Opendata, web and dolomites

e-port SIGNED

Drive your Electric Vehicle with the Power of the sun

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 e-port project word cloud

Explore the words cloud of the e-port project. It provides you a very rough idea of what is the project "e-port" about.

operator    made    days    fibre    context    ev    reduces    dynamic    generate    hence    reduce    carbon    25    power    grow    electric    drawbacks    industrialize    45    big    lowest    prices    market    decreased    opportunity    drastically    points    time    network    assemble    free    vehicle    million    investments    modular    efforts    89    panels    installed    evolution    2025    until    decreasing    leads    plug    impressive    engineering    total    lt    assembly    superior    capacity    last    charging    2026    performance    created    heavy    modules    billion    anywhere    capillarity    vehicles    driving    eliminating    installation    structure    photovoltaic    expansions       sales    customers    expensive    labor    98    cars    create    performing    solar    port    industrial    price    2030    cagr2018    carport    meanwhile    solutions    material    grid    install    weight    profitable    80    43    payback    investment    offers    mobility    lower    steel    rates    carports    play    aluminium    steal    integrate    direct    energy    vs    materials    combination    instead   

Project "e-port" data sheet

The following table provides information about the project.

Coordinator
SECAR TECHNOLOGIE GMBH 

Organization address
address: INDUSTRIEPARK 14
city: HONIGSBERG
postcode: 8682
website: www.secar.at

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2020
 Duration (year-month-day) from 2020-01-01   to  2020-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SECAR TECHNOLOGIE GMBH AT (HONIGSBERG) coordinator 50˙000.00

Map

 Project objective

Electric cars will grow at impressive rates until 2030. In this context big investments are being done in the installation of charging points. These only use power from the grid, which presents three key drawbacks: capacity expansions in the power grid operator are needed, expected increasing power prices will make driving expensive and electric mobility will not be carbon free. Meanwhile, solar photovoltaic has seen a great evolution in the past years where the price of panels has drastically decreased. This offers an opportunity to use solar energy for direct electric vehicle charging at low energy costs. However, solar carports have not been developed at industrial scale because it remains expensive due to engineering efforts to integrate the solar modules in the carport structure, labor to assemble and install the systems and the use of heavy materials like steel to support the structure. We have created e-port, the integrated EV solar carport made as a modular system that can be installed anywhere hence eliminating engineering efforts and allowing to industrialize its production, decreasing assembly cost (by 80%). Furthermore, we offer a plug and play system that drastically reduce installation time (from 10 days down to 1), reduces energy cost by 25% and at last, it is produced with carbon fibre and aluminium instead of heavy materials such as steal. This unique material combination leads to a superior performance at lowest possible weight (45% lower vs. similar solutions). In the very dynamic market of electric vehicles (CAGR2018-2025 of 43.8%) that will reach €40 billion in 2025, we aim to create a very profitable project. With a total investment of €1.89 million, we expect to generate a R.O.I.2026 of 3.98, achieving payback in <3 years. We will achieve that by performing direct sales to large customers and will use a distribution network to reach more capillarity.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "E-PORT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "E-PORT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DNA DS (2019)

DNA Data storage

Read More  

ERGOVIAkinematix (2018)

New wearable measurement devices for Industry 4.0 based on gaming motion-capture system

Read More  

LiCrete (2018)

LiCrete - Light transmitting composite material for building purposes

Read More