Opendata, web and dolomites

INTMET

Integrated innovative metallurgical system to benefit efficiently polymetallic, complex and low grade ores and concentrates

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 INTMET project word cloud

Explore the words cloud of the INTMET project. It provides you a very rough idea of what is the project "INTMET" about.

commodities    bioleaching    tech    valuable    transport    expert    flotation    energy    grade    metallurgical    tailings    breakthrough    industrially    diversification    atmospheric    intmet    pressure    materials    sx    concentrates    eip    provider    zn    mining    complementary    vs    tr    chloride    smes    rm    providers    innovative    commitment    ew    model    metals    raw    polymetore    recovery    life    ag    market    crm    leaching    environmental    agq    media    limitations    competitiveness    footprint    environment    consumption    policy    producing    extension    water    minpol    pb    aligned    business    cuznpb    lower    maximise    selective    site    ores    msa    efficiency    solutions    extraction    difficult    mines    sb    acute    efficient    additionally    economic    sulphur    minimising    thanks    metal    economically    employment    yield    rtd    60    solution    guaranteed    mine    secondary    cu    profitable    overcome    techniques    tested    validated    processing    feasibility    industry    substantially    technological    waste    wastes    operation    smelters    outotec    hydrometallurgical    expertise    co    entire    hydroprocessing   

Project "INTMET" data sheet

The following table provides information about the project.

Coordinator
COBRE LAS CRUCES SA 

Organization address
address: AVDA. EL GARROBO 4
city: SEVILLA
postcode: 41860
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.intmet.eu/
 Total cost 7˙834˙976 €
 EC max contribution 7˙834˙976 € (100%)
 Programme 1. H2020-EU.3.5.3. (Ensuring the sustainable supply of non-energy and non-agricultural raw materials)
 Code Call H2020-SC5-2015-one-stage
 Funding Scheme RIA
 Starting year 2016
 Duration (year-month-day) from 2016-02-01   to  2019-01-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    COBRE LAS CRUCES SA ES (SEVILLA) coordinator 2˙737˙426.00
2    MINING AND METALLURGY INSTITUTE BOR LTD RS (BOR) participant 904˙656.00
3    OUTOTEC (FINLAND) OY FI (ESPOO) participant 799˙875.00
4    TECNICAS REUNIDAS SA ES (MADRID) participant 710˙625.00
5    BUREAU DE RECHERCHES GEOLOGIQUES ET MINIERES FR (ORLEANS) participant 581˙893.00
6    MINPOL GMBH AT (MARKT PIESTING) participant 453˙125.00
7    SIEC BADAWCZA LUKASIEWICZ - INSTYTUT METALI NIEZELAZNYCH PL (GLIWICE) participant 419˙000.00
8    INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE PENTRU METALE NEFEROASE SIRARE-IMNR RO (PANTELIMON ILFOV) participant 370˙001.00
9    MINTEK ZA (RANDBURG) participant 327˙748.00
10    AGQ MINING & BIOENERGY SL ES (BURGUILLOS) participant 301˙275.00
11    SOMINCOR - SOCIEDADE MINEIRA DE NEVES-CORVO SA PT (CASTRO VERDE) participant 194˙875.00
12    KGHM POLSKA MIEDZ SA PL (LUBIN) participant 34˙475.00
13    GUENTER TIESS AT (DREISTETTEN) participant 0.00

Map

 Project objective

The INTMET approach represents a unique technological breakthrough to overcome the limitations related to difficult low grade and complex ores to achieve high efficient recovery of valuable metals (Cu, Zn, Pb, Ag) and CRM (Co, In, Sb). Main objective of INTMET is applying on-site mine-to-metal hydroprocessing of the produced concentrates enhancing substantially raw materials efficiency thanks to increase CuZnPb recovery over 60% vs. existing selective flotation. 3 innovative hydrometallurgical processes (atmospheric, pressure and bioleaching), and novel more effective metals extraction techniques (e.g. Cu/Zn-SX-EW, chloride media, MSA, etc) will be developed and tested at relevant environment aiming to maximise metal recovery yield and minimising energy consumption and environmental footprint. Additionally secondary materials like tailings and metallurgical wastes will be tested as well for metals recovery and sulphur valorisation. The technical, environmental and economic feasibility of the entire approaches will be evaluated to ensure a real business solution of the integrated INTMET process. INTMET will be economically viable thanks to diversification of products (Cu, Zn, Pb), high-profitable solution (producing commodities not concentrates), with lower operation and environmental costs (on-site hydroprocessing will avoid transport to smelters) and allowing mine-life extension developing a new business-model concept based on high efficient recovery of complex ores that will ensure EU mining industry competitiveness and employment. INTMET is fully aligned with EIP-RM validated in the PolymetOre Commitment where most of INTMET partners take part on and the market up-take solutions are guaranteed by an exploitation from industrially-driven consortia composed by 3 Mines, 2 SMEs (AGQ -waste&water tech provider; MINPOL -policy & exploitation expert), 2 tech providers (OUTOTEC and TR) and 5 complementary RTD´s with expertise in leaching and recovery metals processing

 Deliverables

List of deliverables.
Report and results of stakeholder interaction activities - Interim Documents, reports 2019-08-30 13:50:35
Exploitation strategic plan, innovation plan and business model - initial Documents, reports 2019-08-30 13:50:35
Report on flotation laborotarory test works and pilot plant achievements and results Documents, reports 2019-08-30 13:50:35
Report on characterization of primary and secondary raw materials (initial) Documents, reports 2019-08-30 13:50:35
Detailed Dissemination Plan Documents, reports 2019-08-30 13:50:35
Report on flotation pilot plant design and arrangement plan Documents, reports 2019-08-30 13:50:35
Exploitation strategic plan and business model - final Documents, reports 2019-08-30 13:50:35
Report on characterization of primary and secondary raw materials (final) Documents, reports 2019-08-30 13:50:34
Public Report on Technology and Life Cycle Assessment Documents, reports 2019-08-30 13:50:35
Report and results of stakeholder interaction activities - final Documents, reports 2019-08-30 13:50:35

Take a look to the deliverables list in detail:  detailed list of INTMET deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTMET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INTMET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.3.)

CEWASTE (2018)

Voluntary certification scheme for waste treatment

Read More  

TARANTULA (2019)

Recovery of Tungsten, Niobium and Tantalum occurring as by-products in mining and processing waste streams

Read More  

ROBOMINERS (2019)

Resilient Bio-inspired Modular Robotic Miners

Read More