Opendata, web and dolomites

CARBODIN SIGNED

Car Body Shells, Doors and Interiors

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CARBODIN project word cloud

Explore the words cloud of the CARBODIN project. It provides you a very rough idea of what is the project "CARBODIN" about.

01    combine    materials    2017    rail    interactions    size    ip1    maximisation    effort    strategies    multidisciplinary    inserts    cured    committed    lighter    made    virtual    door    14    nodes    explored    lcc    combining    attractive    intelligent    sensor    besides    countries    effectiveness    hmi    thermal    ongoing    complemented    benefit    composite    voices    creation    body    drivers    cfm    2019    volt    co    interior    vicinity    gestures    components    3d    car    acoustic    train    manufacturing    introduction    configuration    integration    survey    techniques    manufacture    varying    exploring    carbodin    possibilities    enhanced    contributes    bonded    panels    interiors    tool    trains    advocates    shell    core    innovative    concerted    mentioned    performance    doors    actions    modular    tools    efficient    combined    parts    reinforced    circuits    automation    maintenance    capability    demanding    idea    predictive    tooling    joints    material    passenger    reliability   

Project "CARBODIN" data sheet

The following table provides information about the project.

Coordinator
FUNDACIO EURECAT 

Organization address
address: AVENIDA UNIVERSITAT AUTONOMA 23
city: CERDANYOLA DEL VALLES (BARCELONA)
postcode: 8290
website: www.eurecat.org/

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Total cost 3˙549˙291 €
 EC max contribution 3˙549˙291 € (100%)
 Programme 1. H2020-EU.3.4.8.1. (Innovation Programme 1 (IP1): Cost-efficient and reliable trains)
 Code Call H2020-S2RJU-OC-2019
 Funding Scheme Shift2Rail-RIA
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2021-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FUNDACIO EURECAT ES (CERDANYOLA DEL VALLES (BARCELONA)) coordinator 577˙250.00
2    FORSTER SYSTEM-MONTAGE-TECHNIK GMBH DE (FORST) participant 379˙866.00
3    ASOCIACION DE INVESTIGACION METALURGICA DEL NOROESTE ES (PORRINO) participant 376˙250.00
4    UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA IT (ROMA) participant 333˙125.00
5    CG RAIL - CHINESISCH-DEUTSCHES FORSCHUNGS- UND ENTWICKLUNGSZENTRUM FURBAHN- UND VERKEHRSTECHNIK DRESDEN GMBH DE (DRESDEN) participant 265˙375.00
6    COMPOSITES ARAGON SL ES (ZARAGOZA) participant 264˙375.00
7    ETHNIKO KENTRO EREVNAS KAI TECHNOLOGIKIS ANAPTYXIS EL (THERMI THESSALONIKI) participant 254˙687.00
8    UNION INTERNATIONALE DES CHEMINS DE FER FR (PARIS) participant 247˙500.00
9    DES ART SP. Z O. O. PL (GDYNIA) participant 200˙625.00
10    RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN DE (AACHEN) participant 168˙238.00
11    UNIVERSITE POLYTECHNIQUE HAUTS-DE-FRANCE FR (VALENCIENNES) participant 168˙061.00
12    MASATS SA ES (SANT SALVADOR DE GUARDIOLA) participant 130˙437.00
13    EURNEX e. V. DE (BERLIN) participant 129˙750.00
14    VYZKUMNY USTAV ZELEZNICNI, AS CZ (PRAHA BRANIK) participant 53˙750.00

Map

 Project objective

The success of the European rail system requires cost-efficient passenger trains with high capability and reliability. The development of these high demanding trains involves a concerted effort in improving a comprehensive range of elements. CARBODIN contributes to this effort by combining the research effort along with the future CFM-IP1-01-2019 and the ongoing CFM-IP1-01-2017 projects to manufacture car body shell parts, doors and to improve the interior design of passenger trains. CARBODIN will improve car body shell manufacture by exploring the possibilities offered by composite materials. To this end, CARBODIN advocates for a modular tooling to manufacture a wide range of parts of varying size. In addition, the proposed process will combine different production techniques, automation concepts, introduction of co-cured and co-bonded composite parts and multi-material integrated joints and inserts. Besides, predictive maintenance will be reinforced by testing intelligent sensor nodes. Composite materials will also be the core idea for cost-efficient doors with reduced LCC. The creation of modular tooling combined with 3D technology will enable the production of lighter doors with enhanced thermal and acoustic properties in the door and its vicinity. CARBODIN will facilitate the design of attractive train interiors by developing a configuration tool based on virtual reality. This will be complemented by innovative manufacturing tools for interior components. Other strategies for improving cost-effectiveness of manufacturing processes such as the integration of low-volt circuits in panels will be also explored. CARBODIN also aims at improving the performance of the future HMI system through a European survey to identify key interactions such as drivers’ gestures or voices. CARBODIN will benefit from a strong multidisciplinary consortium, made of 14 partners from 7 countries, committed to the mentioned actions towards maximisation of the project’s impact.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CARBODIN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CARBODIN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.1.)

PINTA2 (2018)

IP1 Traction TD1 and Brakes TD5 – Phase 2

Read More  

Safe4RAIL-2 (2018)

Safe architecture for Robust distributed Application Integration in roLling stock 2

Read More  

PIVOT2 (2019)

Performance Improvement for Vehicles on Track 2

Read More