Opendata, web and dolomites

EGgPLANT SIGNED

Sustainable and carbon-efficient mono-Ethylene Glycol generation in demonstration PLANT

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 EGgPLANT project word cloud

Explore the words cloud of the EGgPLANT project. It provides you a very rough idea of what is the project "EGgPLANT" about.

plant    market    deploy    producing    solution    200    kton    catalytic    global    preparation    producers    sources    packaging    validation    meg    cycle    collecting    incumbent    avantium    lower    expensive    owners    despite    base    size    oil    poised    parties    companies    quality    position    subsequent    industrial    data    inefficient    plants    almost    demonstration    operated    environmental    eggplant    flagship    downstream    fossil    competitive    gas    hampering    conduct    11    carbohydrates    demand    monoethylene    2035    tons    source    million    least    mton    shale    customers    stated    efficient    twenty    requiring    globally    issue    renewable    provider    polyethylene    strategic    carbon    additional    brand    lca    ton    textile    pet    quantities    supply    compete    bio    party    geographies    techno    license    primarily    sustainable    mekong    alternatives    glycol    economic    coal    evaluation    terephthalate    life    marketplace   

Project "EGgPLANT" data sheet

The following table provides information about the project.

Coordinator
AVANTIUM CHEMICALS BV 

Organization address
address: ZEKERINGSTRAAT 29
city: AMSTERDAM
postcode: 1014 BV
website: www.avantium.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website https://www.avantium.com/eggplant/
 Total cost 5˙351˙125 €
 EC max contribution 2˙499˙999 € (47%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AVANTIUM CHEMICALS BV NL (AMSTERDAM) coordinator 2˙499˙999.00

Map

 Project objective

The EGgPLANT project will scale up in a demonstration plant a novel method to produce monoethylene glycol (MEG) from renewable carbohydrates using a highly carbon efficient catalytic process. The global MEG market demand is growing from a current base of 30 Mton/year to over 50 Mton by 2035, requiring more than a million tons of additional supply every year for the next twenty years. Today, almost all of the MEG produced globally is from fossil sources despite a stated need from forward-looking brand owners, packaging and textile companies to source MEG from renewable sources. There is one provider of bio-based MEG on the market which is using an inefficient and expensive process compared to lower cost oil, shale gas, and coal-based alternatives. This high cost position is hampering the widespread use of bio-based MEG. To address this issue, Avantium has developed a one-step ‘Mekong’ process for producing bio-MEG from renewable sources which can compete with the incumbent fossil-based product on both cost and quality, making the product competitive in the global marketplace and poised to be a sustainable supply solution to address the increasing demand. The demonstration plant (11 ton/year) built and operated in this project allows for techno-economic scale-up and evaluation of the process, in addition to producing relevant sample quantities of product to support downstream validation in at least three applications, collecting of data to conduct a third-party environmental life-cycle assessment (LCA) and preparation for scale-up to industrial size plants. The next phase after this project is to deploy a 200 kton/year Mekong flagship plant with a strategic partner in Europe. Target customers of this flagship plant will primarily be European polyethylene terephthalate (PET) producers. Avantium and the strategic partner will deploy subsequent industrial scale plants in Europe, and will license out the technology to parties in geographies other than Europe.

 Deliverables

List of deliverables.
Kick-off meeting Other 2020-01-14 11:25:33
Public Website Websites, patent fillings, videos etc. 2019-11-07 15:07:42

Take a look to the deliverables list in detail:  detailed list of EGgPLANT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EGGPLANT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EGGPLANT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More