Opendata, web and dolomites

DTD SYSTEM

A disruptive innovation for the minimisation of railway maintenance costs

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 DTD SYSTEM project word cloud

Explore the words cloud of the DTD SYSTEM project. It provides you a very rough idea of what is the project "DTD SYSTEM" about.

optimal    infrastructure    performed    solutions    rail    railway    869    precision    aminsa    detectors    20    strategy    moment    yearly    damage    operator    safeguard    failures    funds    pilot    choose    worth    minimise    accurately    anticipate    onset    deterioration    operations    occurrence    spain    indicate    competitive    market    diagnosis    advantage    99    nowadays    train    overcomes    competitors    intellectual    invest    readily    algorithms    million    350    operationally    added    accuracy    wheel    lower    limitations    alliances    strategic    plan    defects    additionally    deployment    managers    repairing    thanks    maintenance    wheels    wid    fgc    demonstration    superior    poor    elaboration    intelligence    innovative    damages    track    rate    software    predictive    property    caused    monitor    artificial    validated    stakeholders    public    tracks    dtd    technically    price    works    nearly    companies    module    opens    quick    business    filtering    preventive    expenditures    61    prevent    reduce    optimum    detecting   

Project "DTD SYSTEM" data sheet

The following table provides information about the project.

Coordinator
AGRUPACION MEDITERRANEA DE INGENIERIA SA 

Organization address
address: CALLE JUAN DE RIBERA 17
city: RIBA ROJA DE TURIA
postcode: 46190
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2016-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AGRUPACION MEDITERRANEA DE INGENIERIA SA ES (RIBA ROJA DE TURIA) coordinator 50˙000.00

Map

 Project objective

Rail infrastructure managers in Europe invest yearly over €869 Million (from public funds) in repairing railway track damages caused by the poor conditions of train wheels. Nowadays, the most advanced systems to monitor the conditions of the train wheels (WID or Wheel Impact Detectors) to prevent/ minimise the damage produced to the railway track cannot anticipate accurately the occurrence of the failure or indicate to the train operating companies which maintenance operations must be performed and when it is the optimum moment. AMINSA have developed DTD System, an innovative system capable of detecting with high precision wheel defects at the onset of deterioration, and using this information to design a predictive maintenance plan. The added value of DTD SYSTEM compared to its competitors is based on:

- Its superior accuracy thanks to the new filtering process carried out by its innovative analysis module (DTD system has been readily technically and operationally validated with a 99% success rate on the tracks of FGC-Spain). - Its ability to design an optimal preventive maintenance plan for wheel defects through a new software that works as a diagnosis module using artificial intelligence algorithms (train operator companies will reduce the number of failures and maintenance expenditures in their wheels by more than 20%). - Its lower price, up to 350,000 € less per unit than available WID systems in the market.

DTD SYSTEM overcomes all limitations of the state-of the-art solutions available on the market, and looking at Europe only, opens the way to the market worth of nearly 61 M€

In Phase 1, we will focus on the elaboration of a comprehensive business plan and establish strategic alliances with key stakeholders, ensuring a quick market deployment through the development of a pilot or demonstration element in Phase 2. Additionally, we will choose the best intellectual property strategy to safeguard our competitive advantage.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DTD SYSTEM" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DTD SYSTEM" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

DTD SYSTEM 2 (2017)

A disruptive innovation for the minisation of railway mantenance costs

Read More  

GMP (2017)

Green Marine Propulsion

Read More