Opendata, web and dolomites

FINESSE

Feasibility of an INnovative, Efficient, Solid State Energy saving system

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 FINESSE project word cloud

Explore the words cloud of the FINESSE project. It provides you a very rough idea of what is the project "FINESSE" about.

heat    de    standard    plusmn    customer    230    consumption    currents    section    leads    perceived    228m    losses    11    magnetic    conventional    business    230v    actual    fact    13    tested    ultimately    point    consume    return    270    savings    helping    countries    imported    bills    time    protected    electricity    life    yrs    patent    designed    voltages    energy    single    230vac    limitations    representing    consequently    2020    uk    plan    reducing    create    240vac    limit    supply    successful    solutions    upper    maintenance    peak    hysteresis    reduce    reliably    69    lab    unlock    line    readiness    eddy    solved    significantly    jobs    elaborate    stabilising    solution    follow    361    220vac    230v10    investment    optimise    urgent    electrical    input    demanding    50160    70m    differ    virtually    unmet    market    successfully    issue    breakthrough    whilst    is    co2    253v    twh    optimisation    operate    post    voltage    10    feasibility    inefficiency    opportunity    20    rapid    eea    en    253vac    harmonised    sophisticated    mean    initially    reliance    risk    272   

Project "FINESSE" data sheet

The following table provides information about the project.

Coordinator
POWER STABILISATION LIMITED 

Organization address
address: 72/73 Bartholomew Street
city: Newbury
postcode: RG14 5DU
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.ecoadapt.co.uk
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2014
 Duration (year-month-day) from 2014-11-01   to  2015-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    POWER STABILISATION LIMITED UK (Newbury) coordinator 50˙000.00

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

The overall project objective is to successfully develop and to scale up for market readiness, a sophisticated voltage optimisation system that can reduce electrical energy consumption by up to 20%. The EU consume 3,361.69 TWh of electricity p.a and that is growing, as is our reliance on imported energy. EU supply standard EN 50160 has been harmonised at a single phase line voltage of 230Vac ±10%, Consequently actual voltages differ significantly across Europe with from 220Vac, through 230 to 240Vac, with peak mean voltages up to 253Vac. Whilst initially perceived as a UK issue, there are in fact 11 EEA countries which have an upper limit of 230V 10%, and another 13 to follow. The Business Opportunity is that virtually all European electrical equipment is designed to operate most efficiently at 220Vac. This ‘over voltage’ leads to inefficiency and losses, (heat, eddy currents, magnetic hysteresis), increased energy bills, increased maintenance, down-time and reduced equipment life. These problems can be solved by reducing and stabilising the line voltage at the point of use, results in energy savings up to 20% if the input line voltage is 253V (230V10%), thus representing a significant opportunity to reduce electricity bills. As we will demonstrate in section 1.4, conventional solutions and the current state of the art, do not fully solve this problem and have a number of limitations. There is therefore an urgent, unmet need for a system to reliably optimise electrical energy savings and provide a rapid return on investment for the customer. Our breakthrough solution is novel, patent protected and tested at lab scale. We initially require help to undertake a feasibility study to elaborate and de-risk our business plan. If successful we will unlock a market opportunity of €70m, create 70 jobs, reduce energy costs by €228m and CO2 by 272,270 tonnes 5 yrs post project. Ultimately helping Europe achieve demanding 2020 targets.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FINESSE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "FINESSE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

MirrorPV (2015)

MirrorPV - Balanced growth photovoltaic generation with Roof PV mirrors

Read More  

iDriver (2015)

iDriver

Read More