Opendata, web and dolomites

MODBRIDGE

Modular 100% Carbon Fibre Footbridge

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 MODBRIDGE project word cloud

Explore the words cloud of the MODBRIDGE project. It provides you a very rough idea of what is the project "MODBRIDGE" about.

exhibitions    light    price    pedestrians    installation    manufacturing    840    trade    traffic    industrial    enhanced    concerts    minimal    construction    reduce    structure    weight    modules    cities    administrations    capacity    weathering    solutions    lighter    assembled    close    solution    45    transportation    consist    roi    preliminary    representing    assembly    modular    lower    events    effectiveness    vs    industry    disassembly    storage    first    steel    architectural    local    environmental    rapid    mobility    civil    vulnerable    shows    our    fifth    investment    18    stackable    wanted    return    automation    requiring    obstacles    considering    performance    excellent    cyclists    projections    automate    obtaining    modbridge    outstanding    maintenance    temporary    throw    reutilization    chain    mainly    footbridges    load    day    road    cfc    municipalities    corrosion    supply    nature    zero    recurring    675    resistant    instead    lengths    times    single   

Project "MODBRIDGE" data sheet

The following table provides information about the project.

Coordinator
FIBERTECH GROUP SRL 

Organization address
address: Via Stazione 120
city: Mornago
postcode: 21020
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.fibertechgroup.it/en/cosa-facciamo/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-09-01   to  2016-01-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FIBERTECH GROUP SRL IT (Mornago) coordinator 50˙000.00

Map

 Project objective

Our MODBRIDGE project aims to develop and automate an industrial manufacturing process covering the whole supply chain for the production of modular 100 % CFC footbridges, which will enable to reduce production costs of CFC while obtaining a product with outstanding performance: our footbridges consist on 3 m long modules which can be assembled to reach lengths of up to 18 m, which have a load capacity close to that of concrete with a structure that is 20 times lighter. Moreover they are highly resistant to weathering and corrosion from environmental conditions, requiring zero maintenance for the first five years. In addition, its modular nature (with stackable modules to facilitate storage and transportation) and its light weight enable a simple and rapid assembly/disassembly (1 day for an 18 m long MODBRIDGE) and thus the reutilization of the product as many times as wanted, representing a much more cost-effective solution than traditional footbridges based on steel or concrete. Based on these characteristics, MODBRIDGE represents an excellent solution to be used in cities for the enhanced mobility of vulnerable road users, i.e. cyclists and pedestrians, over traffic or architectural obstacles with a minimal installation impact or for temporary events like trade shows, concerts or exhibitions. Moreover, the automation of our production will allow us to even its price to those of traditional solutions (€ 6,000 /unit vs. € 5,840 /unit for steel or € 5,675 /unit for concrete), increasing its cost-effectiveness: our installation and maintenance costs are much lower and our product requires a single investment instead of facing recurring costs. Considering that MODBRIDGE is aimed at the civil construction sector (mainly municipalities, local administrations, etc.) and the temporary events industry, our preliminary projections throw a Return on Investment (ROI) of 2.45 by the fifth year.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MODBRIDGE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MODBRIDGE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

GT WHR system (2015)

Green Turbine WHR System

Read More  

eco-railjacket (2015)

Total Full Ecologic Embedded Railways Jacket System

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More