Opendata, web and dolomites

GRASSHOPPER SIGNED

GRid ASsiSting modular HydrOgen Pem PowER plant

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GRASSHOPPER project word cloud

Explore the words cloud of the GRASSHOPPER project. It provides you a very rough idea of what is the project "GRASSHOPPER" about.

unites    incl    suppliers    demand    dsm    fcpp    polimi    generation    improvements    implementing    stacks    modulation    below    2mw    manufacturability    fast    accomplishing    engaging    infrastructure    components    operated    rate    inverters    combining    meas    pv    dynamic    efficiency    innovative    size    power    industrially    demcopem    commercialization    renewables    fuel    advisory    area    board    ai    pilot    eur    environment    25    newly    tso    header    capex    members    gas    shelf    balance    stack    maximises    grasshopper    pt    demonstrated    services    1500    optimisation    benefits    coherent    jmfc    kwe    cell    active    loading    dso    pressures    energy    output    streamlining    grid    proposition    mea    pem    off    committed    simplified    stakeholders    months    module    tackles    mw    delivered    yearly    business    plant    sub    smart    bop    integrators    manifolds    create    too    flexible    market    reducing    material    operation    participate    zbt    kw    density    integration    nfct    site    inea    modular    mwe   

Project "GRASSHOPPER" data sheet

The following table provides information about the project.

Coordinator
INEA INFORMATIZACIJA ENERGETIKA AVTOMATIZACIJA DOO 

Organization address
address: STEGNE 11
city: LJUBLJANA
postcode: 1000
website: www.inea.si

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Slovenia [SI]
 Project website http://www.grasshopperproject.eu
 Total cost 4˙387˙063 €
 EC max contribution 4˙387˙063 € (100%)
 Programme 1. H2020-EU.3.3.8.1. (Increase the electrical efficiency and the durability of the different fuel cells used for power production to levels which can compete with conventional technologies, while reducing costs)
 Code Call H2020-JTI-FCH-2017-1
 Funding Scheme FCH2-RIA
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2020-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    INEA INFORMATIZACIJA ENERGETIKA AVTOMATIZACIJA DOO SI (LJUBLJANA) coordinator 376˙500.00
2    NEDSTACK FUEL CELL TECHNOLOGY BV NL (ARNHEM) participant 1˙312˙875.00
3    ABENGOA HIDROGENO SA ES (SEVILLA) participant 1˙296˙375.00
4    JOHNSON MATTHEY FUEL CELLS LIMITED UK (LONDON) participant 591˙878.00
5    ZENTRUM FUR BRENNSTOFFZELLEN-TECHNIK GMBH DE (DUISBURG) participant 499˙060.00
6    POLITECNICO DI MILANO IT (MILANO) participant 310˙375.00

Map

 Project objective

The GRASSHOPPER project aims to create a next-generation MW-size Fuel Cell Power Plant unit (FCPP), which is more cost-effective and flexible in power output, accomplishing an estimated CAPEX below 1500 EUR/kWe at a yearly production rate of 25 MWe. Large MW size PEM FCPP have been demonstrated, such as in the DEMCOPEM-2MW project, however at too high Capex level and without dynamic operation features for grid support. Grasshopper tackles these issues enabling a controlled, renewables-based energy infrastructure. The power plant will be demonstrated in the field as 100 kW sub-module pilot plant, implementing newly developed stacks, MEA’s and BoP system components, combining benefits of coherent design integration. Cost and technical optimisation will be achieved with improvements targeting MEAs (increasing current density, active area, reducing material costs incl. Pt loading), stack design (increasing stack size, power density and operating pressures, while streamlining manufacturability) and overall system balance of plant (modular design, simplified header and manifolds for gas distribution, high efficiency PV inverters, using off-the-shelf equipment where possible). This unit will be operated continuously for 8 months in industrially-relevant environment for engaging grid support modulation as part of an established on-site Demand Side Management (DSM) programme. This consortium unites component suppliers (JMFC, NFCT), research institutions (ZBT, Polimi) and integrators (AI, INEA) who will partner with existing energy market stakeholders (DSO, TSO) and EU smart grid projects committed to participate as advisory board members. This collaboration maximises the business case value proposition, by ensuring the delivered technology will respond to grid services’ requirements for flexible dynamic power operation. Innovative DSM programmes will be completed to establish the best path forward for commercialization of the technology for a fast response FCPP.

 Deliverables

List of deliverables.
Project leaflet Documents, reports 2019-11-22 12:01:23

Take a look to the deliverables list in detail:  detailed list of GRASSHOPPER deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GRASSHOPPER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GRASSHOPPER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.8.1.)

RUBY (2020)

Robust and reliable general management tool for performance and dUraBility improvement of fuel cell stationarY units

Read More  

LOWCOST-IC (2019)

Low Cost Interconnects with highly improved Contact Strength for SOC Applications

Read More  

RoRePower (2019)

Robust and Remote Power Supply

Read More