Opendata, web and dolomites

EGgPLANT SIGNED

Sustainable and carbon-efficient mono-Ethylene Glycol generation in demonstration PLANT

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 EGgPLANT project word cloud

Explore the words cloud of the EGgPLANT project. It provides you a very rough idea of what is the project "EGgPLANT" about.

textile    eggplant    customers    2035    flagship    additional    gas    200    parties    competitive    techno    bio    almost    producing    lca    catalytic    industrial    requiring    sustainable    mekong    license    mton    market    sources    carbohydrates    conduct    operated    environmental    fossil    evaluation    efficient    oil    monoethylene    issue    provider    demonstration    demand    plants    supply    incumbent    expensive    glycol    terephthalate    preparation    poised    renewable    marketplace    subsequent    ton    cycle    inefficient    pet    avantium    meg    global    owners    primarily    position    strategic    despite    twenty    globally    geographies    quantities    carbon    packaging    shale    downstream    11    party    coal    stated    polyethylene    producers    collecting    alternatives    tons    million    lower    quality    plant    compete    kton    least    solution    base    validation    economic    size    companies    source    deploy    hampering    data    life    brand   

Project "EGgPLANT" data sheet

The following table provides information about the project.

Coordinator
AVANTIUM CHEMICALS BV 

Organization address
address: ZEKERINGSTRAAT 29
city: AMSTERDAM
postcode: 1014 BV
website: www.avantium.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website https://www.avantium.com/eggplant/
 Total cost 5˙351˙125 €
 EC max contribution 2˙499˙999 € (47%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AVANTIUM CHEMICALS BV NL (AMSTERDAM) coordinator 2˙499˙999.00

Map

 Project objective

The EGgPLANT project will scale up in a demonstration plant a novel method to produce monoethylene glycol (MEG) from renewable carbohydrates using a highly carbon efficient catalytic process. The global MEG market demand is growing from a current base of 30 Mton/year to over 50 Mton by 2035, requiring more than a million tons of additional supply every year for the next twenty years. Today, almost all of the MEG produced globally is from fossil sources despite a stated need from forward-looking brand owners, packaging and textile companies to source MEG from renewable sources. There is one provider of bio-based MEG on the market which is using an inefficient and expensive process compared to lower cost oil, shale gas, and coal-based alternatives. This high cost position is hampering the widespread use of bio-based MEG. To address this issue, Avantium has developed a one-step ‘Mekong’ process for producing bio-MEG from renewable sources which can compete with the incumbent fossil-based product on both cost and quality, making the product competitive in the global marketplace and poised to be a sustainable supply solution to address the increasing demand. The demonstration plant (11 ton/year) built and operated in this project allows for techno-economic scale-up and evaluation of the process, in addition to producing relevant sample quantities of product to support downstream validation in at least three applications, collecting of data to conduct a third-party environmental life-cycle assessment (LCA) and preparation for scale-up to industrial size plants. The next phase after this project is to deploy a 200 kton/year Mekong flagship plant with a strategic partner in Europe. Target customers of this flagship plant will primarily be European polyethylene terephthalate (PET) producers. Avantium and the strategic partner will deploy subsequent industrial scale plants in Europe, and will license out the technology to parties in geographies other than Europe.

 Deliverables

List of deliverables.
Kick-off meeting Other 2020-01-14 11:25:33
Public Website Websites, patent fillings, videos etc. 2019-11-07 15:07:42

Take a look to the deliverables list in detail:  detailed list of EGgPLANT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EGGPLANT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EGGPLANT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Woodywood pickering (2019)

Bio-based (fully renewable) cost effective Polymer for new generation of ecological Coatings leveraging a disruptive innovation in the use of Pickering emulsion.

Read More  

ADAPTOS (2019)

ADAPTOS - Changing the way bone voids are treated

Read More  

AVIAZE (2020)

The social network for pilots, to make flying safer and cheaper

Read More