Opendata, web and dolomites

OILBLOCK

Immediate Oil Spill containment to mitigate impact on the marine ecosystem

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 OILBLOCK project word cloud

Explore the words cloud of the OILBLOCK project. It provides you a very rough idea of what is the project "OILBLOCK" about.

coast    rate    spreading    prevent    rates    adopters    2028    time    floating    commercialization    shipping    social    agreements    containment    detected    oilblock    proven    2021    fast    spills    hours    once    facility    coastal    450    first    decrease    oil    operators    finished    smallest    million    meters    guards    lines    board    exponentially    environmental    emergency    disasters    minutes    ships    turnover    barrier    grows    until    boost    world    reflected    put    revolutionary    employees    benchmark    infrastructure    damage    risk    rigs    influence    lightest    considering    500    boom    place    starts    recovery    units    patented    scenarios    installed    closing    commercial    searching    period    alone    solutions    recruitment    nothing    housed    caused    annual    detection    ecological    raised    spill    rig    multiply    significantly    stakeholders    sales    facilities    positions    solution    regulators    demonstration    harbo    primary    turn    deploys    standby    economic   

Project "OILBLOCK" data sheet

The following table provides information about the project.

Coordinator
HARBO TECHNOLOGIES LTD 

Organization address
address: REFIDIM 14/4
city: TEL AVIV
postcode: 69982
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://www.harbo-technologies.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-08-01   to  2016-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    HARBO TECHNOLOGIES LTD IL (TEL AVIV) coordinator 50˙000.00

Map

 Project objective

In Europe alone, about 20,000 oil spills were detected over a period of 6 years. Oil spills turn into major disasters because no immediate containment equipment is housed on-board large ships and oil rigs, and nothing that can prevent oil from spreading during the first hours of a spill and thus the damage grows exponentially with time of response. OILBLOCK project goal is to address the highly significant ecological, social and economic problems caused by oil spills. HARBO’s system starts operating within minutes of spill detection. In less than 30 minutes, it deploys 2,000 meters of a revolutionary containment boom (floating barrier), smallest and lightest than any of current solutions. HARBO’s patented technology has already been proven at the world's best testing facility for oil spill response. It is the first that can be pre-installed at standby positions in any place at risk for oil spills and therefore will multiply oil recovery rates and significantly decrease the environmental impact of spills. The solution has raised the interest of different stakeholders such as emergency response organizations, coast guards, shipping lines, oil rig operators and coastal infrastructure facilities among others. OILBLOCK project focus on searching strong European partnerships for ensuring the demonstration of the system in different real scenarios and closing commercial agreements for a fast commercialization once project is finished. The project will help to demonstrate first units for early adopters and therefore will put HARBO in the path to reach a sales rate of 450 units/year by 2021 with an expected annual turnover of €70 million due to system sales. This growth will be reflected in the recruitment of up to 50 new employees in next five years. By 2028 sales are expected to boost until 2,500 units/year due to the influence of regulators considering HARBO’s technology as a benchmark for oil spill primary containment.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "OILBLOCK" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "OILBLOCK" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

APA (2018)

Filter-less water-based Air Pollution Abatement system

Read More  

PBTech (2016)

Combined Plasma Biotrickling system for treating industrial VOC emissions

Read More  

soundproof4win (2017)

Soundproof window with ventilation function

Read More