Opendata, web and dolomites

AIC24 SIGNED

Sustainable Datacenters Through Immersed Computing

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 AIC24 project word cloud

Explore the words cloud of the AIC24 project. It provides you a very rough idea of what is the project "AIC24" about.

supply    hire    industry    popular       governments    ultimately    reducing    consume    reduce    liquid    80    social    line    profits    properly    energy    suddenly    asperitas    centers    flexibility    efficiency    air    handle    38    hasn    worldwide    meet    25    sufficient    minimal    instead    telecommunication    roi    zero    efforts    ongoing    power    ease    cooling    stop    euros    data    networking    start    businesses    lack    greenhouse    electricity    employees    running    26    35    emissions    global    operate    48    consumption    shopping    dc    heat    computer    invested    density    messy    technologies    cumulative    environments    completion    6m    densities    market    banking    cool    there    total    searching    wasted    50    gain    approx    10    combined    accounting    ownership    companies    norm    aic24    world    gas    daily    connected    downtime    recycled    millions    unable    million    capex    responsible       dcs    modular   

Project "AIC24" data sheet

The following table provides information about the project.

Coordinator
AECORSIS B.V. 

Organization address
address: HOUTZAAGMOLEN 32
city: OUDERKERK AAN DEN IJSSEL
postcode: 2935AX
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website https://asperitas.com/asperitas-aic24/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-05-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AECORSIS B.V. NL (OUDERKERK AAN DEN IJSSEL) coordinator 50˙000.00

Map

 Project objective

There are around 8,6M Data Centers (DCs) worldwide which contribute to our daily activities such as on-line searching, social networking, telecommunication, banking, and on-line shopping. DCs consume around 3% of today’s world global energy supply, accounting for 2% of total greenhouse gas emissions. If a DC were to suddenly stop operating, much of the computer-connected world would be affected and it could cost businesses millions of euros. In order for these DCs to operate with minimal to zero downtime sufficient power and cooling is required. In Europe, the IT sector consumed 8-10% of all generated electricity, and all DCs combined were responsible for 2% of all energy consumption. More than 50% of this energy is used to cool the IT system (approx. 50% of the ongoing running costs) and as much as 80% of this energy is wasted as heat. Reducing the power consumption and improving efficiency of DCs to ultimately reduce operating costs and support the industry growth has become a major challenge with many efforts from governments and companies around the world. With an increasing number of high power density DCs being built, traditional air-cooling systems (most popular cooling for DCs) are unable to properly cool high-power density IT environments. Instead, liquid-cooling technologies on the market can support higher power densities, but do not provide high-availability, lack flexibility, are messy to handle and energy is still wasted, which is why this technology hasn’t yet become the norm in DCs. Asperitas, our start-up, has developed AIC24; a modular liquid cooling system that can meet the needs of high power density environments in availability and ease of use while reducing energy use by 50%, total cost of ownership by 35%, CapEx by 25%, and ensuring energy is recycled. In 5 years from completion of the project, we expect to gain €26,2 million in cumulative profits, hire 38 new employees and achieve a ROI of €6,48 per euro invested in this project.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "AIC24" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "AIC24" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

Woodywood pickering (2019)

Bio-based (fully renewable) cost effective Polymer for new generation of ecological Coatings leveraging a disruptive innovation in the use of Pickering emulsion.

Read More  

AUTHEVOO (2019)

DNA-Authenticity & Traceability for Extra Virgin Olive Oil: Τrust the DNA, the label.

Read More