Opendata, web and dolomites

MORE-CONNECT SIGNED

Development and advanced prefabrication of innovative, multifunctional building envelope elements for MOdular REtrofitting and CONNECTions

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 MORE-CONNECT project word cloud

Explore the words cloud of the MORE-CONNECT project. It provides you a very rough idea of what is the project "MORE-CONNECT" about.

days    series    market    sustainable    innovative    investment    total    objective    zero    innovation    envelope    standardized    extra    physics    individual    models    services    geo    diagnostics    air    enhanced    potentials    shop    performances    industrial    renovation    electric    return    solutions    nze    components    connections    nearly    materials    sensors    technologies    combinations    cluster    environment    energy    prefab    demands    stop    indoor    detailing    guarantee    healthy    airtight       inventories    multifunctional    aesthetics    durable    buildings    envelop    limitation    smart    mass    executions    link    connect    business    tools    wireless    performance    assembly    safety    accessibility    manufacturing    industrialized    modular    connection    climate    steering    clusters    made    mechanical    bim    building    hydraulic    communicate    play    joints    tailor    time    webbased    geomatics    individuals    maximum    saving    processed    offers    quality    integration    plug    prefabricated   

Project "MORE-CONNECT" data sheet

The following table provides information about the project.

Coordinator
Huygen Installatie Adviseurs 

Organization address
address: Parkweg 22b
city: Maastricht
postcode: 6200AM
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website http://www.more-connect.eu
 Total cost 5˙634˙810 €
 EC max contribution 4˙364˙748 € (77%)
 Programme 1. H2020-EU.3.3.1. (Reducing energy consumption and carbon foorpint by smart and sustainable use)
 Code Call H2020-EE-2014-1-PPP
 Funding Scheme IA
 Starting year 2014
 Duration (year-month-day) from 2014-12-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    Huygen Installatie Adviseurs NL (Maastricht) coordinator 442˙921.00
2    TALLINNA TEHNIKAULIKOOL EE (TALLINN) participant 745˙900.00
3    CENERGIA ENERGY CONSULTANTS APS DK (Herlev) participant 474˙476.00
4    TIMMERFABRIEK WEBO BV NL (RIJSSEN) participant 407˙907.00
5    CESKE VYSOKE UCENI TECHNICKE V PRAZE CZ (PRAHA) participant 337˙930.00
6    RIGAS TEHNISKA UNIVERSITATE LV (RIGA) participant 330˙450.00
7    INNOGIE APS DK (IKAST) participant 226˙222.00
8    INVELA DK (SLAGELSE) participant 223˙212.00
9    BJW BV NL (RIJSSEN) participant 204˙356.00
10    GAIURB - URBANISMO E HABITACAO EM PT (VILA NOVA DE GAIA) participant 196˙090.00
11    STICHTING ZUYD HOGESCHOOL NL (HEERLEN) participant 137˙756.00
12    UNIVERSIDADE DO MINHO PT (BRAGA) participant 135˙485.00
13    MATEK AS EE (TALLINN) participant 103˙600.00
14    RD RYMAROV SRO CZ (RYMAROV) participant 100˙502.00
15    REF EHITUSTOOD OU EE (TALLINN) participant 93˙800.00
16    ZEMGALES TEHNOLOGISKAIS CENTRS LV (Jelgava) participant 78˙925.00
17    DARKGLOBE PT (ALMANCIL) participant 68˙337.00
18    LATVIAN WOOD CONSTRUCTION CLUSTER LV (RIGA) participant 56˙875.00
19    ECONCEPT AG CH (ZURICH) participant 0.00

Map

 Project objective

Objective is to develop and to demonstrate technologies and components for prefabricated modular renovation elements in five geo-clusters in Europe. This includes prefabricated durable, innovative, modular composed building envelope elements for the total building envelop for the renovation market, including the prefab integration of multifunctional components for climate control, energy saving, building physics and aesthetics, with advanced easy to use plug&play connections (mechanical, hydraulic, air, electric, prefab airtight joints). MORE-CONNECT offers tailor-made renovation concepts, from a standardized industrialized manufacturing and assembly process, in a one-shop-stop concept to the end-user, with a nearly zero energy performance of the total modular renovation concepts, a maximum return on investment less than 8 years and with a limitation of the total renovation time of 5 days. The concept offers performance guarantee for individual energy use and the quality of the indoor environment. Product innovation includes the selection of sustainable materials and sustainable detailing. A specific feature is the development of Plug & Play connection of modular components. Smart combinations of components and executions ensure extra performances for NZE concepts, healthy indoor environment, safety, accessibility. Components communicate by integrated (wireless) sensors and control components for performance diagnostics and control. Process innovation will be achieved by the use of advanced geomatics to make inventories of buildings. Webbased tools will link building characteristics, building (energy) potentials, and end-users demands to program requirements. This will be processed in BIM systems for the steering industrial process and enhanced quality control. This makes it possible to make tailor-made solutions for individuals, in mass production (n =1 series). Business models and advanced energy services (one-stop-shop) will be developed for each geo cluster.

 Deliverables

List of deliverables.
Specifications of design process Demonstrators, pilots, prototypes 2019-04-08 09:13:54
Modular prefab integrated HVAC units Demonstrators, pilots, prototypes 2019-04-08 09:13:54
BIM application Demonstrators, pilots, prototypes 2019-04-08 09:14:15
Guide of material alternatives in relation to reuse Documents, reports 2019-04-08 09:14:34
Sets of embedded integrated control systems Demonstrators, pilots, prototypes 2019-04-08 09:14:28
Pre-selection of favourable concepts to market Other 2019-04-08 09:14:03
Advanced controls for the modular elements Demonstrators, pilots, prototypes 2019-03-18 13:45:29
A set of smart Plug & Play connectors Demonstrators, pilots, prototypes 2019-04-08 09:14:47
A set of basic modular facade and roof elements Demonstrators, pilots, prototypes 2019-03-18 13:45:29
Guide with concepts of renovation packages Demonstrators, pilots, prototypes 2019-04-08 09:14:21
A set of Initial performance criteria and requirements Documents, reports 2019-04-08 09:14:53
Project flyer Websites, patent fillings, videos etc. 2019-04-08 09:26:45
MORE-CONNECT corporate identity Websites, patent fillings, videos etc. 2019-04-08 09:26:39
Overview of main building types in 4 EU regions Documents, reports 2019-04-08 09:26:52
Preparations for the pilots Demonstrators, pilots, prototypes 2019-04-08 09:14:09
Production and construction specifications Demonstrators, pilots, prototypes 2019-04-08 09:14:40
Installation of the Project Advisory Board and national soundboard groups Other 2019-04-08 09:15:23
Method for digital inventory of buildings based on advanced geomatics Demonstrators, pilots, prototypes 2019-04-08 09:14:21

Take a look to the deliverables list in detail:  detailed list of MORE-CONNECT deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Pihelo, P.; Kalamees, T.; Kuusk, K
Prefabricated wooden modular elements for nZEB renovation
published pages: , ISSN: , DOI:
2019-09-04
2018 Belmonte, J. F. Barbosa, R. Almeida, Manuela Guedes de
Influence of occupants behavior on indoor air quality of a naturally ventilated multifamily building in Porto, Portugal
published pages: , ISSN: , DOI:
1st International Conference on Data for Low Energy Buildings 2019-09-04
2017 Peep Pihelo, Targo Kalamees, Kalle Kuusk
nZEB Renovation with Prefabricated Modular Panels
published pages: 1006-1011, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2017.09.708
Energy Procedia 132 2019-09-04
2016 Mestre, Ana; Iten, Muriel; Almeida, Manuela Guedes de
Soluções de reabilitação de fachadas como contributo para assegurar os nZEB – um caso de estudo em Portugal
published pages: , ISSN: , DOI:
1 2019-09-04
2018 Simona D’Oca, Annarita Ferrante, Clara Ferrer, Roberta Pernetti, Anna Gralka, Rizal Sebastian, Peter op ‘t Veld
Technical, Financial, and Social Barriers and Challenges in Deep Building Renovation: Integration of Lessons Learned from the H2020 Cluster Projects
published pages: 174, ISSN: 2075-5309, DOI: 10.3390/buildings8120174
Buildings 8/12 2019-09-04
2018 Barbosa R., Almeida, Manuela G.
A prefabricação modular na reabilitação energética como contributo para assegurar edifícios nZEB
published pages: , ISSN: 1678-8621, DOI:
Edifícios e Energia 2019-09-04
2018 Targo Kalamee, Peep Pihelo
Deep energy renovation of old concrete apartment building to nZEB by using wooden modular elements
published pages: , ISSN: , DOI:
II Forum-Holzbau Polska in 2018 – II Międznarodowa Konferencja Forum Holzbau Polska 2018 2019-09-04
2016 Pihelo, P.; Lelumees, M.; Kalamees, T.
Potential of Moisture Dry-out from Concrete Wall in Estonian Climate.
published pages: , ISSN: , DOI:
International RILEM Conference on Materials, Systems and Structures in Civil Engineering. Conference segment on Moisture in Materials and Structures. 2019-03-18
2015 Kalle Kuusk, Targo Kalamees
nZEB Retrofit of a Concrete Large Panel Apartment Building
published pages: 985-990, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2015.11.038
Energy Procedia 78 2019-03-18
2016 Kuusk K., Kalamees T., Pihelo P.
Experiences from Design Process of Renovation of Existing Apartment Building to nZEB.
published pages: , ISSN: , DOI:
CLIMA 2016 - proceedings of the 12th REHVA World Congress: volume 1. 2019-03-18
2017 Ove Christen Mørck
Energy saving concept development for the MORE-CONNECT pilot energy renovation of apartment blocks in Denmark
published pages: 240-251, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2017.11.139
Energy Procedia 140 2019-03-18
2016 Jurgis Zemitis, Anatolijs Borodinecs, Aleksandrs Geikins, Targo Kalamees, Kalle Kuusk
Ventilation System Design in Three European Geo Cluster
published pages: 285-293, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2016.09.151
Energy Procedia 96 2019-03-18
2016 Op’t Veld P., Kalamees T., Rovers R.
MORE-CONNECT: New developments in prefabricated multifunctional building envelope elements and installation platforms for NZE renovation.
published pages: , ISSN: , DOI:
CLIMA 2016 - proceedings of the 12th REHVA World Congress: volume 1 2019-03-18
2016 Ove Christen Mørck
Concept Development and Technology Choices for the More-connect Pilot Energy Renovation of Three Apartment Blocks in Denmark
published pages: 738-744, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2016.09.136
Energy Procedia 96 2019-03-18
2016 M. Faltýnová, E. Matoušková, J. Šedina, K. Pavelka
BUILDING FACADE DOCUMENTATION USING LASER SCANNING AND PHOTOGRAMMETRY AND DATA IMPLEMENTATION INTO BIM
published pages: 215-220, ISSN: 2194-9034, DOI: 10.5194/isprsarchives-XLI-B3-215-2016
ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences XLI-B3 2019-03-18
2016 Peep Pihelo, Magnus Lelumees, Targo Kalamees
Influence of Moisture Dry-out on Hygrothermal Performance of Prefabricated Modular Renovation Elements
published pages: 745-755, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2016.09.137
Energy Procedia 96 2019-03-18
2017 Rovers, R
ZEB retrofit: embodied energy as descisive parameter and proxy
published pages: , ISSN: , DOI:
5th International Exergy, Life Cycle Assessment, and Sustainability Workshop & Symposium 2019-03-18
2015 Peter Op ‘t Veld
MORE-CONNECT: Development and Advanced Prefabrication of Innovative, Multifunctional Building Envelope Elements for Modular Retrofitting and Smart Connections
published pages: 1057-1062, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2015.11.026
Energy Procedia 78 2019-03-18
2017 Dobelis, M., Kaļinka, M., Borodiņecs, A.
3D Modelling of Existing Buildings from Laser Scanner Data.
published pages: , ISSN: , DOI:
BALTGRAF-14. Proceedings of the Fourteenth International Conference 2019-03-18
2017 Petr Hejtmánek, Martin Volf, Kateřina Sojková, Radek Brandejs, Michal Kabrhel, Michal Bejček, Erik Novák, Antonín Lupíšek
First Stepping Stones of Alternative Refurbishment Modular System Leading to Zero Energy Buildings
published pages: 121-130, ISSN: 1876-6102, DOI: 10.1016/j.egypro.2017.03.014
Energy Procedia 111 2019-03-18
2016 Lupisek, A., Volf, M., Hejtmanek, P., Sojkova, K., Tywoniak, J., & Op\'t Veld
Introduction of a methodology for deep energy retrofitting of post-war residential buildings in central Europe to zero energy level.
published pages: , ISSN: 1335-4205, DOI:
Komunikacie 2019-03-18

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MORE-CONNECT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MORE-CONNECT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.1.)

EERAdata (2019)

Data-driven decision-support to increase energy efficiency through renovation in European building stock.

Read More  

U-CERT (2019)

Towards a new generation of user-centred Energy Performance Assessment and Certification; facilitated and empowered by the EPB Center

Read More  

sEEnergies (2019)

Quantification of synergies between Energy Efficiency first principle and renewable energy systems

Read More