

Green Turbine WHR System

Read More  

MAXITHERM (2015)

Innovative textile based heating system for technical applications with a special focus on Electric Vehicles

Read More