Opendata, web and dolomites

CUBETTO

New CUBic shElter concepT TO foster living responses

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CUBETTO project word cloud

Explore the words cloud of the CUBETTO project. It provides you a very rough idea of what is the project "CUBETTO" about.

streamlining    solutions    poor    found    roughly    rural    complete    modules    25    projections    people    32    guarantees    channels    bent    giving    market    emergency    urban    profitability    components    border    human    spf    psychological    materials    circumstances    estimate    tested    model    repositioning    investment    analyze    removal    contexts    allowed    economic    business    resilience    panels    post    deployment    conflict    home    installation    works    companies    technologies    environment    displaced    million    intervention    environmental    financial    housing    social    fifth    living    security    efficiency    crowded    material    building    locally    precise    zones    first    esteem    cubetto    recognition    energy    definition    awarded    bed    worth    standardize    billion    routes    roi    structure    solution    contest    supply    answer    considering    construction    migration    scenarios    global    practical    made    highest    plate    endorsement    shelter    urgent    imperative    organization    full   

Project "CUBETTO" data sheet

The following table provides information about the project.

Coordinator
ECOBUILDING SRL 

Organization address
address: CORSO CAVOUR 76
city: ZEVIO (VR)
postcode: 37059
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.ecobuildingsrl.it/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.7. (Secure societies - Protecting freedom and security of Europe and its citizens)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-05-01   to  2016-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ECOBUILDING SRL IT (ZEVIO (VR)) coordinator 50˙000.00

Map

 Project objective

The Cubetto project aims to standardize and offer the first comprehensive bottom-up answer to displaced people living needs, being the first construction model of a shelter made of concrete materials that guarantees: full construction with human and material resources found locally; easy installation, removal and repositioning of all modules (concrete panels, SPF and bent plate structure); highest level of security; energy efficiency and environmental resilience. CUBETTO will impact the urgent emergency problems in EU's border areas, as it's the first process and technologies based solution to provide a shelter that is more a home than a bed, giving a complete European response to practical, psychological and social problems of the global housing needs affecting people living in conflict zones, migration routes, crowded urban and poor rural areas. First results achieved with our tested construction model (awarded in European contest of housing solutions) and the endorsement of companies interested in our building concept, brought us target the sector in which the housing need is higher and imperative. A first recognition of global market opportunities (worth to 4 billion in the next five years) and the overall definition of our shelter model features, have allowed us to roughly evaluate the investment needed (€ 1.25 million) and first deployment projections based on our capabilities, to estimate an overall ROI of 3.32 in the fifth year. In this phase the objective is to assess how to improve the building organization method to standardize the intervention in post-emergency contexts and in crowded urban areas, considering different scenarios for materials use, supply and works streamlining; on the other side we aim to analyze the problematic circumstances in their practical and social components, the intervention procedures and exploitation channels in each environment, along with the precise esteem of economic and financial profitability of the business model.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CUBETTO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CUBETTO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.7.;H2020-EU.2.3.1.)

SRAP (2018)

Safe and Readily Authenticated Pharmaceutical dosage forms (tablets)

Read More  

Quakebots (2018)

Artificial Intelligence and IoT for seismic monitoring

Read More  

SIGAGuard (2018)

Cybersecurity anomaly detection solution for critical infrastructures

Read More