Opendata, web and dolomites

e-port SIGNED

Drive your Electric Vehicle with the Power of the sun

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 e-port project word cloud

Explore the words cloud of the e-port project. It provides you a very rough idea of what is the project "e-port" about.

25    price    market    time    network    anywhere    efforts    steel    carport    decreased    superior    materials    capillarity    decreasing    evolution    cars    steal    drastically    sales    fibre    meanwhile    solutions    drawbacks    capacity    integrate    install    big    port    combination    photovoltaic    days    plug    structure    carports    billion    vehicles    impressive    labor    total    carbon    weight    lt    million    89    lower    grid    modules    vs    80    assembly    material    payback    context    charging    rates    panels    play    power    leads    until    2030    created    profitable    offers    engineering    energy    last    heavy       dynamic    ev    expansions    eliminating    reduces    reduce    2026    98    prices    grow    assemble    opportunity    generate    2025    create    industrialize    lowest    driving    electric    modular    operator    direct    installation    mobility    instead    investments    45    points    investment    performance    installed    performing    hence    cagr2018    customers    aluminium    industrial    free    made    solar    43    vehicle    expensive   

Project "e-port" data sheet

The following table provides information about the project.

Coordinator
SECAR TECHNOLOGIE GMBH 

Organization address
address: INDUSTRIEPARK 14
city: HONIGSBERG
postcode: 8682
website: www.secar.at

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2020
 Duration (year-month-day) from 2020-01-01   to  2020-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SECAR TECHNOLOGIE GMBH AT (HONIGSBERG) coordinator 50˙000.00

Map

 Project objective

Electric cars will grow at impressive rates until 2030. In this context big investments are being done in the installation of charging points. These only use power from the grid, which presents three key drawbacks: capacity expansions in the power grid operator are needed, expected increasing power prices will make driving expensive and electric mobility will not be carbon free. Meanwhile, solar photovoltaic has seen a great evolution in the past years where the price of panels has drastically decreased. This offers an opportunity to use solar energy for direct electric vehicle charging at low energy costs. However, solar carports have not been developed at industrial scale because it remains expensive due to engineering efforts to integrate the solar modules in the carport structure, labor to assemble and install the systems and the use of heavy materials like steel to support the structure. We have created e-port, the integrated EV solar carport made as a modular system that can be installed anywhere hence eliminating engineering efforts and allowing to industrialize its production, decreasing assembly cost (by 80%). Furthermore, we offer a plug and play system that drastically reduce installation time (from 10 days down to 1), reduces energy cost by 25% and at last, it is produced with carbon fibre and aluminium instead of heavy materials such as steal. This unique material combination leads to a superior performance at lowest possible weight (45% lower vs. similar solutions). In the very dynamic market of electric vehicles (CAGR2018-2025 of 43.8%) that will reach €40 billion in 2025, we aim to create a very profitable project. With a total investment of €1.89 million, we expect to generate a R.O.I.2026 of 3.98, achieving payback in <3 years. We will achieve that by performing direct sales to large customers and will use a distribution network to reach more capillarity.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "E-PORT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "E-PORT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Primavera (2018)

Primavera: immunobiotics for treating early stage Age-related Macular Degeneration (AMD)

Read More  

Colourganisms (2020)

Microbial production of custom-made, pure and sustainable anthocyanins

Read More  

Click and Spray (2020)

A SIMPLER, CHEAPER AND EASIER TO RECYCLE AEROSOL CONTAINER

Read More