Opendata, web and dolomites

AIC24 SIGNED

Sustainable Datacenters Through Immersed Computing

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 AIC24 project word cloud

Explore the words cloud of the AIC24 project. It provides you a very rough idea of what is the project "AIC24" about.

dcs    downtime    emissions    density    air    sufficient    gas    cooling    world    environments    start    norm    million    efficiency    accounting    daily    unable    searching    technologies    energy    supply    hire    operate    efforts    worldwide    ultimately    popular    ongoing       responsible    cool    centers    combined    ownership    48    line    reduce    profits    80    modular    flexibility    densities    businesses    hasn    dc    completion       electricity    35    total    millions    gain    messy    roi    governments    banking    cumulative    global    recycled    heat    approx    euros    companies    consume    6m    power    liquid    capex    10    aic24    greenhouse    instead    market    invested    computer    ease    properly    minimal    zero    stop    handle    shopping    reducing    asperitas    industry    38    26    social    50    data    lack    meet    25    connected    there    networking    telecommunication    wasted    suddenly    consumption    running    employees   

Project "AIC24" data sheet

The following table provides information about the project.

Coordinator
AECORSIS B.V. 

Organization address
address: HOUTZAAGMOLEN 32
city: OUDERKERK AAN DEN IJSSEL
postcode: 2935AX
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website https://asperitas.com/asperitas-aic24/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-05-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AECORSIS B.V. NL (OUDERKERK AAN DEN IJSSEL) coordinator 50˙000.00

Map

 Project objective

There are around 8,6M Data Centers (DCs) worldwide which contribute to our daily activities such as on-line searching, social networking, telecommunication, banking, and on-line shopping. DCs consume around 3% of today’s world global energy supply, accounting for 2% of total greenhouse gas emissions. If a DC were to suddenly stop operating, much of the computer-connected world would be affected and it could cost businesses millions of euros. In order for these DCs to operate with minimal to zero downtime sufficient power and cooling is required. In Europe, the IT sector consumed 8-10% of all generated electricity, and all DCs combined were responsible for 2% of all energy consumption. More than 50% of this energy is used to cool the IT system (approx. 50% of the ongoing running costs) and as much as 80% of this energy is wasted as heat. Reducing the power consumption and improving efficiency of DCs to ultimately reduce operating costs and support the industry growth has become a major challenge with many efforts from governments and companies around the world. With an increasing number of high power density DCs being built, traditional air-cooling systems (most popular cooling for DCs) are unable to properly cool high-power density IT environments. Instead, liquid-cooling technologies on the market can support higher power densities, but do not provide high-availability, lack flexibility, are messy to handle and energy is still wasted, which is why this technology hasn’t yet become the norm in DCs. Asperitas, our start-up, has developed AIC24; a modular liquid cooling system that can meet the needs of high power density environments in availability and ease of use while reducing energy use by 50%, total cost of ownership by 35%, CapEx by 25%, and ensuring energy is recycled. In 5 years from completion of the project, we expect to gain €26,2 million in cumulative profits, hire 38 new employees and achieve a ROI of €6,48 per euro invested in this project.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "AIC24" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "AIC24" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

COPI (2020)

Carbon Offset Plug-in

Read More  

Dyme (2019)

Dyme gives its users complete control over their financial situation. The Dyme application provides insight into users’ spending and subscriptions, and lets users cancel, negotiate, or switch any cont

Read More  

HUD (2018)

COMMERCIALIZING THE FIRST HEAD-UP-DISPLAY FOR OFF-HIGHWAY VEHICLES

Read More