Opendata, web and dolomites

VULKANO SIGNED

Novel integrated refurbishment solution as a key path towards creating eco-efficient and competitive furnaces

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "VULKANO" data sheet

The following table provides information about the project.

Coordinator
FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS 

Organization address
address: PARQUE EMPRESARIAL DINAMIZA, AVDA. DE RANILLAS, 3D
city: ZARAGOZA
postcode: 50018
website: www.fcirce.es

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.vulkano-h2020.eu/
 Total cost 6˙940˙813 €
 EC max contribution 6˙940˙813 € (100%)
 Programme 1. H2020-EU.2.1.5.3. (Sustainable, resource-efficient and low-carbon technologies in energy-intensive process industries)
 Code Call H2020-SPIRE-2016
 Funding Scheme RIA
 Starting year 2016
 Duration (year-month-day) from 2016-07-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS ES (ZARAGOZA) coordinator 1˙114˙687.00
2    BOSIO PROIZVODNO-TRGOVSKO PODJETJE DOO SI (CELJE) participant 980˙625.00
3    INSTYTUT ENERGETYKI PL (WARSZAWA) participant 836˙130.00
4    RINA CONSULTING - CENTRO SVILUPPO MATERIALI SPA IT (ROMA) participant 697˙188.00
5    VALJI PROIZVODNJA VALJEV IN ULITKO DOO SI (STORE) participant 601˙750.00
6    FIVES STEIN FR (MAISONS-ALFORT) participant 587˙823.00
7    TORRECID SA ES (ALCORA CASTELLON) participant 587˙187.00
8    FUNDACION TECNALIA RESEARCH & INNOVATION ES (DERIO BIZKAIA) participant 453˙312.00
9    PHASE CHANGE MATERIAL PRODUCTS LTD UK (PETERBOROUGH CAMBS) participant 321˙952.00
10    FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. DE (MUNCHEN) participant 268˙750.00
11    ASAS ALUMINYUM SANAYI VE TICARET ANONIM SIRKETI TR (ISTANBUL) participant 252˙500.00
12    FUNDACION CIDAUT ES (VALLADOLID) participant 238˙906.00

Map

 Project objective

The main goal of VULKANO is the retrofitting of two types of industrial furnaces, namely preheating and melting, applied on three energy–intensive sectors (steel, ceramic and aluminium) with a huge number of potential users in Europe. Thus, this project aims to design, implement and validate an advanced retrofitting integrated solution to increase the energy and environmental efficiency in existing industrial furnaces fed with NG; through the combined implementation of new solutions based on high temperature phase change materials, new refractories, optimised co-firing of NG and syngas from biomass or process gas, an advanced monitoring and control system and an holistic in-house predictive tool. All together will achieve a 20% increase in the energy efficiency of furnaces. On top of that, the realistic and powerful holistic tool will also able to optimize the integration of the solution with upstream/downstream perspective, following a life cycle and cost thinking. This predictive tool will support plant operators and decision makers to select most suitable retrofitting strategy for their plants, fostering overall efficiency, increase in competitiveness and circular economy and reducing the environmental impact of the product value chain from an LCA and LCC perspective. The retrofitting solutions will be tested at TRL 7 in two real facilities in Ceramic (Spain) and Steel (Slovenia) sector, validating the replicability of such solutions in a third sector (Aluminium-Turkey). VULKANO addresses the main challenge when facing furnaces retrofitting, which is tackling the problem from an overall and cost thinking perspective, which will enable overcoming the barriers for energy efficiency improvements. A well balanced consortium formed by end-users, technology solutions providers and research organizations ensures successful achievement of objectives, which will allow a wide spreading replication strategy towards furnaces retrofitting towards modern and efficient designs

 Deliverables

List of deliverables.
Mid-term report on communication and dissemination activities Documents, reports 2019-07-30 14:03:26
Description of User Requirements Specification for MC&S in industrial furnaces Documents, reports 2019-05-31 18:21:57
Communication and Dissemination Plan Documents, reports 2019-05-31 18:21:57
Project website operative Other 2019-05-31 18:22:01
CFD Simulation of syngas/natural gas co-combustion results Documents, reports 2019-05-31 18:21:56
Feasibility of the natural gas substitution by the different syngas sources Documents, reports 2019-05-31 18:21:53

Take a look to the deliverables list in detail:  detailed list of VULKANO deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "VULKANO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "VULKANO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.5.3.)

RETROFEED (2019)

Implementation of a smart RETROfitting framework in the process industry towards its operation with variable, biobased and circular FEEDstock

Read More  

DESTINY (2018)

Development of an Efficient Microwave System for Material Transformation in  energy INtensive processes for an improved Yield

Read More  

PreMa (2018)

Energy efficient, primary production of manganese ferroalloys through the application of novel energy systems in the drying and pre-heating of furnace feed materials.

Read More