Opendata, web and dolomites

OILBLOCK

Immediate Oil Spill containment to mitigate impact on the marine ecosystem

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 OILBLOCK project word cloud

Explore the words cloud of the OILBLOCK project. It provides you a very rough idea of what is the project "OILBLOCK" about.

lightest    patented    positions    board    agreements    housed    until    environmental    shipping    emergency    hours    influence    exponentially    annual    solution    coastal    spills    multiply    scenarios    meters    recovery    demonstration    facility    decrease    smallest    facilities    million    sales    detection    starts    recruitment    standby    reflected    boom    caused    2028    commercialization    minutes    coast    infrastructure    regulators    installed    rigs    raised    revolutionary    damage    risk    oilblock    put    place    450    disasters    social    proven    units    rate    containment    adopters    stakeholders    detected    oil    ships    benchmark    economic    turn    closing    period    floating    spreading    first    employees    ecological    significantly    grows    commercial    world    searching    once    turnover    prevent    primary    finished    spill    guards    2021    alone    time    rig    solutions    500    harbo    rates    boost    deploys    operators    barrier    considering    nothing    lines    fast   

Project "OILBLOCK" data sheet

The following table provides information about the project.

Coordinator
HARBO TECHNOLOGIES LTD 

Organization address
address: REFIDIM 14/4
city: TEL AVIV
postcode: 69982
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://www.harbo-technologies.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-08-01   to  2016-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    HARBO TECHNOLOGIES LTD IL (TEL AVIV) coordinator 50˙000.00

Map

 Project objective

In Europe alone, about 20,000 oil spills were detected over a period of 6 years. Oil spills turn into major disasters because no immediate containment equipment is housed on-board large ships and oil rigs, and nothing that can prevent oil from spreading during the first hours of a spill and thus the damage grows exponentially with time of response. OILBLOCK project goal is to address the highly significant ecological, social and economic problems caused by oil spills. HARBO’s system starts operating within minutes of spill detection. In less than 30 minutes, it deploys 2,000 meters of a revolutionary containment boom (floating barrier), smallest and lightest than any of current solutions. HARBO’s patented technology has already been proven at the world's best testing facility for oil spill response. It is the first that can be pre-installed at standby positions in any place at risk for oil spills and therefore will multiply oil recovery rates and significantly decrease the environmental impact of spills. The solution has raised the interest of different stakeholders such as emergency response organizations, coast guards, shipping lines, oil rig operators and coastal infrastructure facilities among others. OILBLOCK project focus on searching strong European partnerships for ensuring the demonstration of the system in different real scenarios and closing commercial agreements for a fast commercialization once project is finished. The project will help to demonstrate first units for early adopters and therefore will put HARBO in the path to reach a sales rate of 450 units/year by 2021 with an expected annual turnover of €70 million due to system sales. This growth will be reflected in the recruitment of up to 50 new employees in next five years. By 2028 sales are expected to boost until 2,500 units/year due to the influence of regulators considering HARBO’s technology as a benchmark for oil spill primary containment.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "OILBLOCK" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "OILBLOCK" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

PAIR (2015)

Plasma active pollution control system

Read More  

OWANDBO (2016)

Smart secure system to share resources between OWners AND BOrrowers in a peer-to-peer collaborative consumption market

Read More  

Home of Cool (2017)

A novel environment-friendly limited space cooler for high volume food and beverage vending industries.

Read More