Opendata, web and dolomites

PJ28 IAO SIGNED

Integrated Airport Operations

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 PJ28 IAO project word cloud

Explore the words cloud of the PJ28 IAO project. It provides you a very rough idea of what is the project "PJ28 IAO" about.

nets    2014    demonstrating    demonstration    pj28    public       wave1    sequencing    mawp    industrial    pages    covered    later    readiness    takes    departure    maturity    peak    reducing    de    mid    assistance    716    atm    season    requested    controllers    platforms    runway    deg    place    validation    solutions    private    perform    consumption    trust    regulation    cluster    automated    v3    planning    airport    sesar    performing    duty    fuel    pilot    environment    pcp    congestion    partnership    assist    integrating    sesar2020    air    capacity    throughput    sub    constraints    risking    identifier    sju    play    s2020    stated    size    annual    airports    movement    28    demonstrations    period    2016    surface    active    conduct    vld    controller    2019    af    integration    routing    focusses    delays    daily    2015    safety    2020    500    operations    synchronised    deployment    close    traffic    507    sesar1    benefits       functionalities    ir   

Project "PJ28 IAO" data sheet

The following table provides information about the project.

Coordinator
DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV 

Organization address
address: Linder Hoehe
city: KOELN
postcode: 51147
website: www.dlr.de

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website http://www.iao-project.eu
 Total cost 5˙066˙923 €
 EC max contribution 3˙546˙846 € (70%)
 Programme 1. H2020-EU.3.4.7. (SESAR JU)
 Code Call H2020-SESAR-2015-2
 Funding Scheme SESAR-IA
 Starting year 2016
 Duration (year-month-day) from 2016-12-01   to  2020-02-29

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV DE (KOELN) coordinator 1˙212˙233.00
2    INDRA SISTEMAS SA ES (ALCOBENDAS MADRID) participant 700˙000.00
3    HONEYWELL AEROSPACE FR (TOULOUSE) participant 500˙000.00
4    DIRECTION DES SERVICES DE LA NAVIGATION AERIENNE FR (PARIS) participant 427˙000.00
5    SINTEF AS NO (TRONDHEIM) participant 420˙000.00
6    AIRBUS FR (BLAGNAC) participant 102˙181.00
7    THALES AVS FRANCE SAS FR (MERIGNAC) participant 92˙772.00
8    STIFTELSEN SINTEF NO (TRONDHEIM) participant 79˙999.00
9    RIZENI LETOVEHO PROVOZU CESKE REPUBLIKY STATNI PODNIK CZ (JENEC) participant 12˙659.00
10    AIRTEL ATN LIMITED IE (DUN LOAGHAIRE DUBLIN) participant 0.00
11    LETOVE PREVADZKOVE SLUZBY SLOVENSKEJ REPUBLIKY, STATNY PODNIK SK (BRATISLAVA) participant 0.00
12    POLSKA AGENCJA ZEGLUGI POWIETRZNEJ PL (WARSZAWA) participant 0.00
13    SAAB AKTIEBOLAG SE (LINKOPING) participant 0.00
14    STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM NL (AMSTERDAM) participant 0.00
15    VALSTYBES IMONE ORO NAVIGACIJA LT (VILNIAUS) participant 0.00

Map

 Project objective

' This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses the topic “Integrated Airport Operations” with the topic identifier “SESAR.IR-VLD.Wave1-28-2015” as stated in the 2020 MAWP Cluster D.1 High Performing Airport Operations (pages 500-507).

As being part of the Very Large Scale Demonstrations in the Industrial Research & Validation phase, developed under the SJU Private Public Partnership SESAR2020) the objective of PJ28 is perform Very Large Scale Demonstrations (VLD) addressing airport related topics with V3 maturity in SESAR1. In detail, this PJ28 proposal focusses on four Air Traffic Management (ATM) sub-functionalities requested by the Pilot Common Project (PCP Commission Implementation Regulation IR N° 716/2014), all part of ATM Functionality #2 – Airport Integration and Throughput (AF#2) and it will conduct these in a close to operational environment. Doing so, PJ28 will play an active role in the de-risking of the later deployment phase by demonstrating the operational and technical readiness of the SESAR solutions covered in this project and thus ensure trust in the SESAR results.

Those four functionalities aim at: • Improving airport safety; • Improving runway throughput; • Reducing fuel consumption; • Reducing overall delays on the airport; and • Improving airport capacity.

The following sub-functionalities will be implemented in dedicated demonstration platforms: • Departure Management Synchronised with Pre-departure sequencing. • Departure Management integrating Surface Management Constraints. • Automated Assistance to Controller for Surface Movement Planning and Routing. • Airport Safety Nets. '

 Deliverables

List of deliverables.
Disemmination Publicity Video Websites, patent fillings, videos etc. 2020-03-11 14:35:42

Take a look to the deliverables list in detail:  detailed list of PJ28 IAO deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PJ28 IAO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PJ28 IAO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.7.)

AUDIO (2019)

Airspace User supporting Demonstrations of Integrated Airport Operations

Read More  

TRANSIT (2020)

Travel Information Management for Seamless Intermodal Transport

Read More  

PJ19-W2 CI (2019)

PJ.19 W2 Content Integration, Performance Management and Business Case Development

Read More