Opendata, web and dolomites

HiVOLT SIGNED

HIGH-VOLTAGE LITHIUM STORAGE - secure + efficient battery storage solution of the next generation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 HiVOLT project word cloud

Explore the words cloud of the HiVOLT project. It provides you a very rough idea of what is the project "HiVOLT" about.

time    50    things    tesla    investment    e3dc    obstacle    experts    provision    causes    compensate    growing    supply    made    commercial    transformers    cycles    energy    establishing    currents    newly    hivolt    fluctuations    grids    more    revolutionize    reflected    secure    electricity    92    global    east    lower    demand    danger    amounts    market    asia    burdened    volatile    sme    bn    depending    performance    blackout    day    storage    least    voltage    lithium    flexible    guarantee    eliminating    byd    penetration    wind    usa    33    outstanding    serial       trl7    570    advantages    reached    full    ratio    network    ready    efficiency    solar    constantly    describes    max    energies    met    biggest    commercialization    technologically    fed    worldwide    offers    charge    flexibility    reducing    renewable    intelligent    conventional    battery    price    size    weather    savings    discharge    enterprises    share    series    storages    economic    pillar    tesvolt   

Project "HiVOLT" data sheet

The following table provides information about the project.

Coordinator
TESVOLT GMBH 

Organization address
address: AM HEIDEBERG 31
city: LUTHERSTADT WITTENBERG
postcode: 6886
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website https://www.high-volt.eu
 Total cost 3˙078˙500 €
 EC max contribution 2˙154˙950 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-10-01   to  2020-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TESVOLT GMBH DE (LUTHERSTADT WITTENBERG) coordinator 2˙154˙950.00

Map

 Project objective

The share of renewable energies such as wind and solar energy, which is fed into the electricity grids, is constantly increasing worldwide. This type of energy is highly volatile, and depending on the time of day and the weather they supply different amounts of energy. This causes two problems: 1. the energy grids are being burdened more and more - the blackout danger is growing! 2. The electricity is not available as required. That is why we need a highly flexible system in the future to compensate these fluctuations, to be able to guarantee a secure energy network and the provision of electricity on demand. Technologically, battery storages can provide this flexibility, but the price/performance ratio is still the biggest obstacle for a full market penetration. HiVOLT describes a newly developed battery system based on high-voltage technology, which offers significant cost and efficiency advantages compared to conventional systems. Savings are achieved, among other things, by eliminating transformers and reducing system costs through lower currents. The impact of the technology is outstanding and has the potential to revolutionize the storage market. This is reflected in the outstanding economic efficiency of the high-voltage lithium storage. It is at least 33% higher compared to TESLA, BYD, E3DC and results from the following factors: Higher number of charge cycles (8,000), max. depth of discharge, higher energy efficiency (92%), low investment costs (570 €/kWh) and low system costs (50% reduction). In SME Phase 2, the product is to be made ready for series. Serial production and commercialization are to be carried out. Commercial enterprises in i.a. Europe, East Asia and USA are to be reached (market size: 1.1 bn €). The high-voltage lithium storage (TRL7) was developed by TESVOLT GmbH. The global challenge of establishing renewable energies as the main pillar of energy supply can only be met with intelligent energy storages. TESVOLT -The energy storage experts.

 Deliverables

List of deliverables.
Integration of the project on the homepage (with newsbox) Websites, patent fillings, videos etc. 2020-02-12 16:53:09

Take a look to the deliverables list in detail:  detailed list of HiVOLT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "HIVOLT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "HIVOLT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DNA DS (2019)

DNA Data storage

Read More  

Totem Spoon (2019)

Interactive Digital Signage with emotional intelligence for smart cities

Read More  

DeltaQon (2019)

IOT and cloud computing for online medical analysis service platform

Read More