Opendata, web and dolomites

SMARTUNNEL SIGNED

The longest-life & energy-saving emergency LED lighting system for underground infrastructures

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SMARTUNNEL project word cloud

Explore the words cloud of the SMARTUNNEL project. It provides you a very rough idea of what is the project "SMARTUNNEL" about.

longest    force    80    types    consumption    circuits    power    investment    els    electromagnetic    needless    interference    construction    reduce    intelligent    hours    market    deterioration    light    switch    smartunnel    manually    supply    30    optimisation    validation    reaching    during    discrimination    industry    lit    workers    total    off    2024    tunnelling    tunnel    installation    safety    installations    fast    emergency    intentional    lights    waste    powered    outage    lighting    tunnels    3km    unintentional    ships    leads    usa    turned    batteries    conveniently    illumination    uni    curbing    least    patented    austria    driver    companies    savings    flicker    scenario    health    initial    keep    uk    21    germany    commercialise    exhaustion    pilot    free    refurbishment    energy    rail    13    thermal    offers    smart    battery       excessive    first    interruption    visibility    amounts    wiring    agriculture    cycles    recharging    road    life    jobs    led    turns    efficiency    share    prevents    security    when    sweden   

Project "SMARTUNNEL" data sheet

The following table provides information about the project.

Coordinator
A UNI LIGHT LED AB 

Organization address
address: TEGELUDDSVAGEN 31 PL 4
city: STOCKHOLM
postcode: 115 41
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://uni-lightled.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    A UNI LIGHT LED AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batteries). This leads to needless energy consumption and fast battery deterioration. We, at Uni-light LED, have developed Smartunnel, a new smart LED ELS for tunnels under construction/refurbishment, which turns off when light is not needed. Our smart switch and intelligent control allow discrimination between unintentional power outage and intentional interruption, so that emergency lights are lit only under the first scenario. This prevents excessive battery exhaustion/recharging cycles thus making Smartunnel the longest-life ELS on the market (10 years, 80% reduction in battery waste). Smartunnel offers 20-30% increased energy efficiency leading to effective savings of €13,000/3km per year. Our flicker-free and electromagnetic interference-free lights improve visibility and reduce health issues, enhancing safety and security for tunnel workers. Conveniently, Smartunnel can use existing wiring installations to power emergency lights, curbing the cost of new wiring in existing tunnels. We already commercialise 7 lighting product types, based on our patented LED light Driver and Thermal Management Technology for illumination in agriculture, industry and on ships, thus far reaching 100 companies in the UK, Sweden, Germany and Austria. The success of our existing systems has funded Smartunnel development. Following the optimisation of our design into a pilot for phase 2 validation under real conditions. We aim to achieve a tunnelling construction market share of 21 % in Europe as well as 8 % in USA by 2024, creating at least 20 new jobs at Uni-light LED in the process.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SMARTUNNEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SMARTUNNEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

CAARESYS (2019)

CAARESYS: vehicle passenger monitoring system based on contactless low emission radio frequency radar.

Read More  

RoboSynFarm (2019)

Robotic Synthesis Farm

Read More  

APS (2019)

On-site and On-demand Flexible Packaging System

Read More