Opendata, web and dolomites

INTMET

Integrated innovative metallurgical system to benefit efficiently polymetallic, complex and low grade ores and concentrates

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 INTMET project word cloud

Explore the words cloud of the INTMET project. It provides you a very rough idea of what is the project "INTMET" about.

sulphur    guaranteed    agq    mine    secondary    acute    environmental    minimising    hydrometallurgical    complementary    sx    competitiveness    concentrates    industry    commitment    solution    intmet    grade    outotec    smelters    innovative    metal    flotation    vs    providers    waste    eip    tailings    60    techniques    validated    tr    pb    economically    provider    pressure    atmospheric    metallurgical    aligned    smes    profitable    entire    producing    expert    cuznpb    expertise    overcome    leaching    minpol    difficult    bioleaching    feasibility    metals    maximise    extraction    market    environment    polymetore    wastes    transport    consumption    ag    rm    tech    footprint    policy    limitations    breakthrough    employment    raw    sb    selective    processing    commodities    economic    crm    tested    life    lower    diversification    materials    recovery    thanks    operation    efficiency    zn    msa    mines    media    ew    extension    ores    model    site    chloride    technological    cu    efficient    co    energy    water    mining    valuable    additionally    solutions    rtd    yield    substantially    industrially    hydroprocessing    business   

Project "INTMET" data sheet

The following table provides information about the project.

Coordinator
COBRE LAS CRUCES SA 

Organization address
address: AVDA. EL GARROBO 4
city: SEVILLA
postcode: 41860
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.intmet.eu/
 Total cost 7˙834˙976 €
 EC max contribution 7˙834˙976 € (100%)
 Programme 1. H2020-EU.3.5.3. (Ensuring the sustainable supply of non-energy and non-agricultural raw materials)
 Code Call H2020-SC5-2015-one-stage
 Funding Scheme RIA
 Starting year 2016
 Duration (year-month-day) from 2016-02-01   to  2019-01-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    COBRE LAS CRUCES SA ES (SEVILLA) coordinator 2˙737˙426.00
2    MINING AND METALLURGY INSTITUTE BOR LTD RS (BOR) participant 904˙656.00
3    OUTOTEC (FINLAND) OY FI (ESPOO) participant 799˙875.00
4    TECNICAS REUNIDAS SA ES (MADRID) participant 710˙625.00
5    BUREAU DE RECHERCHES GEOLOGIQUES ET MINIERES FR (ORLEANS) participant 581˙893.00
6    MINPOL GMBH AT (MARKT PIESTING) participant 453˙125.00
7    SIEC BADAWCZA LUKASIEWICZ - INSTYTUT METALI NIEZELAZNYCH PL (GLIWICE) participant 419˙000.00
8    INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE PENTRU METALE NEFEROASE SIRARE-IMNR RO (PANTELIMON ILFOV) participant 370˙001.00
9    MINTEK ZA (RANDBURG) participant 327˙748.00
10    AGQ MINING & BIOENERGY SL ES (BURGUILLOS) participant 301˙275.00
11    SOMINCOR - SOCIEDADE MINEIRA DE NEVES-CORVO SA PT (CASTRO VERDE) participant 194˙875.00
12    KGHM POLSKA MIEDZ SA PL (LUBIN) participant 34˙475.00
13    GUENTER TIESS AT (DREISTETTEN) participant 0.00

Map

 Project objective

The INTMET approach represents a unique technological breakthrough to overcome the limitations related to difficult low grade and complex ores to achieve high efficient recovery of valuable metals (Cu, Zn, Pb, Ag) and CRM (Co, In, Sb). Main objective of INTMET is applying on-site mine-to-metal hydroprocessing of the produced concentrates enhancing substantially raw materials efficiency thanks to increase CuZnPb recovery over 60% vs. existing selective flotation. 3 innovative hydrometallurgical processes (atmospheric, pressure and bioleaching), and novel more effective metals extraction techniques (e.g. Cu/Zn-SX-EW, chloride media, MSA, etc) will be developed and tested at relevant environment aiming to maximise metal recovery yield and minimising energy consumption and environmental footprint. Additionally secondary materials like tailings and metallurgical wastes will be tested as well for metals recovery and sulphur valorisation. The technical, environmental and economic feasibility of the entire approaches will be evaluated to ensure a real business solution of the integrated INTMET process. INTMET will be economically viable thanks to diversification of products (Cu, Zn, Pb), high-profitable solution (producing commodities not concentrates), with lower operation and environmental costs (on-site hydroprocessing will avoid transport to smelters) and allowing mine-life extension developing a new business-model concept based on high efficient recovery of complex ores that will ensure EU mining industry competitiveness and employment. INTMET is fully aligned with EIP-RM validated in the PolymetOre Commitment where most of INTMET partners take part on and the market up-take solutions are guaranteed by an exploitation from industrially-driven consortia composed by 3 Mines, 2 SMEs (AGQ -waste&water tech provider; MINPOL -policy & exploitation expert), 2 tech providers (OUTOTEC and TR) and 5 complementary RTD´s with expertise in leaching and recovery metals processing

 Deliverables

List of deliverables.
Report and results of stakeholder interaction activities - Interim Documents, reports 2019-08-30 13:50:35
Exploitation strategic plan, innovation plan and business model - initial Documents, reports 2019-08-30 13:50:35
Report on flotation laborotarory test works and pilot plant achievements and results Documents, reports 2019-08-30 13:50:35
Report on characterization of primary and secondary raw materials (initial) Documents, reports 2019-08-30 13:50:35
Detailed Dissemination Plan Documents, reports 2019-08-30 13:50:35
Report on flotation pilot plant design and arrangement plan Documents, reports 2019-08-30 13:50:35
Exploitation strategic plan and business model - final Documents, reports 2019-08-30 13:50:35
Report on characterization of primary and secondary raw materials (final) Documents, reports 2019-08-30 13:50:34
Public Report on Technology and Life Cycle Assessment Documents, reports 2019-08-30 13:50:35
Report and results of stakeholder interaction activities - final Documents, reports 2019-08-30 13:50:35

Take a look to the deliverables list in detail:  detailed list of INTMET deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTMET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INTMET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.3.)

WoodCircus (2018)

Underpinning the vital role of the forest-based sector in the Circular Bio-Economy

Read More  

TARANTULA (2019)

Recovery of Tungsten, Niobium and Tantalum occurring as by-products in mining and processing waste streams

Read More  

CEWASTE (2018)

Voluntary certification scheme for waste treatment

Read More