Opendata, web and dolomites

OILBLOCK

Immediate Oil Spill containment to mitigate impact on the marine ecosystem

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 OILBLOCK project word cloud

Explore the words cloud of the OILBLOCK project. It provides you a very rough idea of what is the project "OILBLOCK" about.

rig    rates    oilblock    coastal    benchmark    sales    detected    2028    containment    reflected    significantly    500    damage    housed    adopters    finished    operators    multiply    grows    guards    once    rigs    minutes    installed    2021    regulators    employees    prevent    solutions    lines    time    disasters    caused    harbo    rate    decrease    considering    smallest    facilities    until    recruitment    oil    emergency    standby    boost    lightest    fast    revolutionary    scenarios    recovery    commercialization    primary    commercial    detection    ships    million    economic    influence    units    spreading    closing    meters    period    proven    nothing    searching    raised    infrastructure    board    turnover    put    facility    solution    spill    turn    world    patented    first    risk    demonstration    deploys    floating    agreements    450    ecological    exponentially    hours    social    barrier    coast    positions    starts    alone    stakeholders    boom    spills    place    environmental    shipping    annual   

Project "OILBLOCK" data sheet

The following table provides information about the project.

Coordinator
HARBO TECHNOLOGIES LTD 

Organization address
address: REFIDIM 14/4
city: TEL AVIV
postcode: 69982
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://www.harbo-technologies.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-08-01   to  2016-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    HARBO TECHNOLOGIES LTD IL (TEL AVIV) coordinator 50˙000.00

Map

 Project objective

In Europe alone, about 20,000 oil spills were detected over a period of 6 years. Oil spills turn into major disasters because no immediate containment equipment is housed on-board large ships and oil rigs, and nothing that can prevent oil from spreading during the first hours of a spill and thus the damage grows exponentially with time of response. OILBLOCK project goal is to address the highly significant ecological, social and economic problems caused by oil spills. HARBO’s system starts operating within minutes of spill detection. In less than 30 minutes, it deploys 2,000 meters of a revolutionary containment boom (floating barrier), smallest and lightest than any of current solutions. HARBO’s patented technology has already been proven at the world's best testing facility for oil spill response. It is the first that can be pre-installed at standby positions in any place at risk for oil spills and therefore will multiply oil recovery rates and significantly decrease the environmental impact of spills. The solution has raised the interest of different stakeholders such as emergency response organizations, coast guards, shipping lines, oil rig operators and coastal infrastructure facilities among others. OILBLOCK project focus on searching strong European partnerships for ensuring the demonstration of the system in different real scenarios and closing commercial agreements for a fast commercialization once project is finished. The project will help to demonstrate first units for early adopters and therefore will put HARBO in the path to reach a sales rate of 450 units/year by 2021 with an expected annual turnover of €70 million due to system sales. This growth will be reflected in the recruitment of up to 50 new employees in next five years. By 2028 sales are expected to boost until 2,500 units/year due to the influence of regulators considering HARBO’s technology as a benchmark for oil spill primary containment.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "OILBLOCK" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "OILBLOCK" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

PBTech (2016)

Combined Plasma Biotrickling system for treating industrial VOC emissions

Read More  

APA (2018)

Filter-less water-based Air Pollution Abatement system

Read More  

PAIR (2015)

Plasma active pollution control system

Read More