Opendata, web and dolomites

JOS

JOS, the first electrified Energy Surface with high efficiency, high power and high energy savings for the wireless charging of all low voltage devices.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 JOS project word cloud

Explore the words cloud of the JOS project. It provides you a very rough idea of what is the project "JOS" about.

time    alternative    batteries    extensible    surface    jos    feed    voltage    first    wall    device    longer    context    double    social    charging    huge    plus    electromagnetic    spaces    absorption    market    facilitation    customization    power    business    environment    photovoltaic    single    25    proposition    sound    flexibility    healthiness    inner    virtue    wiring    position    adaptable    contexts    panel    electrified    cables    integration    simplifying    positioning    connection    installation    numberless    b2b    exploitable    offers    answer    table    powered    electronic    elimination    panels    ceiling    feasibility    b2c    markets    polluting    types    lighting    efficiency    series    wires    direct    emissions    savings    structural    formats    co2    enjoy    models    near    multiplying    thermal    traces    patented    saving    interventions    insulation    energy    protect    fed    disability    true    electronics    custom    functional    supply    phases   

Project "JOS" data sheet

The following table provides information about the project.

Coordinator
JOS TECHNOLOGY 

Organization address
address: VIA ARTIGIANI 29/31
city: VIGOLZONE PC
postcode: 29020
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.jostechnology.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-12-01   to  2016-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    JOS TECHNOLOGY IT (VIGOLZONE PC) coordinator 50˙000.00

Map

 Project objective

JOS is the first Energy Surface with high-power and energy efficiency, a patented lighting and charging device system. It’s a low-voltage electrified panel, on which it’s possible to feed any electronic device without any cables, in numberless position and with an energy saving of up to 25% compared with traditional systems. JOS can also be powered with direct photovoltaic and it’s extensible in series even on very large areas, so to use a single power supply and protect the environment. All spaces fed with JOS will enjoy a strong reduction of electromagnetic emissions. The panel has the virtue of thermal insulation and sound absorption, exploitable in the context of inner installation. JOS technology offers a very different technology and is characterized by: INTEGRATION of all types of devices, HIGH POWER (100 W per connection), FLEXIBILITY in positioning (table, wall, ceiling), ENERGY SAVING, CUSTOMIZATION (functional and design). JOS is not just a product but a technology with a double value proposition, both B2C and B2B. JOS B2C - Consumer Electronics, huge market. PLUS: integration, savings, flexibility, elimination of wires. JOS B2B - Great alternative or integration to traditional installation - panels of custom formats, extensible in series with specific devices. PLUS: reduction of time and costs in all phases, no longer traces or wiring, or structural interventions for changes, electromagnetic healthiness, energy saving. A technology adaptable to many different contexts, including disability, multiplying and simplifying the access to energy, with a strong facilitation of social and working conditions. Because JOS is a system with many possible applications, the feasibility study will be particularly aimed at the study of various business models, according to the different contexts and at detailed analysis of the various markets. The first true answer to avoid the need of CO2 polluting batteries in the near future.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "JOS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "JOS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

EcoMultiCloud (2015)

Hierarchical Approach for Green Workload Management in Distributed Data Centers reducing energy bill and carbon footprint

Read More  

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

iDriver (2015)

iDriver

Read More