Opendata, web and dolomites

AIC24 SIGNED

Sustainable Datacenters Through Immersed Computing

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 AIC24 project word cloud

Explore the words cloud of the AIC24 project. It provides you a very rough idea of what is the project "AIC24" about.

start    businesses    environments    computer    48    data    efforts    stop    accounting    emissions    26    electricity    handle    operate    governments    employees    roi    reduce    there    unable    air    modular    consume    greenhouse    consumption    energy    ongoing    technologies    50    social    6m    ownership    38    density    minimal    line    10    combined    total    daily    euros    completion    25    popular    recycled    banking    suddenly    power    profits    downtime    gas    shopping    world    35    asperitas    searching    meet    worldwide    wasted    telecommunication    centers    ultimately    gain    liquid    flexibility    cumulative    ease    sufficient    dc    dcs    running    cool    aic24    responsible    messy    millions    million    supply    approx    efficiency    reducing    hasn    cooling    companies    industry    lack    invested    3    properly    densities    norm    80    capex    hire    instead    connected    global    zero    heat    2    market    networking   

Project "AIC24" data sheet

The following table provides information about the project.

Coordinator
AECORSIS B.V. 

Organization address
address: HOUTZAAGMOLEN 32
city: OUDERKERK AAN DEN IJSSEL
postcode: 2935AX
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website https://asperitas.com/asperitas-aic24/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-05-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AECORSIS B.V. NL (OUDERKERK AAN DEN IJSSEL) coordinator 50˙000.00

Map

 Project objective

There are around 8,6M Data Centers (DCs) worldwide which contribute to our daily activities such as on-line searching, social networking, telecommunication, banking, and on-line shopping. DCs consume around 3% of today’s world global energy supply, accounting for 2% of total greenhouse gas emissions. If a DC were to suddenly stop operating, much of the computer-connected world would be affected and it could cost businesses millions of euros. In order for these DCs to operate with minimal to zero downtime sufficient power and cooling is required. In Europe, the IT sector consumed 8-10% of all generated electricity, and all DCs combined were responsible for 2% of all energy consumption. More than 50% of this energy is used to cool the IT system (approx. 50% of the ongoing running costs) and as much as 80% of this energy is wasted as heat. Reducing the power consumption and improving efficiency of DCs to ultimately reduce operating costs and support the industry growth has become a major challenge with many efforts from governments and companies around the world. With an increasing number of high power density DCs being built, traditional air-cooling systems (most popular cooling for DCs) are unable to properly cool high-power density IT environments. Instead, liquid-cooling technologies on the market can support higher power densities, but do not provide high-availability, lack flexibility, are messy to handle and energy is still wasted, which is why this technology hasn’t yet become the norm in DCs. Asperitas, our start-up, has developed AIC24; a modular liquid cooling system that can meet the needs of high power density environments in availability and ease of use while reducing energy use by 50%, total cost of ownership by 35%, CapEx by 25%, and ensuring energy is recycled. In 5 years from completion of the project, we expect to gain €26,2 million in cumulative profits, hire 38 new employees and achieve a ROI of €6,48 per euro invested in this project.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "AIC24" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "AIC24" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

COUNTMITMENT (2019)

NATURAL CAPITAL ACCOUNTANCY TO IMPROVE REPORTING AND ENVIRONMENTAL PERFORMANCE

Read More  

EVERCAM (2020)

Intelligent Vision System for Improved Communication and Higher Productivity in Construction

Read More