Opendata, web and dolomites

MODBRIDGE

Modular 100% Carbon Fibre Footbridge

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 MODBRIDGE project word cloud

Explore the words cloud of the MODBRIDGE project. It provides you a very rough idea of what is the project "MODBRIDGE" about.

first    road    corrosion    pedestrians    excellent    installation    resistant    mainly    45    steel    fifth    effectiveness    assembled    chain    675    exhibitions    minimal    civil    single    obstacles    enhanced    load    industry    solution    considering    rapid    throw    consist    construction    automation    instead    modular    mobility    modules    recurring    light    nature    requiring    18    investment    performance    cities    cfc    structure    our    local    reutilization    concerts    municipalities    shows    industrial    temporary    close    automate    solutions    maintenance    price    lower    weathering    modbridge    representing    footbridges    return    vs    wanted    lengths    capacity    trade    lighter    times    840    roi    preliminary    assembly    manufacturing    transportation    storage    traffic    zero    supply    stackable    obtaining    reduce    weight    environmental    disassembly    vulnerable    projections    cyclists    day    administrations    outstanding    architectural    events   

Project "MODBRIDGE" data sheet

The following table provides information about the project.

Coordinator
FIBERTECH GROUP SRL 

Organization address
address: Via Stazione 120
city: Mornago
postcode: 21020
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.fibertechgroup.it/en/cosa-facciamo/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-09-01   to  2016-01-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FIBERTECH GROUP SRL IT (Mornago) coordinator 50˙000.00

Map

 Project objective

Our MODBRIDGE project aims to develop and automate an industrial manufacturing process covering the whole supply chain for the production of modular 100 % CFC footbridges, which will enable to reduce production costs of CFC while obtaining a product with outstanding performance: our footbridges consist on 3 m long modules which can be assembled to reach lengths of up to 18 m, which have a load capacity close to that of concrete with a structure that is 20 times lighter. Moreover they are highly resistant to weathering and corrosion from environmental conditions, requiring zero maintenance for the first five years. In addition, its modular nature (with stackable modules to facilitate storage and transportation) and its light weight enable a simple and rapid assembly/disassembly (1 day for an 18 m long MODBRIDGE) and thus the reutilization of the product as many times as wanted, representing a much more cost-effective solution than traditional footbridges based on steel or concrete. Based on these characteristics, MODBRIDGE represents an excellent solution to be used in cities for the enhanced mobility of vulnerable road users, i.e. cyclists and pedestrians, over traffic or architectural obstacles with a minimal installation impact or for temporary events like trade shows, concerts or exhibitions. Moreover, the automation of our production will allow us to even its price to those of traditional solutions (€ 6,000 /unit vs. € 5,840 /unit for steel or € 5,675 /unit for concrete), increasing its cost-effectiveness: our installation and maintenance costs are much lower and our product requires a single investment instead of facing recurring costs. Considering that MODBRIDGE is aimed at the civil construction sector (mainly municipalities, local administrations, etc.) and the temporary events industry, our preliminary projections throw a Return on Investment (ROI) of 2.45 by the fifth year.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MODBRIDGE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MODBRIDGE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

GT WHR system (2015)

Green Turbine WHR System

Read More