Opendata, web and dolomites

SDO-MET SIGNED

Automatic Rail Safety Solution

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SDO-MET project word cloud

Explore the words cloud of the SDO-MET project. It provides you a very rough idea of what is the project "SDO-MET" about.

install    public    railway    easier    1016    customers    willingness    manufacturers    first    automatic    de    whom    expressed    object    trains    engineers    5122    soa    detection    injuries    bombardiers    madrid    era    barcelona    feasibility    safe    suicides    metropolitan    agency    2973    lines    business    billion    ready    497    452    trade    brussels    helping    alternative    transport    siemens    platforms    efficient    pay    1800km    worldwide    platform    fatalities    goals    market    combined    prototype    innovative    met    confident    refine    sensors    strategy    distributors    euros    relations    2012    successful    2025    visual    maintaining    safer    automated    commercialization    protection    incidents    people    operators    total    1133    deaths    thales    rail    track    efficiency    security    metro    passengers    sdo    operation    cameras    collaborators    serious    plan    global    usher    create    provides    train    lower    scalability   

Project "SDO-MET" data sheet

The following table provides information about the project.

Coordinator
AUTOMATITZACIO DE PROCESSOS I MEDIAMBIENT SL 

Organization address
address: CARRER ANDORRA NAVE 2 22
city: SANT BOI DE LLOBREGAT
postcode: 8830
website: www.promaut.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.railsa.eu
 Total cost 1˙481˙155 €
 EC max contribution 1˙036˙808 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-04-01   to  2017-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AUTOMATITZACIO DE PROCESSOS I MEDIAMBIENT SL ES (SANT BOI DE LLOBREGAT) coordinator 1˙036˙808.00

Map

 Project objective

By 2025 1800km of rail lines will be automated worldwide. With the increase in automatic train operation comes the need to create an innovative platform and track protection system to ensure the security of passengers while maintaining increased efficiency in public transport. According to the European Railway Agency in 2012 there were a total of 5122 railway incidents involving people across Europe of which 1016 were serious injuries, 1133 were deaths and 2973 were suicides. The combined costs of fatalities and serious injuries cost the EU more than 1.5 billion euros in 2012. SDO-MET (Metro Object Detection System) is an innovative technology that aims at helping usher in the next era in automated public transport. Our platform and track security system provides a safer, lower cost, and easier to install alternative to current systems. Using an innovative system of sensors and cameras our goal is to make metro platforms and track areas safe and efficient for users and operators of automated trains. Our goals for phase 2 are to further develop and refine SDO-MET in order to have a market ready product. Our main focus, on a technical level, will be the implementation of the two SoA visual systems necessary for SDO-MET. The potential customers are the main operators of the railway sector such as Barcelona Metropolitan Transport, Metro de Madrid and Brussels Metro with whom we currently have trade relations. Other potential customers include project engineers and manufacturers /distributors of railway equipment such as SIEMENS, BOMBARDIERS, THALES, etc. During the development of our first prototype over the past 5 years we have developed a business plan and commercialization strategy. These and other feasibility activities, along with the willingness to pay already expressed by our collaborators, makes us confident that SDO-MET has market scalability and will be successful on a global scale. The potential worldwide market is for SDO-MET is 497 metro lines (452.7 B €).

 Deliverables

List of deliverables.
Surveillance System on the Platform Documents, reports 2019-05-30 12:46:57
Track Surveillance System Demonstrators, pilots, prototypes 2019-05-30 12:47:00
Installation, Operation and Maintenance Manual Documents, reports 2019-05-30 12:46:57
Communication Plan Definition Documents, reports 2019-05-30 12:46:57
Report on the Testing and Validation on station Documents, reports 2019-05-30 12:46:54

Take a look to the deliverables list in detail:  detailed list of SDO-MET deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SDO-MET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SDO-MET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

GT WHR system (2015)

Green Turbine WHR System

Read More  

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More