INSPIRE-GRID

Improved and eNhanced Stakeholders Participation In Reinforcement of Electricity Grid

 Coordinatore RICERCA SUL SISTEMA ENERGETICO - RSE SPA 

 Organization address address: Via Rubattino Raffaele 54
city: MILANO
postcode: 20134

contact info
Titolo: Dr.
Nome: Carlo
Cognome: Legramandi
Email: send email
Telefono: +39 02 3992 5317
Fax: +39 02 3992 5113

 Nazionalità Coordinatore Italy [IT]
 Totale costo 3˙496˙357 €
 EC contributo 2˙571˙834 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2013-1
 Funding Scheme CP
 Anno di inizio 2013
 Periodo (anno-mese-giorno) 2013-10-01   -   2016-09-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    RICERCA SUL SISTEMA ENERGETICO - RSE SPA

 Organization address address: Via Rubattino Raffaele 54
city: MILANO
postcode: 20134

contact info
Titolo: Dr.
Nome: Carlo
Cognome: Legramandi
Email: send email
Telefono: +39 02 3992 5317
Fax: +39 02 3992 5113

IT (MILANO) coordinator 529˙027.00
2    POTSDAM INSTITUT FUER KLIMAFOLGENFORSCHUNG

 Organization address address: Telegrafenberg 31
city: POTSDAM
postcode: 14412

contact info
Titolo: Ms.
Nome: Antonella
Cognome: Battaglini
Email: send email
Telefono: +49 30767719451

DE (POTSDAM) participant 439˙724.00
3    POLIEDRA CENTRI DI CONOSCENZA E FORMAZIONE DEL POLITECNICO DI MILANO

 Organization address address: PIAZZA LEONARDO DA VINCI 32
city: MILANO
postcode: 20133

contact info
Titolo: Ms.
Nome: Gabriella
Cognome: Atzeni
Email: send email
Telefono: +39 0223992900
Fax: +39 0223992911

IT (MILANO) participant 326˙880.00
4    EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH

 Organization address address: Raemistrasse 101
city: ZUERICH
postcode: 8092

contact info
Titolo: Prof.
Nome: Anthony
Cognome: Patt
Email: send email
Telefono: +41 44 632 58 92
Fax: +41 44 6321029

CH (ZUERICH) participant 257˙011.00
5    ASSOCIATION POUR LA RECHERCHE ET LE DEVELOPPEMENT DES METHODES ET PROCESSUS INDUSTRIELS - ARMINES

 Organization address address: Boulevard Saint-Michel 60
city: PARIS
postcode: 75272

contact info
Titolo: Mrs.
Nome: Florence
Cognome: Thepenier
Email: send email
Telefono: +33 1 40 51 93 85

FR (PARIS) participant 247˙280.00
6    RTE RESEAU DE TRANSPORT D ELECTRICITE SA

 Organization address address: Terrasse Bellini 1 Tour Initiale
city: LA DEFENSE CEDEX
postcode: 92919

contact info
Titolo: Mrs.
Nome: Amélie
Cognome: Lafragette
Email: send email
Telefono: +33 141021429

FR (LA DEFENSE CEDEX) participant 244˙387.00
7    RENEWABLES GRID GUG (HAFTUNGSBESCHRANKT) GMBH

 Organization address address: HAYDNSTRASSE 1
city: BERLIN
postcode: 12203

contact info
Titolo: Mrs.
Nome: Antina
Cognome: Sander
Email: send email
Telefono: +49 30 7677 19458

DE (BERLIN) participant 223˙686.00
8    IZES GGMBH

 Organization address address: ALTENKESSELER STRASSE 17
city: SAARBRUECKEN
postcode: 66115

contact info
Titolo: Mr.
Nome: Jan
Cognome: Hildebrand
Email: send email
Telefono: +49 6819762829
Fax: +49 681

DE (SAARBRUECKEN) participant 159˙506.00
9    STATNETT SF

 Organization address address: Nydalen Alle 33
city: OSLO
postcode: N-4904

contact info
Titolo: Mrs.
Nome: Bente
Cognome: Rudberg
Email: send email
Telefono: +47 90750280

NO (OSLO) participant 131˙925.00
10    NATIONAL GRID ELECTRICITY TRANSMISSION PLC

 Organization address address: THE STRAND 1-3
city: LONDON
postcode: WC2N 5EH

contact info
Titolo: Mr.
Nome: John
Cognome: Swanson
Email: send email
Telefono: +44 2070043134

UK (LONDON) participant 12˙408.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

decision    acceptance    stakeholders    benefits    lack    series    participation    eps    tsos    public    grid    infrastructure    infrastructures    impacts    of   

 Obiettivo del progetto (Objective)

'The basic assumption of the project is that the difficult public acceptance of Electric Power System (EPS) infrastructures are due to several reasons: i) the lack of trustworthiness in the relationship between Transmission System Operators (TSOs) and the stakeholders and general public; ii) the difficulty in comparing the new EPS infrastructures benefits, which are on a global, with the impacts , which are mostly “local”; iii) the perception of risks, threats and problems for the stakeholders, often neglected or scarcely recognized and understood by TSOs; iv) the lack of tools to facilitate the stakeholders and public participation to decision processes; v) the fragility or the complexity of the participatory processes, with the consequent very low effectiveness. The project idea, therefore, includes: 1. the analysis of the needs, concerns, wants and expectations of the stakeholders and general public 2. the development or adaptation of methodologies to assess impacts and benefits 3. the development of suitable processes for an effective communication and real participation of the stakeholders and general public 4. a series of case studies (taking into account geographical location, size of the infrastructure and stage of completion of the scheme), with a double aim: to give elements to the methodological activities and to allow a proper testing 5. a synthesis of the project results and a series of recommendations about the stakeholders and general public engagement 6. the dissemination of the project results and output The overarching goal of this proposal is to develop a methodology to manage the consultation in order to engage the stakeholders in the decision making process and to improve support of development of future grid infrastructure. Based on multidisciplinary approach, it is proposed to design and develop a European good practice guide lead by experts in the field of development of grid infrastructure, environmental and social acceptance issues.'

Altri progetti dello stesso programma (FP7-ENERGY)

SMART-FLEX (2013)

Demonstration at industrial scale of the FLeXible manufacturing of SMART multifunctional photovoltaic building elements

Read More  

GO-NEXTS (2012)

Graphene doping and texturing in efficient electrodes for organic solar cells

Read More  

STALLION (2012)

Safety Testing Approaches for Large Lithium-Ion battery systems

Read More