Opendata, web and dolomites

SMARTUNNEL SIGNED

The longest-life & energy-saving emergency LED lighting system for underground infrastructures

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SMARTUNNEL project word cloud

Explore the words cloud of the SMARTUNNEL project. It provides you a very rough idea of what is the project "SMARTUNNEL" about.

supply    80    types    during    efficiency    uk    first    energy    recharging    industry    13    patented    intentional    visibility    turned    reduce    flicker    usa    agriculture    jobs    consumption    cycles    when    workers    investment    wiring    market    2024    tunnelling    turns    batteries    lights    interference    smart    offers    prevents    commercialise    unintentional    led    thermal    amounts    validation    els    fast    intelligent    discrimination    waste    refurbishment    road    companies    total    circuits    rail    savings    life    30    germany    least    emergency    ships    scenario    lit    conveniently    uni    share    installations    construction    deterioration    driver       security    interruption    excessive    lighting    curbing    powered    manually    21    hours    outage    pilot    battery    needless    austria    keep    off    leads    switch    health    smartunnel    free    electromagnetic    optimisation    longest    illumination    force    sweden    power    reaching    3km    exhaustion    light    tunnel    installation    safety    tunnels    initial   

Project "SMARTUNNEL" data sheet

The following table provides information about the project.

Coordinator
A UNI LIGHT LED AB 

Organization address
address: TEGELUDDSVAGEN 31 PL 4
city: STOCKHOLM
postcode: 115 41
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://uni-lightled.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    A UNI LIGHT LED AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batteries). This leads to needless energy consumption and fast battery deterioration. We, at Uni-light LED, have developed Smartunnel, a new smart LED ELS for tunnels under construction/refurbishment, which turns off when light is not needed. Our smart switch and intelligent control allow discrimination between unintentional power outage and intentional interruption, so that emergency lights are lit only under the first scenario. This prevents excessive battery exhaustion/recharging cycles thus making Smartunnel the longest-life ELS on the market (10 years, 80% reduction in battery waste). Smartunnel offers 20-30% increased energy efficiency leading to effective savings of €13,000/3km per year. Our flicker-free and electromagnetic interference-free lights improve visibility and reduce health issues, enhancing safety and security for tunnel workers. Conveniently, Smartunnel can use existing wiring installations to power emergency lights, curbing the cost of new wiring in existing tunnels. We already commercialise 7 lighting product types, based on our patented LED light Driver and Thermal Management Technology for illumination in agriculture, industry and on ships, thus far reaching 100 companies in the UK, Sweden, Germany and Austria. The success of our existing systems has funded Smartunnel development. Following the optimisation of our design into a pilot for phase 2 validation under real conditions. We aim to achieve a tunnelling construction market share of 21 % in Europe as well as 8 % in USA by 2024, creating at least 20 new jobs at Uni-light LED in the process.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SMARTUNNEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SMARTUNNEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Woodywood pickering (2019)

Bio-based (fully renewable) cost effective Polymer for new generation of ecological Coatings leveraging a disruptive innovation in the use of Pickering emulsion.

Read More  

CyreenApplication (2019)

Connecting Ad-Impressions with Purchase. The new advanced Advertisement at the point of sales.

Read More  

CAARESYS (2019)

CAARESYS: vehicle passenger monitoring system based on contactless low emission radio frequency radar.

Read More