Opendata, web and dolomites

PIVOT SIGNED

Performance Improvement for Vehicles on Track

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PIVOT project word cloud

Explore the words cloud of the PIVOT project. It provides you a very rough idea of what is the project "PIVOT" about.

levels    luggage    materials    home    innovative    brakes    roll2rail    cab    persons    mobility    constraints    safety    fmeca    plug    carbody    manufacturing    trackable    acoustic    architecture    innovation    authorisation    reliability    tables    eacute    sufficient    modular    innovatively    takes    monitoring    robustness    sensor    quick    risk    gap    drive    friction    develops    motivating    techniques    adjusting    wp6    joining    affordable    electronics    components    achievable    vehicle    driver    gear    themes    wp7    spaces    progresses    wp2    wps    uses    pairs    demonstrator    electro    mass    suspension    smart    active    eddy    running    certification    deals    giving    entry    covers    play    reconfiguration    mechanical    seven    wp3    cor    door    wins    virtual    recyclability    demands    fillers    integrity    wp5    insulation    seat    generally    focusses    cabs    performance    interiors    attenuation    racks    carbodies    passenger    easier    surveillance    explores    improvement    tangible    wp4    solutions    vehicles    considering    hardware    reparability    functions    wp1    specification    brake    arising    lighthouse    engineering    alternative    flexible    context    sustainability    interface    conceptual    facets    rail    health    scope    assessments    structural    pivot    innovations   

Project "PIVOT" data sheet

The following table provides information about the project.

Coordinator
BOMBARDIER TRANSPORTATION GMBH 

Organization address
address: EICHHORNSTRASSE 3
city: BERLIN
postcode: 10785
website: www.bombardier.de/en/transportation

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website https://projects.shift2rail.org/s2r_ip1_n.aspx
 Total cost 7˙746˙802 €
 EC max contribution 7˙746˙802 € (100%)
 Programme 1. H2020-EU.3.4.8.1. (Innovation Programme 1 (IP1): Cost-efficient and reliable trains)
 Code Call H2020-S2RJU-CFM-2017
 Funding Scheme Shift2Rail-RIA
 Starting year 2017
 Duration (year-month-day) from 2017-10-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BOMBARDIER TRANSPORTATION GMBH DE (BERLIN) coordinator 955˙681.00
2    FAIVELEY TRANSPORT TOURS SAS FR (SAINT-PIERRE-DES-CORPS CEDEX) participant 1˙305˙647.00
3    KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH DE (MUNCHEN) participant 945˙776.00
4    PATENTES TALGO SL ES (LAS ROZAS DE MADRID) participant 942˙127.00
5    Aernnova Aerospace S.A.U. ES (MIÑANO (ALAVA)) participant 742˙231.00
6    SIEMENS MOBILITY GMBH DE (MUNCHEN) participant 658˙756.00
7    Construcciones y Auxiliar de Ferrocarriles, S.A. ES (Beasain) participant 447˙955.00
8    SNCF MOBILITES FR (ST DENIS) participant 387˙961.00
9    FUNDACION TECNALIA RESEARCH & INNOVATION ES (DERIO BIZKAIA) participant 297˙540.00
10    SIEMENS AKTIENGESELLSCHAFT DE (MUNCHEN) participant 261˙000.00
11    FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE MATERIALES COMPUESTOS ES (Getafe) participant 245˙586.00
12    TRAFIKVERKET - TRV SE (BORLANGE) participant 226˙644.00
13    VIRTUAL VEHICLE RESEARCH GMBH AT (GRAZ) participant 93˙330.00
14    NETWORK RAIL INFRASTRUCTURE LIMITED UK (LONDON) participant 79˙992.00
15    ALSTOM TRANSPORT SA FR (SAINT OUEN) participant 75˙786.00
16    DEUTSCHE BAHN AG DE (BERLIN) participant 63˙011.00
17    CP - COMBOIOS DE PORTUGAL EPE PT (LISBOA) participant 17˙776.00

Map

 Project objective

PIVOT takes the Roll2Rail Lighthouse project and addresses mechanical systems within rail vehicles: Carbodies, Running Gear, Brakes, Entry Systems and Interiors including the Cab. With seven technical WPs, it uses a system engineering approach, giving innovations tangible context considering real interface constraints. It includes specific, trackable, relevant, achievable and motivating quick wins which focus attention and drive home innovation. • WP1 explores the materials, joining techniques and manufacturing for innovative carbodies. It seeks to develop a risk-assessed demonstrator specification. • WP2 develops conceptual carbody components for alternative materials. It includes structural/non-structural assessments, FMECA and a sustainability assessment of facets like reparability and recyclability. • WP3 focusses on smart solutions for running gear considering functions such as health monitoring and active suspension systems. These include new sensor system architecture and affordable hardware providing sufficient reliability and robustness. • WP4 addresses running gear performance more generally. It seeks to develop a common technical specification, to innovatively use both new and existing materials and to scope the authorisation demands arising. • WP5 progresses innovations such as electronics with high Safety Integrity Levels, eddy current brakes, new friction pairs, electro mechanical brake solutions and virtual certification. • WP6 covers entry systems with themes including gap fillers, door entry surveillance, solutions for Persons of Reduced Mobility and performance improvement through mass reduction, improved insulation and higher acoustic attenuation. • WP7 deals with modular interiors both for passenger spaces and cabs and aims make vehicle reconfiguration easier. Topics include flexible systems for adjusting tables, seat, luggage racks and the general décor, and ‘plug and play’ systems within the driver’s cab.

 Deliverables

List of deliverables.
Set up public website Documents, reports 2020-01-30 20:03:10
Specification of Entrance System Documents, reports 2020-01-30 20:03:10
Technical revision of inputs developed in previous project Documents, reports 2020-01-30 20:03:10

Take a look to the deliverables list in detail:  detailed list of PIVOT deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Thierry Montanié Fabien Vautier Valérie Klein Florian Brion Axel Krüger Martin Dombrowsky Ronny Hinz Siemens Thomas Vogels Jörg Schnaibel Maxime Dermenghem Robert Dumortier Michael Lehner Martin Ramsner Miguel Seco Xavier Valor Javier Arrabal Roberto Guzman
D6.1 - Specification of Entrance System
published pages: , ISSN: , DOI:
2020-01-30
2018 Paul Böttcher Dietmar Kraft Asier Alonso Pazos Gabriel Palacios Roblizo Eduardo de la Guerra Ochoa Robert Dumortier Thierry Montanié
PIVOT project factsheet
published pages: , ISSN: , DOI:
2020-01-30
2018 Eduardo de la Guerra Lidia Zubia Patrick Jumin Aurélie Goude
D1.1 Technical Revision of Inputs Developed in Previous Project
published pages: , ISSN: , DOI:
2020-01-30
2018 Paul Böttcher Carlos Eraso Alvarez Eduardo de la Guerra Ochoa Asier Alonso Pazos Gabriel Palacios Roblizo Susanne Schmidt Thierry Montanie Robert Dumortier Herman Bertrand
PIVOT brochure
published pages: , ISSN: , DOI:
2020-01-30

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PIVOT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PIVOT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.1.)

CONNECTA-2 (2018)

CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2.

Read More  

PINTA2 (2018)

IP1 Traction TD1 and Brakes TD5 – Phase 2

Read More  

PIVOT2 (2019)

Performance Improvement for Vehicles on Track 2

Read More