Opendata, web and dolomites

WORLDTIMING

ULTRA ACCURATE WORLD TIMING SERVICES

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 WORLDTIMING project word cloud

Explore the words cloud of the WORLDTIMING project. It provides you a very rough idea of what is the project "WORLDTIMING" about.

surface    services    time    utc    born    validation    standard    signal    traceable    originally    smart    charge    facilities    deploying    infrastructures    customers    scientific    ps    respect    market    accuracy    business    confirm    trading    signals    longer    networks    distribute    government    requiring    ultra    timing    steer    accurate    fibres    metrology    telecom    vulnerability    wr    industrial    extension    frequency    exploring    purpose    facility    positioning    communication    national    stock    critical    strategy    bandwidth    strategies    sectors    terrestrial    penetrate    emergent    1000    sub    compare    clocks    easily    redundant    white    rabbit    markets    proper    agency    solution    distributing    optical    dependable    institutes    conventionally    ethernet    grid    distances    nanosecond    dependent    partnership    segment    final    appropriate    distributed    galileo    synchronization    satellite    km    network    commercialization    standards    nmis    plan    negligible    maximizing    traceability    cern   

Project "WORLDTIMING" data sheet

The following table provides information about the project.

Coordinator
SEVEN SOLUTIONS SL 

Organization address
address: OFICINA 13 - EDF.CETIC(CENTRO DE EMPRESAS DE LAS TECNOLOGÍAS DE LA INFORMACIÓN Y LA COMUNICACIÓN) C/PERIODISTA RAFAEL GÓMEZ MONTERO, 2.
city: GRANADA
postcode: 18014
website: www.sevensols.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.sevensols.com/en/projects/worldtiming.html
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.2.1.6. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies – Space)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-06-01   to  2015-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SEVEN SOLUTIONS SL ES (GRANADA) coordinator 50˙000.00

Map

 Project objective

The project aims at distributing ultra-accurate and traceable timing through optical fibres. The goal is to provide traceable, accurate and cost-effective timing information for the Galileo Time System and for customers requiring highly dependable distributed synchronization applications. The target customers include government authorities as European Galileo Agency (for the Galileo surface segment) and customers in Telecom, Smart-Grid, stock market (high frequency trading) and highly accurate positioning markets (conventionally dependent on satellite signals). The use of terrestrial timing distribution allows National Metrology Institutes (NMIs) in charge of Galileo Time Validation Facility to compare their clocks and steer to UTC, maximizing the traceability of Galileo System Time and enhancing its accuracy. In addition, this allows deploying a terrestrial time network for industrial applications, traceable with respect to UTC and Galileo, robust against satellite signal vulnerability problems and providing redundant time services for critical infrastructures.

This is possible with the emergent White Rabbit (WR) solution which is a sub-nanosecond accurate timing technology originally born at CERN for scientific facilities. WR is an extension of the standard Ethernet based on time distribution standards. As an extension of Ethernet, it can be easily integrated with existing communication networks at negligible bandwidth cost and can distribute time and frequency signals with 100 ps accuracy over distances longer than 1000 Km.

The purpose of this project is to confirm a business plan and develop in detail an appropriate strategy to penetrate the market. This includes a proper market analysis (existing markets and emergent applications), partnership strategies and concrete commercialization plan for those sectors. In phase 1, we will focus on exploring the specific characteristics of different potential customers and final application sectors.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WORLDTIMING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WORLDTIMING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.6.;H2020-EU.2.3.1.)

ReadyToSail (2016)

ReadyToSail

Read More  

HEART (2018)

HIGH HEAT REJECTION THERMAL CONTROL SYSTEM

Read More  

OSMOSIS (2017)

One Step Modification of Space-Integrated Systems

Read More