Opendata, web and dolomites

3D SIGNED

DMX Demonstration in Dunkirk

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 3D project word cloud

Explore the words cloud of the 3D project. It provides you a very rough idea of what is the project "3D" about.

aquifers    societal    dtu    mainly    complementary    waste    rtd    plant    fr    8m    dmxtm    transformation    co2    region    chain    axens    markets    relies    cmi    depletion    pilot    trl    oil    grade    solvent    beginning    food    storage    uetikon    compatible    amal    budget    recovered    energy    14    demonstrating    creation    mill    ssh    steel    skills    3d    give    kpi    companies    territory    expectations    heat    building    edge    environmentally    efficient    tco2    north    dealt    downstream    ccs    total    hr    conditioning    industries    unprecedent    2025    rwth    sea    recovery    countries    academics    full    notably    job    dmxb    quality    stakeholder    76    industrial    transport    mtco2    environmental    11    economies    capture    cluster    brevik    lca    acp    gas    smoothing    transversal    transition    skilled    2035    aside    providers    complete    capability    gassco    mt    ifpen    holistic    reaching    dunkirk    hubs    requested    combined    embryo    industrially    deploying    intensive    engineering   

Project "3D" data sheet

The following table provides information about the project.

Coordinator
IFP Energies nouvelles 

Organization address
address: AVENUE DE BOIS PREAU 1 & 4
city: RUEIL MALMAISON
postcode: 92500
website: www.ifpenergiesnouvelles.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Total cost 19˙239˙368 €
 EC max contribution 14˙739˙369 € (77%)
 Programme 1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply)
 Code Call H2020-LC-SC3-2018-NZE-CC
 Funding Scheme RIA
 Starting year 2019
 Duration (year-month-day) from 2019-05-01   to  2023-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    IFP Energies nouvelles FR (RUEIL MALMAISON) coordinator 497˙135.00
2    AXENS SA FR (RUEIL MALMAISON) participant 7˙026˙137.00
3    ARCELORMITTAL ATLANTIQUE ET LORRAINE SAS FR (SAINT DENIS) participant 4˙765˙320.00
4    COCKERILL MAINTENANCE & INGENIERIE BE (SERAING) participant 484˙687.00
5    ACP POLSKA PL (WLOCLAWEK) participant 422˙275.00
6    TOTAL RAFFINAGE CHIMIE FR (COURBEVOIE) participant 387˙292.00
7    DANMARKS TEKNISKE UNIVERSITET DK (KGS LYNGBY) participant 349˙695.00
8    BREVIK ENGINEERING AS NO (BREVIK) participant 300˙416.00
9    RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN DE (AACHEN) participant 249˙871.00
10    CU CHEMIE UETIKON GMBH DE (LAHR) participant 131˙250.00
11    GASSCO AS NO (KOPERVIK) participant 125˙290.00

Map

 Project objective

3D project aims mainly at demonstrating DMXTM CO2 Capture technology in AMAL’s Dunkirk (FR) steel mill on an industrial pilot plant (0.5 tCO2/hr.), bringing TRL from 4 to 7, with 76% of requested EU budget (14,8M€). DMXTM will give Europe an edge in cost, environmental- and energy-efficient recovery of CO2. Downstream requirements are fully considered in studies of conditioning, transport and storage in North Sea aquifers. Waste Heat Recovery well combined with DMXTM process will allow reaching unprecedent CO2 Capture cost under 40 €/tCO2. Environmental, societal and stakeholder’s expectations are dealt from the beginning and all-along the project to ensure capability of deploying the CCS cluster on Dunkirk territory. DMXB solvent production will be optimised industrially and environmentally, through LCA. 3D project is based on an EU holistic approach, building on previous an on-going CCS projects where many 3D partners are involved. 2025 full-scale CCS plant of 1.5 Mt CO2/y will be implemented from end of 3D project which will be an embryo of the future CCS cluster Dunkirk-North Sea 2035 (10 MtCO2/y). It is a major step in the transformation of energy- and CO2-intensive industries such as steel towards EU targets, with opportunities of job creation all along the CO2 CCS chain, notably for Dunkirk region economies and EU storage Hubs. 3D RTD and engineering providers would develop new markets aside from existing Oil & Gas, smoothing environmental and energy-depletion transition. Furthermore, quality of recovered CO2 through DMXTM process is compatible with food-grade markets. The project success relies on of a highly skilled and experienced consortium involving the complete chain of CCS and key transversal skills (LCA, SSH, KPI/TRL/cost assessment). 11 complementary partners from 6 European countries, of 2 academics (RWTH, DTU), 4 technology providers (ACP, GASSCO, IFPEN, UETIKON), 3 engineering companies (AXENS, CMI, BREVIK), 2 end-users (AMAL, TOTAL).

 Publications

year authors and title journal last update
List of publications.
2019 Paul Broutin (IFPEN), Bernard Petetin (ArcelorMittal), Xavier Courtial (Axens), Maxime Lacroix (TOTAL)
3D: A H2020 Project for the Demonstration of the DMXTM Process
published pages: , ISSN: , DOI:
PCCC-5 18 September 2019 2019-11-22
2019 Maxime Lacroix (TOTAL), Paul Broutin (IFPEN), Samuel Lethier (TOTAL), David Nevicato (TOTAL), Bernard Petetin (ArcelorMittal), Eric De Coninck (ArcelorMittal), Xavier Courtial (Axens)
DMX Demonstration in Dunkirk: 3D Project granted by H2020 Scope and Objectives
published pages: , ISSN: , DOI:
TCCS-10 18 June 2019 2019-11-22

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "3D" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "3D" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.2.)

IDEAS (2019)

Novel building Integration Designs for increased Efficiencies in Advanced Climatically Tunable Renewable Energy Systems

Read More  

i4Offshore (2018)

Integrated Implementation of Industrial Innovations for Offshore Wind Cost Reduction

Read More  

TRI-HP (2019)

Trigeneration systems based on heat pumps with natural refrigerants and multiple renewable sources.

Read More