Opendata, web and dolomites

POWERSWAP SIGNED

Fully robotic system for swapping electric car batteries within 3 minutes.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 POWERSWAP project word cloud

Explore the words cloud of the POWERSWAP project. It provides you a very rough idea of what is the project "POWERSWAP" about.

our    give    bit    boost    added    off    smart    powerswap    sources    suitable    swap    network    zoe    return    company    balancing    battery    employment    additional    saving    engines    2024    china    cars    definite    efficient    ders    group    proprietary    robotic    players    flexibly    kilo    didi    vast    grid    market    car    taxi    reaching    solar    charging    encourage    services    supplier    social    turnover    storage    200    sme    green    environment    demonstration    accelerating    pressure    electric    distributed    automated    wind    clean    puts    engaged    minimizing    minutes    28m    energy    batteries    combustion    healthy    smaller    chinese    power    infrastructure    synchronization    time    mobility    ev    stimulate    surges    global    uninterrupted    lifetime    harmonious    urban    bold    grow    transport    huge    elimination    amount    peak    jobs    storages    stockholm    lengthens    transportation    renault    sound   

Project "POWERSWAP" data sheet

The following table provides information about the project.

Coordinator
POWERSWAP AB 

Organization address
address: BOX 24 137
city: STOCKHOLM
postcode: 104 51
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.powerswap.se
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-03-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    POWERSWAP AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

Our proprietary robotic technology can swap the 200 kilo car battery in a bit more than 2 minutes, saving vast amount of time and ensuring uninterrupted mobility. Batteries go to the battery storage where they can get suitable time for a harmonious charging at peak-off time. This lengthens their lifetime and puts much smaller pressure on the electric grid, allowing for the efficient management of power system and smart synchronization with distributed green energy resources (DERs) in power grid. Powerswap makes the bold step forward addressing challenges related to smart and clean e-mobility as charging time of batteries in battery storage can be flexibly adapted, minimizing additional pressure on power systems. Our automated batteries storages can also provide “grid balancing” services and return power to the grid at a time when managing the network is becoming increasingly complex as variable sources of wind and solar power grow. Our project will have a huge social added value by creating healthy urban environment and accelerating the development of clean transport systems based on electric cars. Powerswap will give the EU EV infrastructure a major boost and encourage new surges in EV transportation leading to definite elimination of combustion engines. We have engaged in the project well-known global market players: Renault (Renault Zoe), Sound Group (major supplier of batteries in China), Taxi Stockholm (will use our cars in the demonstration phase) and Didi (Chinese smart transportation company). The project will also have a vast impact on the applying SME and will stimulate its growth with a potential of reaching a turnover of €28M for in year 2024, and increasing employment by 40 jobs in the same year.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "POWERSWAP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "POWERSWAP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More  

Day-by-day (2017)

Day-by-Day Short-Term Traffic Forecasts for Road Concessions (top app)

Read More  

ZAP (2017)

ZAPINAMO – Affordable, future-proof rapid charging infrastructure for electric vehicles from stored[clean and economical] energy

Read More