Opendata, web and dolomites

LT SIGNED

LaserTrain

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 LT project word cloud

Explore the words cloud of the LT project. It provides you a very rough idea of what is the project "LT" about.

wheel    delays    75    estimates    track    travels    deutsche    leaves    blows    slipping    failed    commercial    bank    look    ready    march    simulation    de    demand    energy    layers    live    vital    finished    secondly    leads    feasibility    house    prototype    pkp    debut    pulled    few    powered    dutch    safety    stations    heating    road    trains    away    railways    operations    showing    meet    lower    customer    annual    autumn    huge    lasertrain    manager    pulses    tribology    cleaning    island    uk    braking    orders    closely    standalone    layer    network    307    list    train    red    pl    helps    hinder    repairs    total    sliding    familiar    damaging    banedanmark    spots    cleans    protect    lights    ip    vaporized    prospects    damages    lasertrains    infrastructure    full    launching    engineering    lps    295    wheels    competition    finance    stop    wagon    shows    2017    locomotives    firstly    contamination    parts    rust    rail    slippery    notoriously    km    320    anyone    flat    traction    laser    bahn    multiple    solution    mta    severe    separate    time    dk    oil    million    operator    clean    september    nl    tracks   

Project "LT" data sheet

The following table provides information about the project.

Coordinator
LASER TRIBOLOGY BV 

Organization address
address: HAPARANDAWEG 57
city: AMSTERDAM
postcode: 1013 BD
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2020-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    LASER TRIBOLOGY BV NL (AMSTERDAM) coordinator 50˙000.00

Map

 Project objective

Anyone who travels by train is familiar with delays. Track contamination such as rust, oil and most notoriously autumn leaves cause the tracks to become slippery. Research shows that this leads to 75% lower traction and as a result to severe safety issues from the reduced braking ability. Low traction also leads to slipping and sliding wheels creating ‘flat spots’ and damages wheel and track. Launching customer MTA Long Island Rail Road estimates the cost of wheel repairs at €3.000 each and that for a total of 3.307 wheels in 2017. As for safety issues, in 2017 in the UK 295 trains failed to stop at stations or red lights. The UK infrastructure manager Network Rail shows that slippery tracks cost them an annual €320 million, showing that there is need for a working solution.

Laser Tribology B.V. (LPS) has developed the solution: the LaserTrain. Using high-powered laser pulses the slippery contamination layer is vaporized from the track, without heating up or damaging the track. The LaserTrain is a separate wagon that can be pulled by locomotives in any operator’s network. A few dedicated cleaning LaserTrains clean the network between September and March when the contamination layers hinder operations. After three years of R&D, a full in-house simulation and a prototype on live track the system is now ready for a debut in Europe. The system is fully standalone, requires only energy and cleans at 80 km/h, so it blows away the competition in every aspect.

In Europe there is a long list of prospects following our development closely, such as Network Rail (UK), Banedanmark (DK), Dutch Railways (NL), Deutsche Bahn (DE) and PKP (PL). To meet their demand, engineering on an 80 km/h LaserTrain has finished. Now it’s time to protect the most vital parts of the IP and make it a huge commercial success in Europe. This feasibility study helps do just that. Firstly we look at how bank funding allows us to pre-finance multiple orders. Secondly we improve our knowledge protect

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More  

Skye (2018)

Redefining Drone Safety and Autonomous Operation for Indoor Commercial Applications

Read More  

BeatsDigTherapeutics (2019)

Project SCALE: Tailored Digital Therapeutics for Neurological and Brain Disorders

Read More