Opendata, web and dolomites

iReact-NG

iReact-NG

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 iReact-NG project word cloud

Explore the words cloud of the iReact-NG project. It provides you a very rough idea of what is the project "iReact-NG" about.

optimized    grids       installed    electricity    compensation    market    grid    operations    brings    harmonization    co2    optimum    automatically    methodology    technologies    drives    energy    presenting    apart    imbalance    demand    approval    tool    gr    remotely    distributed    15    solution    operators    20    certain    introduce    technological    power    decision    historical    ai    emtech    150    fused    operator    installations    offers    inform    statistical    appears    happen    substations    landscape    supply    monitoring    poor    emissions    smart    res    benefits    utilities    disruptive    scenario    substation    either    remote    regulate    automation    innovation    interaction    complicated    ict    near    instability    savings    capacity    scenarios    parallel    losses    alerting    greek    possibilities    load    time    command    reactive    controllers    automated    released    voltage    delivered    performance    transmission    ireact    simulations   

Project "iReact-NG" data sheet

The following table provides information about the project.

Coordinator
EMTECH DIASTIMIKI MONOPROSOPI IDIOTIKI ETAIREIA 

Organization address
address: KORINTHOU 32
city: METAMORFOSI ATHENS
postcode: 14451
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Greece [EL]
 Project website http://www.ireact.gr
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-08-01   to  2017-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EMTECH DIASTIMIKI MONOPROSOPI IDIOTIKI ETAIREIA EL (METAMORFOSI ATHENS) coordinator 50˙000.00

Map

 Project objective

Apart from presenting major benefits, the increase of RES installations in the electricity grid brings certain technological challenges, such as power supply and demand imbalance, and voltage instability, which in certain cases, drives to poor delivered electricity product. Based on ICT, AI and automation technologies, the “smart-grid” appears as a disruptive methodology able to regulate the complicated energy distribution landscape. Today, EMTECH offers the iReact (www.ireact.gr), as a smart-grid component to facilitate automated reactive load compensation in power distribution substations. The solution has been adopted by the Greek Transmission System Operator, and is now installed in more than 150 substations. The achieved benefits are 8% reduction in energy losses, 15% increase of released system capacity, remote monitoring, alerting and control. The objective of the proposed innovation by enhancing iReact (iReact 2.0), is to introduce in the market a real-time decision support & control tool for optimized operations in distribution grids, i.e. to extent utilization of the solution, not only in the distribution substation, but into the distribution grid as well. Based on real-time parallel simulations (near-future), fused with historical information (past), and real-time measurements and control (present), the tool shall inform smart-grid operators about near-future optimized operational scenarios, along with statistical possibilities to happen and the estimated benefits if applied. The application, either automatically or after user’s approval, shall remotely command all distributed controllers, installed in the distribution substation & RES and shall apply the selected operational scenario. Benefits achieved shall be optimum performance of the distribution grid, higher energy loss savings (up to 15-20%) thus reduction of CO2 emissions, better electricity delivered to end-users, and harmonization of the operational interaction between utilities and RES.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IREACT-NG" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "IREACT-NG" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

SRE (2017)

Smart roof edge technology

Read More  

RenGen (2017)

Onsite, On-demand, Self-standing Cost Competitive Zero-Carbon Power Generation

Read More