Opendata, web and dolomites

LT SIGNED

LaserTrain

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 LT project word cloud

Explore the words cloud of the LT project. It provides you a very rough idea of what is the project "LT" about.

spots    million    debut    blows    autumn    stop    damages    orders    secondly    pulled    track    layer    banedanmark    house    flat    lasertrains    failed    operator    mta    locomotives    lps    away    prospects    travels    ready    sliding    solution    pkp    notoriously    manager    showing    ip    meet    lights    powered    75    wheels    energy    few    contamination    launching    tribology    bahn    delays    tracks    braking    annual    time    rail    wheel    uk    train    slippery    traction    competition    295    wagon    simulation    leaves    layers    standalone    operations    live    finance    list    railways    307    parts    look    commercial    helps    nl    trains    de    pl    severe    dk    pulses    lasertrain    closely    km    familiar    damaging    safety    rust    total    finished    vaporized    protect    infrastructure    cleans    network    engineering    red    bank    road    full    island    laser    feasibility    320    vital    leads    2017    march    clean    customer    separate    shows    prototype    hinder    huge    anyone    september    repairs    multiple    deutsche    slipping    oil    lower    demand    estimates    stations    cleaning    heating    firstly    dutch   

Project "LT" data sheet

The following table provides information about the project.

Coordinator
LASER TRIBOLOGY BV 

Organization address
address: HAPARANDAWEG 57
city: AMSTERDAM
postcode: 1013 BD
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2020-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    LASER TRIBOLOGY BV NL (AMSTERDAM) coordinator 50˙000.00

Map

 Project objective

Anyone who travels by train is familiar with delays. Track contamination such as rust, oil and most notoriously autumn leaves cause the tracks to become slippery. Research shows that this leads to 75% lower traction and as a result to severe safety issues from the reduced braking ability. Low traction also leads to slipping and sliding wheels creating ‘flat spots’ and damages wheel and track. Launching customer MTA Long Island Rail Road estimates the cost of wheel repairs at €3.000 each and that for a total of 3.307 wheels in 2017. As for safety issues, in 2017 in the UK 295 trains failed to stop at stations or red lights. The UK infrastructure manager Network Rail shows that slippery tracks cost them an annual €320 million, showing that there is need for a working solution.

Laser Tribology B.V. (LPS) has developed the solution: the LaserTrain. Using high-powered laser pulses the slippery contamination layer is vaporized from the track, without heating up or damaging the track. The LaserTrain is a separate wagon that can be pulled by locomotives in any operator’s network. A few dedicated cleaning LaserTrains clean the network between September and March when the contamination layers hinder operations. After three years of R&D, a full in-house simulation and a prototype on live track the system is now ready for a debut in Europe. The system is fully standalone, requires only energy and cleans at 80 km/h, so it blows away the competition in every aspect.

In Europe there is a long list of prospects following our development closely, such as Network Rail (UK), Banedanmark (DK), Dutch Railways (NL), Deutsche Bahn (DE) and PKP (PL). To meet their demand, engineering on an 80 km/h LaserTrain has finished. Now it’s time to protect the most vital parts of the IP and make it a huge commercial success in Europe. This feasibility study helps do just that. Firstly we look at how bank funding allows us to pre-finance multiple orders. Secondly we improve our knowledge protect

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

Skye (2018)

Redefining Drone Safety and Autonomous Operation for Indoor Commercial Applications

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More