Opendata, web and dolomites

COFASTRANS

A FAST AND ECO-EFFICIENT TRANSHIPMENT SYSTEM FOR ULTRA LARGE CONTAINERVESSELS

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 COFASTRANS project word cloud

Explore the words cloud of the COFASTRANS project. It provides you a very rough idea of what is the project "COFASTRANS" about.

description    sales    innovative    smaller    handled    sources    savings    small    stakeholders    trading    portal    operations    capacity    running    irr    annual    period    container    ports    roadways    business    berths    ideally    sides    vessels    world    logistics    optimising    intermodal    flow    parties    aerodynamic    loading    stacks    ulcvs    fast    profile    ground    containers    investment    effect    services    suited    accommodating    ship    financial    quays    covers    wages    risk    benefits    hatch    cranes    throughput    local    npv    plan    human    unloading    cope    completion    dimensions    market    stowage    ultra    elevated    terminal    flows    line    indented    subsequent    economies    group    electricity    connections    arrangement    automated    global    calculation    details    cash    free    ordinary    conventional    environmental    imposed    lanes    placing    fuel    solution    trolley    terminals    payback    limitations    combination   

Project "COFASTRANS" data sheet

The following table provides information about the project.

Coordinator
BECKETT RANKINE LIMITED 

Organization address
address: 47-51 GILLINGHAM STREET
city: LONDON
postcode: SW1V 1HS
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.cofastrans.com.
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2014
 Duration (year-month-day) from 2014-10-01   to  2015-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BECKETT RANKINE LIMITED UK (LONDON) coordinator 50˙000.00

Map

 Project objective

The aim of the project is the design of an integrated intermodal system ideally suited for fast loading/unloading of the new Ultra Large Container Vessels and the subsequent fast terminal stowage of the containers. The proposed container terminal includes two major innovative concepts: a) a small number of indented berths for accommodating the new ULCVs which are handled by new multi-trolley portal container cranes enabling fast loading and unloading from both sides of the ship and b) a multi-level container terminal with ground running lanes, elevated container flow roadways and an innovative system for placing hatch covers. The above arrangement is proposed in combination with ordinary line quays with conventional container cranes for accommodating the smaller vessels. The business plan will include description of the new system, its equipment and operations, market analysis, logistics details, description of human resources, environmental benefits, financial risk assessment, calculation of costs and cash flows from sales of services, funding sources, NPV and IRR of the investment, payback period, effect of the new system on local economies, savings in electricity, fuel, wages, and increase in annual throughput capacity among various parties and stakeholders. Detail studies are going to be carried out in phase 2, providing results for the dimensions of the new portal cranes, their aerodynamic profile and connections and optimising container stacks and roadways around the indented berths and the use of automated systems. The completion of the project will provide a solution to the limitations of the existing container terminals to cope with the new ULCVs and will free the design of the ULCVs from limitations imposed by the capabilities of the current loading/unloading means. The proposed solution aims at the global container terminal market. European ports will be the main target group, although trading partners of EU in the world are also to be considered.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "COFASTRANS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "COFASTRANS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More