Opendata, web and dolomites

e-port SIGNED

Drive your Electric Vehicle with the Power of the sun

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 e-port project word cloud

Explore the words cloud of the e-port project. It provides you a very rough idea of what is the project "e-port" about.

80    anywhere    hence    panels    days    solutions    material    steel    profitable    structure    generate    million    last    meanwhile    prices    market    opportunity    total    electric    context    assemble    photovoltaic    45    performance    price    2026    points    driving    grow    capillarity    reduce    lower    efforts    carports    2030    modular    labor    carport    expansions    43    installed    sales    steal    performing    lowest    offers    plug    capacity    mobility    customers    heavy    vehicles    superior    assembly    25    modules    big    play    install    investment    direct       impressive    engineering    decreasing    drawbacks    investments    98    created    materials    industrialize    weight    2025    ev    rates    decreased    solar    integrate    carbon    eliminating    aluminium    port    until    operator    vs    power    cagr2018    payback    made    cars    energy    network    industrial    create    time    drastically    fibre    evolution    leads    charging    instead    reduces    dynamic    installation    free    billion    lt    grid    vehicle    combination    expensive    89   

Project "e-port" data sheet

The following table provides information about the project.

Coordinator
SECAR TECHNOLOGIE GMBH 

Organization address
address: INDUSTRIEPARK 14
city: HONIGSBERG
postcode: 8682
website: www.secar.at

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2020
 Duration (year-month-day) from 2020-01-01   to  2020-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SECAR TECHNOLOGIE GMBH AT (HONIGSBERG) coordinator 50˙000.00

Map

 Project objective

Electric cars will grow at impressive rates until 2030. In this context big investments are being done in the installation of charging points. These only use power from the grid, which presents three key drawbacks: capacity expansions in the power grid operator are needed, expected increasing power prices will make driving expensive and electric mobility will not be carbon free. Meanwhile, solar photovoltaic has seen a great evolution in the past years where the price of panels has drastically decreased. This offers an opportunity to use solar energy for direct electric vehicle charging at low energy costs. However, solar carports have not been developed at industrial scale because it remains expensive due to engineering efforts to integrate the solar modules in the carport structure, labor to assemble and install the systems and the use of heavy materials like steel to support the structure. We have created e-port, the integrated EV solar carport made as a modular system that can be installed anywhere hence eliminating engineering efforts and allowing to industrialize its production, decreasing assembly cost (by 80%). Furthermore, we offer a plug and play system that drastically reduce installation time (from 10 days down to 1), reduces energy cost by 25% and at last, it is produced with carbon fibre and aluminium instead of heavy materials such as steal. This unique material combination leads to a superior performance at lowest possible weight (45% lower vs. similar solutions). In the very dynamic market of electric vehicles (CAGR2018-2025 of 43.8%) that will reach €40 billion in 2025, we aim to create a very profitable project. With a total investment of €1.89 million, we expect to generate a R.O.I.2026 of 3.98, achieving payback in <3 years. We will achieve that by performing direct sales to large customers and will use a distribution network to reach more capillarity.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "E-PORT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "E-PORT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DNA DS (2019)

DNA Data storage

Read More  

CAARESYS (2019)

CAARESYS: vehicle passenger monitoring system based on contactless low emission radio frequency radar.

Read More  

Keelcrab (2019)

Keelcrab the Drone for an automated hull cleaning: fast & essential

Read More